The invention discloses a hoisting machine for the whole segment of a cable-stayed bridge laminated beam based on partial load and transversal, which includes the deck of the tower, the whole section of the deck crane and the section beam. The deck of the tower area has been set up with a beam truck and a bridge deck, and the whole section of the crane consists of a beam, a crane, a longitudinal beam, and a front branch. The leg and the rear leg; the first inclined cable support is also arranged on the deck of the bridge deck of the tower area. The first inclined cable support is connected to the top of the tower area through the first cable-stayed cable; the segment beam includes the section Liang Hengliang, the section beam longitudinal beam and the second inclined cable support; the section Liang Zongliang has the section of the section, and the beam and longitudinal beam between the two segments are set up. Three section Liang Hengliang; the second slant cable support is located in the middle of the section beam longitudinal beam; the invention ensures the safety and quality of the construction, and can also improve the efficiency of the construction and reduce the construction cost.
【技术实现步骤摘要】
基于偏载横移的斜拉桥叠合梁整节段吊装桥面吊机
本专利技术涉及一种桥面吊机,更具体地说是它一种基于偏载横移的斜拉桥叠合梁整节段吊装桥面吊机。
技术介绍
传统斜拉桥叠合梁安装工艺为如下两种:一、全回转桥面吊机,该吊机适用于叠合梁钢梁散件安装工艺,安装步骤如下:步骤1将钢梁构件运输至主塔提升站工作区域;步骤2利用提升站提升构件至桥面运梁设备上,转运至回转吊机作业范围;步骤3利用回转吊机依次安装叠合梁边主梁、横梁、小纵梁;步骤4初张斜拉索,安装桥面板,二次张拉斜拉索;步骤5回转吊机前移、就位、锚固,开始下一梁段安装。其优点:工艺成熟,设备通用性强;其缺点:施工高空作业多、质量、安全管控难度大,经济效益差。二、缆索吊机,该吊机适用于叠合梁钢梁整节段安装工艺,安装步骤如下:步骤1将钢梁构件运输至主塔起升设备工作区域;步骤2利用起升设备提升并在桥面范围拼装钢梁构件为节段梁;步骤3利用缆索吊依次吊运、安装节段梁;优点:工艺相对成熟,设备可部分通用。缺点:临时设备组装工作量大,成本高,经济效益差。如何在以上成熟工艺基础上进行突破,能即保证安全、质量,又能提高施工效率,降低施工成本,是目前需要研究、探索、解决的重要课题,也是本专利技术的意义所在。
技术实现思路
本专利技术的目的是为了克服上述
技术介绍
的不足之处,而提供一种基于偏载横移的斜拉桥叠合梁整节段吊装桥面吊机。为了实现上述目的,本专利技术的技术方案为:基于偏载横移的斜拉桥叠合梁整节段吊装桥面吊机,其特征在于:包括塔区、塔区已拼装梁段桥面、整节段桥面吊机和节段梁,所述塔区已拼装梁段桥面位于塔区下部,塔区已拼装梁段桥面的桥面上设 ...
【技术保护点】
1.基于偏载横移的斜拉桥叠合梁整节段吊装桥面吊机,其特征在于:包括塔区(3)、塔区已拼装梁段桥面(1)、整节段桥面吊机(2)和节段梁(4),所述塔区已拼装梁段桥面(1)位于塔区(3)下部,塔区已拼装梁段桥面(1)的桥面上设置有运梁车(1a)和起升设备拼装节段梁(4)时临时设置的桥面胎架(1b),塔区已拼装梁段桥面(1)两端的端部均设置有第一纵梁螺栓(1c);所述整节段桥面吊机(2)安装于塔区已拼装梁段桥面(1)两端上方,整节段桥面吊机(2)包括横梁(2a)、天车(2b)、纵梁(2c)、前支腿(2d)和后支腿(2e);所述天车(2b)安装于横梁(2a)上;所述纵梁(2c)位于横梁(2a)两端,横梁(2a)通过驱动轮结构安装于纵梁(2c)上;所述前支腿(2d)的一端与纵梁(2c)的中部连接,另一端固定在塔区已拼装梁段桥面(1)上;所述后支腿(2e)的一端与纵梁(2c)靠近塔区(3)的一端连接,另一端固定在纵梁(2c)靠近塔区(3)下方的塔区已拼装梁段桥面(1)上;所述塔区已拼装梁段桥面(1)的桥面上还设置有第一斜拉索支座(1d),第一斜拉索支座(1d)位于前支腿(2d)和后支腿(2e)之间 ...
【技术特征摘要】
1.基于偏载横移的斜拉桥叠合梁整节段吊装桥面吊机,其特征在于:包括塔区(3)、塔区已拼装梁段桥面(1)、整节段桥面吊机(2)和节段梁(4),所述塔区已拼装梁段桥面(1)位于塔区(3)下部,塔区已拼装梁段桥面(1)的桥面上设置有运梁车(1a)和起升设备拼装节段梁(4)时临时设置的桥面胎架(1b),塔区已拼装梁段桥面(1)两端的端部均设置有第一纵梁螺栓(1c);所述整节段桥面吊机(2)安装于塔区已拼装梁段桥面(1)两端上方,整节段桥面吊机(2)包括横梁(2a)、天车(2b)、纵梁(2c)、前支腿(2d)和后支腿(2e);所述天车(2b)安装于横梁(2a)上;所述纵梁(2c)位于横梁(2a)两端,横梁(2a)通过驱动轮结构安装于纵梁(2c)上;所述前支腿(2d)的一端与纵梁(2c)的中部连接,另一端固定在塔区已拼装梁段桥面(1)上;所述后支腿(2e)的一端与纵梁(2c)靠近塔区(3)的一端连接,另一端固定在纵梁(2c)靠近塔区(3)下方的塔区已拼装梁段桥面(1)上;所述塔区已拼装梁段桥面(1)的桥面上还设置有第一斜拉索支座(1d),第一斜拉索支座(1d)位于前支腿(2d)和后支腿(2e)之间,第一斜拉索支座(1d)通过第一斜拉索(1d1)与...
【专利技术属性】
技术研发人员:纪登贵,朱晓明,郭欣,孙鹏,谢福勇,纵坤,肖伟,
申请(专利权)人:中交二公局第一工程有限公司,
类型:发明
国别省市:湖北,42