Suitable for high pier and long span steel truss bridge jacking construction method comprises the following steps: on the top of the pier longitudinal installation of non load bearing bracket to the sides, the pier pad stone laying sliding surface within the installation place of horizontal jack, Jack, vertical joists, transfer beam, joist steel pad are arranged at both ends to support steel truss girder, steel girder supported on both sides of the joist steel pad, joists supported on the pier top end, the other end is supported on the bearing bracket, the bearing bracket is arranged on the non roller car, to facilitate the joist top slide in the bracket; start jack, drag the supporting beam, driven by steel truss push forward. Pushing a transfer beam to internode length will be pushed into the bottom of steel truss girder nodes along the bridge, and supported on the vertical jack above start vertical jack top steel truss girder; using horizontal jack will be towed back to the joists, The next cycle of pushing construction is carried out. The invention reduces the risk of construction safety.
【技术实现步骤摘要】
适用于高墩大跨度钢桁梁桥顶推施工方法
:本专利技术涉及桥梁工程施工领域,特别涉及一种适用于高墩大跨度钢桁梁桥顶推施工方法。
技术介绍
:大跨度钢桁梁桥顶推施工通常采用水平连续千斤顶配单滑块拖拉施工,顶推施工过程中支点反力大,墩旁支架受力大。对于高墩大跨度钢桁梁桥,顶推支点反力大,落地墩旁支架高度高,刚度控制难度大,安装难度大,成本高、安全风险高;如采用不落地墩旁托架,则墩旁托架受力大,墩身偏心弯矩大,安全风险高。
技术实现思路
:有鉴于此,有必要提供一种适用于高墩大跨度钢桁梁桥顶推施工方法。一种适用于高墩大跨度钢桁梁桥顶推施工方法,包括以下步骤:在墩顶纵桥向两侧安装非承重托架,墩顶垫石范围内铺设滑动面,安装放置水平千斤顶、竖向千斤顶、托梁、转换梁,托梁两端设置钢垫块用以支撑钢桁梁,钢桁梁支撑于托梁两端钢垫块上,托梁一端支承于墩顶,另一端支承于非承重托架,非承重托架上设置滚轮小车,以方便托梁在托架顶面滑动;启动水平千斤顶,拖动托梁,带动钢桁梁向前顶推,顶推一个节间距离后将转换梁沿横桥向推入钢桁梁节点下方,并支承于竖向千斤顶上方,启动竖向千斤顶起顶钢桁梁;利用水平千斤顶将托梁拖回,继续进行下一循环顶推施工。优选的,适用于高墩大跨度钢桁梁桥顶推施工方法中,先将托架、滚轮小车、滑动面、托梁、竖向千斤顶、水平千斤顶、钢垫块和转换梁结构安装完成,此时钢桁梁节点与桥墩中心对齐,钢桁梁支撑在托梁两端钢垫块上,然后启动水平千斤顶向前顶推,此种状态下,由于托梁刚度大,竖向变形小,非承重托架受力小。优选的,适用于高墩大跨度钢桁梁桥顶推施工方法中,启动水平千斤顶,托梁带动钢桁梁沿顶推 ...
【技术保护点】
一种适用于高墩大跨度钢桁梁桥顶推施工方法,其特征在于:适用于高墩大跨度钢桁梁桥顶推施工方法包括以下步骤:在墩顶纵桥向两侧安装非承重托架,墩顶垫石范围内铺设滑动面,安装放置水平千斤顶、竖向千斤顶、托梁、转换梁,托梁两端设置钢垫块用以支撑钢桁梁,钢桁梁支撑于托梁两端钢垫块上,托梁一端支承于墩顶,另一端支承于非承重托架,非承重托架上设置滚轮小车,以方便托梁在托架顶面滑动;启动水平千斤顶,拖动托梁,带动钢桁梁向前顶推,顶推一个节间距离后将转换梁沿横桥向推入钢桁梁节点下方,并支承于竖向千斤顶上方,启动竖向千斤顶起顶钢桁梁;利用水平千斤顶将托梁拖回,继续进行下一循环顶推施工。
【技术特征摘要】
1.一种适用于高墩大跨度钢桁梁桥顶推施工方法,其特征在于:适用于高墩大跨度钢桁梁桥顶推施工方法包括以下步骤:在墩顶纵桥向两侧安装非承重托架,墩顶垫石范围内铺设滑动面,安装放置水平千斤顶、竖向千斤顶、托梁、转换梁,托梁两端设置钢垫块用以支撑钢桁梁,钢桁梁支撑于托梁两端钢垫块上,托梁一端支承于墩顶,另一端支承于非承重托架,非承重托架上设置滚轮小车,以方便托梁在托架顶面滑动;启动水平千斤顶,拖动托梁,带动钢桁梁向前顶推,顶推一个节间距离后将转换梁沿横桥向推入钢桁梁节点下方,并支承于竖向千斤顶上方,启动竖向千斤顶起顶钢桁梁;利用水平千斤顶将托梁拖回,继续进行下一循环顶推施工。2.如权利要求1所述的适用于高墩大跨度钢桁梁桥顶推施工方法,其特征在于:适用于高墩大跨度钢桁梁桥顶推施工方法中,先将托架、滚轮小车、滑动面、托梁、竖向千斤顶、水平千斤顶、钢垫块和转换梁结构安装完成,此时钢桁梁节点与桥墩中心对齐,钢桁梁支撑在托梁两端钢垫块上,然后启动水平千斤顶向前顶推,此种状态下,由于托梁刚度大,竖向...
【专利技术属性】
技术研发人员:宋伟俊,龚国锋,陈宁贤,张静,曲江峰,王钰,郭万良,连延金,吴广,闫雪松,朱林达,章耀林,张斌,汤和达,冯文园,朱永盛,
申请(专利权)人:中国铁建大桥工程局集团有限公司,
类型:发明
国别省市:天津,12