The utility model discloses a single-tube railway tunnel lining structure for controlling large deformation of high geostress diorite, which comprises a tunnel lining section, the radius sizes of R1 and R1 are 243 cm and 283 cm respectively, the angle between R1 and the middle line of the tunnel is 45 degrees, the radius sizes of R2 and R2 are 489 cm and 529 cm respectively, the angle between R2 and R3 is 45 degrees, and the angle between R2 and R3 is 45 degrees. 1. The horizontal distance between O2 and R3 is 174 cm; the radius dimensions of R3 and R3 are 525 cm and 1002 cm, respectively; the angle between R3 and the maximum span of tunnel is 32 4 14; the angle between R3 and the maximum span of tunnel is 20 8 31; the radius dimensions of R4 and R4 are 404 cm and 444 cm, respectively; and the angle between R3 and the middle line of tunnel is 28 1 57. The single-tube railway tunnel controls the lining structure of high geostress diorite with large deformation, adjusts the curvature of the side wall, and enlarges the maximum span of the tunnel by 38 cm.
【技术实现步骤摘要】
一种单管铁路隧道控制高地应力闪长岩大变形的衬砌结构
本技术涉及隧道
,具体为一种单管铁路隧道控制高地应力闪长岩大变形的衬砌结构。
技术介绍
隧道穿越大埋深的闪长岩地层时,围岩处于高或极高地应力状态的特殊地质环境,高地应力作用下,围岩原始状态成压密状,隧道开挖形成临空面后,应力释放和重分布,导致原本压实闭合的结构面张开滑移,沿含充填物结构面以块体滑移、挤出和剪切的形式破坏,并牵引相邻岩块滑落,岩体进一步碎裂化,围岩即刻呈松散状,从而将导致隧道施工大变形的发生,属高地应力破碎围岩变形特殊地质问题,传统的马蹄型隧道衬砌断面形式,由于边墙曲率偏小,抵御侧压力的能力较弱,从而导致边墙变形难以控制,初支变形侵限严重,造成施工难度和风险增大,增加投资,延误工期。
技术实现思路
本技术的目的在于提供一种单管铁路隧道控制高地应力闪长岩大变形的衬砌结构,具有优化支护措施,降低工程费用的优点,解决了现有技术中的问题。为实现上述目的,本技术提供如下技术方案:一种单管铁路隧道控制高地应力闪长岩大变形的衬砌结构,包括隧道衬砌断面,所述隧道衬砌断面由结构尺寸r1、R1、r2、R2、r3、R3、r4、R4围成,r1的半径尺寸为243厘米,R1的半径尺寸为283厘米,且R1与隧道中线的夹角设置为45°;所述r2的半径尺寸为489厘米,R2的半径尺寸为529厘米,R2与r3的夹角为45°;所述r3的半径尺寸为525厘米,R3的半径尺寸为1002厘米,r3与隧道最大跨的夹角设置为32°4′14″,R3与隧道最大跨的夹角设置为20°8′31″;所述r4的半径尺寸为404厘米,R4的半径尺寸为444 ...
【技术保护点】
1.一种单管铁路隧道控制高地应力闪长岩大变形的衬砌结构,包括隧道衬砌断面(1),其特征在于:所述隧道衬砌断面(1)由结构尺寸r1、R1、r2、R2、r3、R3、r4、R4围成,r1的半径尺寸为243厘米,R1的半径尺寸为283厘米,且R1与隧道中线的夹角设置为45°;所述r2的半径尺寸为489厘米,R2的半径尺寸为529厘米,R2与r3的夹角为45°;所述r3的半径尺寸为525厘米,R3的半径尺寸为1002厘米,r3与隧道最大跨的夹角设置为32°4′14″,R3与隧道最大跨的夹角设置为20°8′31″;所述r4的半径尺寸为404厘米,R4的半径尺寸为444厘米,R4与隧道中线的夹角为28°1′57″;所述隧道衬砌断面(1)包括O1、O2,O1为r1与r2的交点,O2为r2反向延长与r3的交点,O1、O2间的水平距离为174厘米。
【技术特征摘要】
1.一种单管铁路隧道控制高地应力闪长岩大变形的衬砌结构,包括隧道衬砌断面(1),其特征在于:所述隧道衬砌断面(1)由结构尺寸r1、R1、r2、R2、r3、R3、r4、R4围成,r1的半径尺寸为243厘米,R1的半径尺寸为283厘米,且R1与隧道中线的夹角设置为45°;所述r2的半径尺寸为489厘米,R2的半径尺寸为529厘米,R2与r3的夹角为45°;所述r3的半径尺寸为525厘米,R3的半径尺寸为1002厘米,r3与隧道最大跨的夹角设置为32°4′14″,R3与隧道最大跨的夹角设置为20°8′31″;所述r4的半径尺寸为404厘米,R4的半径尺寸为444厘米,R4与隧道中线的夹角为28°1′57″;所述隧道衬砌断面(1)包括O1、...