Manual installation supporting system and method of operating a tunnel steel arch, which comprises a base plate (5), Jack (4), the top rod (3), (2), steel support is characterized in that the base plate (5) is placed in the core soil, the screw jack (4) solid sitting in the bottom a steel plate (5), the spot can be fixed, the top rod (3) connected to the top of the original jack screw rod ends, and the push rod (3) end welding steel support (2), to be on the stage of steel arch flange splicing after steel bearing (2) lifts up the steps of steel arch (1) the appropriate position, through the screw jack (4) of the lifting adjustment to the design height, for subsequent operations of steel arch installation.
【技术实现步骤摘要】
一种隧道钢拱架人工安装支顶系统及操作方法
本专利技术涉及一种隧道钢拱架人工安装支顶系统及操作方法,适用于隧道施工中人工安装钢拱架作业。
技术介绍
三台阶预留核心土法是软岩隧道中采用较多的开挖方法,核心土可有效控制围岩的稳定性,降低掌子面坍塌的风险。上台阶的开挖是隧道施工的重中之重,必须尽快完成喷锚作业,防止拱顶下沉变形过大,稍有延误,会增大掌子面坍塌的风险。而核心土上弧导坑作业空间小,台阶短,机械作业不便,在架设上台阶钢拱架时主要是人工抬举、拼接。由于上台阶钢拱架一般是由3段钢拱架现场拼接而成,体积、质量都比较大,每次施工作业都要占用较多的人力、时间,不仅推迟了上台阶喷锚作业的完成时间,而且施工人员在尚未稳定的的掌子面前作业时间越长,施工的安全风险就越大。
技术实现思路
为了解决上述
技术介绍
中的不足之处,提供一种隧道钢拱架人工安装支顶系统及操作方法,可以有效的提高人工安装钢拱架的效率,同时提高施工的安全性。实现专利技术而采用的技术方案为:一种隧道钢拱架人工安装支顶系统及操作方法,包括底座钢板(5)、螺旋千斤顶(4)、顶杆(3)、槽钢支座(2),其特征在于:底座钢板(5 ...
【技术保护点】
一种隧道钢拱架人工安装支顶系统及操作方法,包括底座钢板(5)、螺旋千斤顶(4)、顶杆(3)、槽钢支座(2),其特征在于:底座钢板(5)放置在核心土上,把螺旋千斤顶(4)稳固坐在底座钢板(5)上,现场点焊固定即可,顶杆(3)连接于螺旋千斤顶原顶杆端头,并在顶杆(3)端头焊接槽钢支座(2),待上台阶钢拱架法兰盘拼接完成后,槽钢支座(2)托举上台阶钢拱架(1)适当部位,通过螺旋千斤顶(4)的升降调整至设计高度,进行钢拱架安装的后续作业。
【技术特征摘要】
1.一种隧道钢拱架人工安装支顶系统及操作方法,包括底座钢板(5)、螺旋千斤顶(4)、顶杆(3)、槽钢支座(2),其特征在于:底座钢板(5)放置在核心土上,把螺旋千斤顶(4)稳固坐在底座钢板(5)上,现场点焊固定即可,顶...
【专利技术属性】
技术研发人员:范春宇,徐松,刘雪冬,邵志远,李德武,马学宁,郑春明,
申请(专利权)人:中铁二十二局哈尔滨铁路建设集团有限责任公司,中铁二十二局集团有限公司,兰州交通大学,
类型:发明
国别省市:黑龙江,23