The utility model relates to a hanging basket for construction of an arch bridge main beam and a construction method thereof, belonging to the technical field of concrete suspension bridge main beam suspension casting construction. The construction of main girder arch bridge hanging basket comprises a bearing platform, a longitudinal beam template below; system; beam front hanging point system, a platform to connect the front bearing, bearing platform and rail; lifting mechanism, a bearing platform and a tail, bearing platform and rail between; anchoring system is arranged between the lifting mechanism and beam before the hanging system, to connect the bearing platform and the rails; walking system, including walking beam orbit arranged on and above the thrust cylinder, hanging leg is arranged on both sides of the longitudinal beam, wherein the bearing platform by hanging leg placed on the walking track, is arranged between the bearing platform and the longitudinal walking rolling wheel. The invention relates to a hanging basket for main beam construction of an arch bridge, which is simple in structure and low in cost. The invention relates to a construction method for the main girder hanging basket of an arch bridge, which can conveniently and flexibly move the hanging basket for continuous construction of the main beam.
【技术实现步骤摘要】
一种拱桥主梁施工挂篮及其施工方法
本专利技术属于混凝土桥主梁悬浇施工技术,尤其涉及一种拱桥主梁施工挂篮及其施工方法。
技术介绍
下承式拱桥具有造型美观、构造简洁、施工快捷、桥面建筑高度小和对不良地质条件的良好适应性等优点,在我国江、浙平原软土地区大量推广应用。下承式拱桥主要由拱肋、主梁及下部结构组成,主梁一般采用箱形截面梁或由纵梁、横梁及桥面板组成的纵横梁体系主梁,对于采用先拱后梁施工工序的下承式混凝土主梁,常规的施工方法一般有支架施工及节段吊装施工。支架施工方法工法简单,施工难度小,但需进行相应地基处理,且对桥下通行或通航有一定影响;节段吊装施工需要场地满足较大型的吊装设备进场及操作要求。本专利技术对采用先拱后梁施工工序的下承式混凝土主梁提出前支点挂篮施工工法,该工法利用拱桥吊索作为挂篮的前支点,从而有效减小挂篮的受力状态,实现主梁的无支架施工。
技术实现思路
为了解决上述技术问题,本专利技术的目的是提供一种结构简单,操作灵活,成本低,对桥下交通影响小的拱桥主梁施工挂篮及其施工方法。本专利技术提供一种拱桥主梁施工挂篮,包括:承重平台,设于纵梁下方;纵梁模板系统,纵梁前吊点系统,设于所述承重平台前部,以连接所述承重平台与所述纵梁;顶升机构,设于所述承重平台尾部,且设于所述承重平台与所述纵梁之间;锚固系统,设于所述顶升机构和所述纵梁前吊系统之间,以连接所述承重平台与所述纵梁;行走系统,包括:设于所述纵梁上方的行走轨道和推进油缸,设于所述纵梁两侧的挂腿,其中所述承重平台能通过所述挂腿安放于所述行走轨道上,设于所述承重平台与所述纵梁之间的行走翻滚轮构。该拱桥主梁施工 ...
【技术保护点】
一种拱桥主梁施工挂篮,其特征在于,包括:承重平台,设于纵梁下方;纵梁模板系统;纵梁前吊点系统,设于所述承重平台前部,以连接所述承重平台与所述纵梁;顶升机构,设于所述承重平台尾部,且设于所述承重平台与所述纵梁之间;锚固系统,设于所述顶升机构和所述纵梁前吊系统之间,以连接所述承重平台与所述纵梁;行走系统,包括:设于所述纵梁上方的行走轨道和推进油缸,设于所述承重平台两侧的挂腿,其中所述承重平台能通过所述挂腿安放于所述行走轨道上,设于所述承重平台与所述纵梁之间的行走翻滚轮构。
【技术特征摘要】
1.一种拱桥主梁施工挂篮,其特征在于,包括:承重平台,设于纵梁下方;纵梁模板系统;纵梁前吊点系统,设于所述承重平台前部,以连接所述承重平台与所述纵梁;顶升机构,设于所述承重平台尾部,且设于所述承重平台与所述纵梁之间;锚固系统,设于所述顶升机构和所述纵梁前吊系统之间,以连接所述承重平台与所述纵梁;行走系统,包括:设于所述纵梁上方的行走轨道和推进油缸,设于所述承重平台两侧的挂腿,其中所述承重平台能通过所述挂腿安放于所述行走轨道上,设于所述承重平台与所述纵梁之间的行走翻滚轮构。2.根据权利要求1所述的一种拱桥主梁施工挂篮,其特征在于,所述纵梁前吊系统包括前吊杆、以及与前吊杆连接的螺纹结构。3.根据权利要求1所述的一种拱桥主梁施工挂篮,其特征在于,还包括设于所述锚固系统和所述顶升机构之间,用于连接所述纵梁和所述承重平台的后吊杆。4.一种拱桥主梁挂篮施工方法,其特征在于,步骤1,浇筑起始节的标准节纵梁;步骤2,装配如权利要求1所述的挂篮;步骤3,利用所述挂篮浇筑下一节的标准节纵梁;步骤4,调整挂篮,使其在下一个工作位进行施工,重复步骤2-4直至纵梁施工完成。5.根据权利要求4所述的一种拱桥主梁挂篮施工方法,其特征在于,所述步骤1中起始节的标...
【专利技术属性】
技术研发人员:王小飞,潘寿东,楼敏,王勤荣,周伟民,肖旺军,李永刚,
申请(专利权)人:中铁十六局集团第三工程有限公司,
类型:发明
国别省市:浙江,33