The utility model relates to an auxiliary technical equipment for tunnel construction, which comprises a supporting bottom plate, a cutting device, a threading pushing device, a threading installation device and a positioning device. The cutting device is connected with the middle and upper end faces of the supporting bottom plate, the threading pushing device is located below the cutting device, the threading pushing device is installed on the top of the supporting bottom plate, and the threading installation device and positioning device are installed on the top of the supporting bottom plate. The installation is connected with the top of the left end of the supporting base plate, and the screw installation device is located at the right end of the positioning device. The screw installation device includes the screw sleeve, the screw claw, the screw claw push rod, the screw chuck plate, the screw chuck push rod, the sleeve fixing frame, the screw rotation mechanism and the pipeline fixing mechanism. The utility model can solve the problems of manual positioning of casing and threads, manual connection of threads and threads, large error of connection between casing and threads, and difficult connection between casing and threads during the construction of casing by the existing pipe shed method.
【技术实现步骤摘要】
一种隧道施工辅助技术设备
本技术涉及隧道施工
,特别涉及一种隧道施工辅助技术设备。
技术介绍
管棚法施工或称伞拱法,是地下结构工程浅埋暗挖时的超前支护结构,其实质是在拟开挖的地下隧道或结构工程的衬砌拱圈隐埋弧线上,预先钻孔并安设惯性力矩较大的钢管,起临时超前支护作用,防止土层坍塌和地表下沉,以保证掘进与后续工艺安全运作;管棚超前支护法是近年发展起来的一种在软弱围岩中进行隧道掘进的新技术,管棚法最早是作为隧道施工的一种辅助方法,在软岩隧道施工中穿越破碎带、松散带、软弱地层,涌水、涌砂层发挥了重要作用,由于预埋超前管棚做顶板及侧壁支撑为后续的隧道开挖奠定了坚实的基础,且施工快、安全性高、工期短,被认为是隧道施工中解决冒顶的最有效最合理的施工方法。管棚法施工的工作流程如下,首先对超前支护区域的顶端进行钻孔施工,一般钻孔深度为二十米左右,钻孔区域在左右二十度,钻孔施工完毕并清理完钻孔时,在钻孔内进行下套管动作,套管一般采用两端带有外丝的套管,丝扣连接在两个套管之间,丝扣为外壁两侧带有凸起且两端为内丝的丝扣,套管与丝扣一般采用人工安装的方式进行,人工对套管的角度进行矫 ...
【技术保护点】
1.一种隧道施工辅助技术设备,包括支撑底板(2)、下料装置(4)、丝扣推送装置(5)、丝扣安装装置(6)和定位装置(7),其特征在于:所述的下料装置(4)与支撑底板(2)的中部上端面相连接,丝扣推送装置(5)位于下料装置(4)的下方,丝扣推送装置(5)安装在支撑底板(2)的顶部上,丝扣安装装置(6)与定位装置(7)均与支撑底板(2)的左端顶部相连接,且丝扣安装装置(6)位于定位装置(7)的右端;其中:所述的丝扣安装装置(6)包括丝扣套筒(61)、丝扣卡爪(62)、丝扣卡爪推杆(63)、丝扣卡板(64)、丝扣卡板推杆(65)、套筒固定架(66)、丝扣旋转机构(67)和管路固定 ...
