一种横移平车,包括横移轨道,两个轮箱通过连接板连接后安装在横移轨道上,两个轮箱上安装有千斤顶,千斤顶上设有下滑动板和上滑动板,下滑动板和上滑动板之间设有润滑层。本发明专利技术提供的一种移梁方法及装置,通过预制场的门机和横移平车的配合,实现了移梁操作。克服了现有技术中需要敷设便道,或需要至少两台门机的缺陷,以较少的设备或施工投入,降低了施工成本。经测试,本发明专利技术具有操作简便快捷,使用安全,保证质量、降低成本的优点。

Moving beam method and device

A horizontal flat car, including the track, two wheel box is installed on the track through the connecting plate. After the two round box is installed on the jack, under a sliding plate and a sliding plate which is arranged on the jack, the lubrication layer is arranged between the sliding plate and the sliding plate. The invention provides a beam moving method and a device, which realizes the beam shifting operation through the matching of a portal machine of a prefabricated field and a horizontal shifting flat car. The utility model overcomes the defects that the prior art needs to be laid on the pavement or needs at least two door machines, and the construction cost is reduced by less equipment or construction input. After testing, the invention has the advantages of simple and convenient operation, safe use, guaranteed quality and low cost.

【技术实现步骤摘要】

本专利技术涉及预制拼装梁桥架设施工领域,特别是一种适用于预制场或存梁区与桥梁顺桥向相垂直的施工环境下的一种移梁方法及装置
技术介绍
预制拼装梁桥架设施工中,架设30m箱梁,重量最大约为97t,移梁工艺的设计及施工是预制拼装梁桥架设中的重要环节。传统的比较成熟的移梁工艺有1、填筑便道上桥,牵引车直接从预制场将梁运至架桥机,此方法的优点是在主线外作业,便道可作为整个桥面施工的运输命脉,但该方法受地理条件限制,填筑便道成本较高, 安全系数低,且运梁速度慢,影响铺架进度。2、采用跨线龙门吊,将梁直接提升到桥面的牵引车上然后运至架桥机,实施此方法时,若预制场设在主线内,投入较少且安全系数高,但影响主线施工,延误工期;若预制场设在主线外,需另外投入两台跨线移梁门机,设备成本高,需先将梁从预制场移至跨线门机吊装区,再通过门机吊上桥面,工序繁琐。
技术实现思路
本专利技术所要解决的技术问题是提供一种移梁方法及装置,可以投入较少的设备实现移梁操作。为解决上述技术问题,本专利技术所采用的技术方案是一种横移平车,包括横移轨道,两个轮箱通过连接板连接后安装在横移轨道上,两个轮箱上安装有千斤顶,千斤顶上设有下本文档来自技高网...

【技术保护点】
1.一种横移平车,包括横移轨道(4),其特征在于:两个轮箱(58)通过连接板(59)连接后安装在横移轨道(4)上,两个轮箱(58)上安装有千斤顶(54),千斤顶(54)上设有下滑动板(53)和上滑动板(51),下滑动板(53)和上滑动板(51)之间设有润滑层(52)。