A new supporting structure and its construction method for segment opening of shield tunnel relate to the technical field of shield tunnel, which includes shear key, segment opening, water-swelling water-stop bar and steel cage, and the segment joint around the segment opening is provided with a shear key, and the segment joint is drilled, and the hole is installed with water. Expansion water stop and reinforcement cage. The beneficial effect of the invention is that the segment can be directly broken without additional section steel support, the supporting device does not affect the transportation in the tunnel during construction, and the supporting device has simple construction technology and less investment.
【技术实现步骤摘要】
盾构隧道管片开口的新型支护结构及其施工方法
本专利技术涉及盾构隧道
,具体涉及盾构隧道管片开口的新型支护结构。
技术介绍
目前,盾构隧道的附属结构如联络通道、废水泵房等结构施工时都需要安装临时的型钢支护结构后破除已拼装好的管片结构,再实施洞内开挖施工,为减少管片开口施工对主隧道掘进的干扰及确保管片开口处的结构安全和稳定是盾构隧道管片开口施工中的重难点。一般的支护方式通常是采用型钢结构环撑或门式框架支撑管片,来确保盾构管片开口安全,但是这些措施施工前需清理盾构机的供水供电等管道,中断临时轨道运输,影响盾构机正常掘进的生产调度,或者需要等隧道贯通后方可施工工期较长。为了避免减少管片开口对盾构隧道施工的影响,同时确保管片开口结构安全,需采用剪力键支护管片开口的支护方式。
技术实现思路
本专利技术的目的在于针对现有技术的缺陷和不足,提供一种结构简单、设计合理、使用方便的盾构隧道管片开口的新型支护结构及其施工方法。为实现上述目的,本专利技术采用的技术方案是:盾构隧道管片开口的新型支护结构,它包含剪力键、管片开口、遇水膨胀止水条、钢筋笼;所述的管片开口周边的管片接缝处设有相互切合的剪力键,且管片接缝处钻孔,孔内安装遇水膨胀止水条和钢筋笼。作为优选,所述的孔内浇筑微膨胀混凝土。盾构隧道管片开口的新型支护结构的施工方法,它包含如下步骤:1、掘进通过隧道管片开口区域,盾构管片拼装;2、在盾构隧道管片开口周边的管片接缝处钻孔,钻孔内安装遇水膨胀止水条、固定钢筋笼,浇筑微膨胀混凝土;3、破除管片,实施洞内开挖。本专利技术的工作原理为:通过在盾构隧道管片开口周边的管片接缝处钻孔 ...
【技术保护点】
1.盾构隧道管片开口的新型支护结构,其特征在于:它包含剪力键、管片开口、遇水膨胀止水条、钢筋笼;所述的管片开口周边的管片接缝处设有相互切合的剪力键,且管片接缝处钻孔,孔内安装遇水膨胀止水条和钢筋笼。
【技术特征摘要】
1.盾构隧道管片开口的新型支护结构,其特征在于:它包含剪力键、管片开口、遇水膨胀止水条、钢筋笼;所述的管片开口周边的管片接缝处设有相互切合的剪力键,且管片接缝处钻孔,孔内安装遇水膨胀止水条和钢筋笼。2.盾构隧道管片开口的新型支护结构的施工方法,其特征在于它包含如下步骤:(1...
【专利技术属性】
技术研发人员:孙东波,谢家化,李广涛,魏玉省,何爱华,李献航,曹楷,朱韬,李正华,刘庆方,刘玉杰,
申请(专利权)人:中铁第六勘察设计院集团有限公司,
类型:发明
国别省市:天津,12