The invention provides a method for installing cryogenic heat pipes, which includes the following steps: before filling the heat pipes with liquid, the heat pipes and shades and mounting plates are tested, and the heat pipe parts that do not meet the assembly requirements are repaired; the vertical ends of U-shaped heat pipes and L-shaped heat pipes are fitted to the inner surface of the shade, and the outer surface of the shade is pasted with secondary surface mirror coating (OSR) sheets; Pipe filling; degumming after assembly of heat pipe, shade and installation plate; collimator installation after installation of all heat pipes; tightening the connection screw between grille reinforcement ribs, installation plate and heat pipe and collimator after installation of shade; after installation of all upper surface parts, the upper cabinet is fixed by flipping and fixing, shock absorber pads, detectors and detectors are installed. After the installation of the pressure frame of the detector and the pressure frame of the detector is completed, the anti-pollution heater is pasted on one side of the pressure frame of the detector. The lead of the anti-pollution heater passes through the through hole of the installation plate and is thrown out of the window hole under the shade.
【技术实现步骤摘要】
一种低温深冷热管的安装方法及低能探测器的装配方法
本专利技术涉及低能探测器热控
,特别涉及一种低温深冷热管的安装方法及低能探测器的装配方法。
技术介绍
LE(low-energy)热控对于低能X射线望远镜是一项非常重要的关键技术,其意义在于热控保证LE探测器SCD正常工作所需要的低温,保证SCD入轨后加热避免污染问题,还保证LE探测器机箱电子学较高的启动温度。SCD探测器在低温-80℃~-45℃范围内性能良好而且稳定,当温度超过-45℃,暗电流会明显增加,探测器能量分辨变差。SCD封装不是完全封闭,而SCD对污染物比较敏感,需要通过热控保证SCD在卫星入轨后首先加热,避免因为低温而吸附污染物。LE探测器下机箱由于采取了辐射散热处理,在卫星入轨后其温度会低于电子学的最低启动温度(-40℃),需要通过热控保证电子学启动温度大于-40℃。热控技术难点在于:1、轨道外热流环境恶劣:首先,LE探测器布局在星外,其低温要求-80℃~-45℃对外热流变化十分敏感,而HXMT卫星选取的轨道高度仅550km,载荷在观测器件所受到的地球红外以及反照外热流情况恶劣,特别是地球红外热流。目前,国外同类X射线天文卫星大多7000km以上的高轨道来避免地球红外以及反照外热流的影响,或者采用对探测器局部热电制冷的主动制冷实现探测器的低温要求。在HXMT卫星目前仅能采用被动辐射散热热控措施的情况下,对LE低温要求的热控设计非常困难。2、多载荷一体安装布局:对于HXMT卫星有效载荷,其为了保证探测器精度要求将不同温度要求的HE、ME和LE探测器均集中安装在同一个主支撑结构上,最大温度 ...
【技术保护点】
1.一种低温深冷热管的安装方法,其特征在于:所述低温深冷热管的安装方法包括如下步骤:在热管充液前,将所述热管与遮光罩和安装板试装,并对不满足装配要求的热管部分进行修配,其中,所述热管至少包括U型热管和L型热管;将所述U型热管和L型热管的垂直端配合安装到所述遮光罩的内表面,所述遮光罩的外表面粘贴二次表面镜涂层(OSR)片;对所述热管进行充液,首先与非标螺母粘贴,要保证粘贴的强度和孔位对正,粘贴完成后要留有足够的固化时间,完全固化后再进行后续的装配;在所述热管、遮光罩和安装板装配完成后,进行除胶;在安装完所有热管之后,安装准直器;在安装完遮光罩之后,拧紧遮光罩栅格加强筋、安装板与热管及准直器之间的连接螺钉;安装所有上表面零件之后,将上机箱翻转固定后,安装减震垫、探测器和探测器压框;以及所述探测器压框安装完成后,在所述探测器压框的一侧粘贴防污染加热片,所述防污染加热片的引线从安装板通孔穿过,从遮光罩下部视窗孔甩出;其中,机箱位于安装基座中,所述机箱与所述安装基座通过安装板吊装螺钉孔实现紧固。
【技术特征摘要】
1.一种低温深冷热管的安装方法,其特征在于:所述低温深冷热管的安装方法包括如下步骤:在热管充液前,将所述热管与遮光罩和安装板试装,并对不满足装配要求的热管部分进行修配,其中,所述热管至少包括U型热管和L型热管;将所述U型热管和L型热管的垂直端配合安装到所述遮光罩的内表面,所述遮光罩的外表面粘贴二次表面镜涂层(OSR)片;对所述热管进行充液,首先与非标螺母粘贴,要保证粘贴的强度和孔位对正,粘贴完成后要留有足够的固化时间,完全固化后再进行后续的装配;在所述热管、遮光罩和安装板装配完成后,进行除胶;在安装完所有热管之后,安装准直器;在安装完遮光罩之后,拧紧遮光罩栅格加强筋、安装板与热管及准直器之间的连接螺钉;安装所有上表面零件之后,将上机箱翻转固定后,安装减震垫、探测器和探测器压框;以及所述探测器压框安装完成后,在所述探测器压框的一侧粘贴防污染加热片,所述防污染加热片的引线从安装板通孔穿过,从遮光罩下部视窗孔甩出;其中,机箱位于安装基座中,所述机箱与所述安装基座通过安装板吊装螺钉孔实现紧固。2.如权利要求1所述的低温深冷热管的安装方法,其特征在于:所述低温深冷热管的安装方法包括如下步骤:安装探测器压框之后进行热实施,进行热实施之后安装上机箱封盖,其中,挠性电路板从所述上机箱封盖的方孔中引出;以及上机箱安装完成后,将所述上机箱固定于所述安装基座上;其中,上机箱的所有安装螺钉在最终装配时均涂有防松胶。3.如权利要求2所述的低温深冷热管的安装方法,其特征在于:其中,所述遮光罩的内表面、安装板的一侧、U型和L型热管上粘贴有热敏电阻。4.如...
【专利技术属性】
技术研发人员:王娟,陈勇,王于仨,周宇鹏,赵欣,崔苇苇,
申请(专利权)人:中国科学院高能物理研究所,
类型:发明
国别省市:北京,11
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。