超深地下室复合外墙结构制造技术

技术编号:8945693 阅读:160 留言:0更新日期:2013-07-21 19:02
超深地下室复合外墙结构,涉及建筑施工技术领域。在主墙体的一个外侧面设置保护层,在保护层的外侧面设置防水层,在防水层的外侧面设置排列的若干桩柱,在防水层的外侧面的相邻桩柱之间设置喷射混凝土层。采用本实用新型专利技术减少了施工量,节约了建造成本,形成的地下室墙体与基坑内表面紧密复合,不但减少了在基坑内表面和地下室墙体间隔之间再填充混凝土的施工,还使复合的地下室墙体更加牢固。(*该技术在2023年保护过期,可自由使用*)

Super deep basement composite external wall structure

The utility model relates to an ultra deep basement composite external wall structure, which relates to the technical field of building construction. Protective layer is arranged on an outer side of the main wall, the waterproof layer is arranged on the outer side of the protective layer, set the number of piles are arranged on the outside surface of the waterproof layer, between adjacent piles in the outer side of the waterproof layer is sprayed concrete layer. The utility model reduces the amount of construction, saving construction cost, the formation of basement wall and foundation pit surface composite, not only reduces the construction and the concrete filled between the surface and the basement wall spacing in the foundation pit, the basement wall composite more firmly.

【技术实现步骤摘要】

本技术涉及建筑施工

技术介绍
在超深(通常指:12m以上)地下室外墙“桩墙合一”施工时,通常先建造地下室围护结构及止水帷幕,然后在地下室围护结构外侧砌筑砖墙,并在围护结构与砖墙间填混凝土,在砖墙外铡粉水泥砂浆后做防水层及防水保护层,做完防水保护层后再绑扎钢筋立内墙模板,浇灌混凝土形成地下室墙体。另外,在施工外墙防水前,需要先砌筑砖墙,所耗费的人力、物力较大。因此,现有的超深地下室外墙施工造价成本居高不下,还存在极大的安全隐患
技术实现思路
本技术目的是提供一种方便施工、安全性好、造价低的超深地下室复合外墙结构。本技术在主墙体的一个外侧面设置保护层,在保护层的外侧面设置防水层,在防水层的外侧面设置排列的若干桩柱,在防水层的外侧面的相邻桩柱之间设置喷射混凝土层。采用本技术无需设立和拆除外墙模板,减少了施工量,节约了建造成本,形成的地下室墙体与基坑内表面紧密复合,不但减少了在基坑内表面和地下室墙体间隔之间再填充混凝土的施工,还使复合的地下室墙体更加牢固。附图说明图1为本技术的结构示意图。具体实施方式本技术在主墙体6的一个外侧面设置保护层5,在保护层5的外侧面设置防水层4,在防水层4的外侧面设置排列的若干桩柱1,在防水层4的外侧面的相邻桩柱I之间设置喷射混凝土层3。

【技术保护点】
超深地下室复合外墙结构,其特征在于包括主墙体,在主墙体的一个外侧面设置保护层,在保护层的外侧面设置防水层,在防水层的外侧面设置排列的若干桩柱,在防水层的外侧面的相邻桩柱之间设置喷射混凝土层。

【技术特征摘要】
1.超深地下室复合外墙结构,其特征在于包括主墙体,在主墙体的一个外侧面设置保护层,在保护层的外侧面...

【专利技术属性】
技术研发人员:赵林
申请(专利权)人:江苏省江建集团有限公司
类型:实用新型
国别省市:

网友询问留言 已有0条评论
  • 还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。

1