The utility model discloses a reinforced concrete for prestressed tension failure control jack, including cylinder, piston and cylinder sleeve with a groove base composite, disc structure, piston groove also has a disk-shaped structure; composite set by POM set and steel sleeve, both ends of the sleeve for complex steel sleeve; a composite sleeve are installed within the recesses of cylinder and piston in the base. The utility model is used for reinforced concrete prestressed tension failure control jack, in the tensioning process, once the leakage loading anchor clamp, clamp and strand slippage (i.e. slip wire), and broken wires of steel strands in the demolition phenomenon, Jack was first set on the composite the POM heating melt, and then remove the jack, Jack, can effectively protect the anchor and a position limiting plate, and greatly improves the processing efficiency of the tension accident.
【技术实现步骤摘要】
本技术涉及一种千斤顶,尤其涉及一种用于钢筋砼预应力张拉失效控制的千 斤顶。
技术介绍
现有技术中,用于钢筋砼预应力张拉失效控制的千斤顶,包括油缸和活塞,油缸底 座具有圆盘形结构的凹槽,活塞也具有圆盘形结构的凹槽。使用该用于钢筋砼预应力张拉 失效控制的千斤顶时,将限位板安装在油缸底座的凹槽内,将预应力张拉孔内的钢绞线穿 过由锚板和夹片组成的工作锚,再将钢绞线穿过限位板和千斤顶,然后将钢绞线穿过由锚 板和夹片组成的工具锚,安装好后,利用千斤顶进行预应力张拉,千斤顶的油缸底座顶在限 位板上,限位板压在工作锚上,千斤顶的活塞顶在工具锚上,张拉到位后,千斤顶上的活塞 缩回,拆下千斤顶,钢筋砼预应力结束。但从事钢筋砼预应力张拉作业工序的操作人员都知道,该千斤顶在张拉过程中有 几种情况是不可避免的,特别是群锚张拉作业。作业时,往往会发生如下现象(即张拉事故): 一是某一束钢绞线漏装工作夹片;二是夹片质量不稳定,造成夹片在夹紧钢绞线时出现打 滑(即滑丝)现象;三是个别钢绞线断丝现象。上述三种情况中的任一种情形发生均会造成 张拉千斤顶被工具锚上夹片锚紧,即使千斤顶上的活塞缩回也无 ...
【技术保护点】
1.一种用于钢筋砼预应力张拉失效控制的千斤顶,包括油缸(1)和活塞(2),所述油缸底座具有圆盘形结构的凹槽,所述活塞也具有圆盘形结构的凹槽;其特征在于:还包括复合套(3),所述复合套(3)由聚甲醛套(31)和钢套(32)组成,复合套(3)的两端为钢套(32);所述油缸底座的凹槽内和活塞的凹槽内均安装有复合套(3)。
【技术特征摘要】
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。