【技术特征摘要】
1.一种隧道施工辅助技术设备,包括支撑底板(2)、下料装置(4)、丝扣推送装置(5)、丝扣安装装置(6)和定位装置(7),其特征在于:所述的下料装置(4)与支撑底板(2)的中部上端面相连接,丝扣推送装置(5)位于下料装置(4)的下方,丝扣推送装置(5)安装在支撑底板(2)的顶部上,丝扣安装装置(6)与定位装置(7)均与支撑底板(2)的左端顶部相连接,且丝扣安装装置(6)位于定位装置(7)的右端;其中:所述的丝扣安装装置(6)包括丝扣套筒(61)、丝扣卡爪(62)、丝扣卡爪推杆(63)、丝扣卡板(64)、丝扣卡板推杆(65)、套筒固定架(66)、丝扣旋转机构(67)和管路固定机构(68),丝扣套筒(61)的左端上设置有轮齿,丝扣套筒(61)的前后两端均设置有一个卡板孔,丝扣套筒(61)的上下两端均设置两个卡爪孔,丝扣套筒(61)上每个卡板孔内均设置有一个丝扣卡板推杆(65),丝扣卡板推杆(65)的底部与丝扣套筒(61)的外侧面相连接,丝扣卡板推杆(65)的顶部上安装有丝扣卡板(64),丝扣套筒(61)上设置的每个卡爪孔内均设置有一个丝扣卡爪推杆(63),丝扣卡爪推杆(63)的底部与丝扣套筒(61)的外侧面相连接,丝扣卡爪推杆(63)的顶部上安装有丝扣卡爪(62),套筒固定架(66)通过轴承安装在丝扣套筒(61)上,套筒固定架(66)的底部与丝扣旋转机构(67)相连接,丝扣旋转机构(67)与支撑底板(2)相连接,管路固定机构(68)位于丝扣旋转机构(67)的左端,管路固定机构(68)安装在支撑底板(2)的顶部上。2.根据权利要求1所述的一种隧道施工辅助技术设备,其特征在于:所述的下料装置(4)包括丝扣储放盒(41)、储放支架(42)、下料电机(44)、下料转轴(45)、两个下料扇(46)和稳固支架(47),丝扣储放盒(41)的前后两端均安装有一个储放支架(42),储放支架(42)与支撑底板(2)相连接,丝扣储放盒(41)的下端设置有隔离槽,下料电机(44)通过电机套安装在支撑底板(2)的顶部上,下料电机(44)的输出轴通过联轴器与下料转轴(45)的底部相连接,下料转轴(45)的上端上均匀安装有两个下料扇(46),位于下料转轴(45)下方下料扇(46)的位置与丝扣储放盒(41)的底部相对应,位于下料转轴(45)上方下料扇(46)的位置与丝扣储放盒(41)上隔离槽的位置相对应,每个下料扇(46)上均设置有两个扇叶,稳固支架(47)通过轴承安装在下料转轴(45)的中部上,稳固支架(47)与支撑底板(2)相连接。3.根据权利要求1所述的一种隧道施工辅助技术设备,其特征在于:所述的丝扣推送装置(5)包括丝扣推送推杆(51)、旋转支撑板(52)、旋转推杆(53)、丝扣旋转电机(54)、丝扣旋转柱(55)、移动板(56)、支撑滑杆(57)、四个内撑推杆(58)、内撑板(59)、旋转推杆板(510)、正位推杆(511)、正位弧形架(512)和丝扣滚轮(513),旋转支撑板(52)通过丝扣推送推杆(51)安装在支撑底板(2)上,旋转支撑板(52)的右端顶部上安装有旋转推杆板(510),旋转推杆板(510)的左侧面与旋转推杆(53)的底部相连接,旋转推杆(53)的顶部上安装有丝扣旋转电机(54),丝扣旋转电机(54)的输出轴与丝扣旋转柱(55)的左端中部相连接,丝扣旋转柱(55)上对称安装有四个内撑推杆(58),每个内撑推杆(58)的顶部上均安装有一个内撑板(59),内撑板(59)的外侧面为柔性材质,移动板(56)与丝扣旋转电机(54)相连接,移动板(56)的底部上设置有滑槽,移动板(56)上的滑槽内通过滑动配合的方式连接有支撑滑杆(57),支撑滑杆(57)底部安装在旋转支撑板(52)上,正位推杆(511)位于旋转支撑板(52)的左侧,正位弧形架(512)通过正位推杆(511)安装在支撑底板(2)上,正位弧形架(512)的上端面上均匀设置有耳座,丝扣滚轮...
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。