The utility model discloses a positioning device for casing pre buried integral ballast bed construction of rail transportation, including a crossbeam, wherein one end of the beam is provided with a fixed card, the other end of the beam is provided with a positioning bracket on the beam between the fixed clamping piece and the positioning bracket is provided with a slide fastener, fixing clip a card and sliding parts are all relatively provided with a horizontal screw, sliding fastener is arranged on the positioning for positioning in the beam of the top wire. The utility model has the advantages of reasonable design, simple structure, convenient installation and operation, repeated use, low cost, improved construction efficiency and guaranteed engineering quality.
【技术实现步骤摘要】
本技术涉及一种工程施工用的定位装置,具体涉及一种用于轨道交通整体 道床施工的螺纹套管预埋定位装置。
技术介绍
在以往轨道交通接触轨的安装施工中,多采用现场钻孔式安装,即在整体道床 上直接钻孔安装。这种安装方法的优点是施工简便,机动性好,而且不受轨道专业制 约。其缺点是在道床上钻孔会破坏混凝土块的应力分布,降低线路质量。另外,由于整 体道床使用大量的钢筋,因此在钻孔时钻头会经常碰到钢筋,使钻孔工作无法进行。
技术实现思路
本技术的目的是针对现有技术存在的不足,提供一种用于轨道交通整体道 床施工的螺纹套管预埋定位装置,在现场浇筑整体道床时,通过本装置将螺纹套管在道 床上定位,预埋在道床内,从而取消了原来在浇筑好的道床上的钻孔作业。本技术的技术方案是一种用于轨道交通整体道床施工的螺纹套管预埋定 位装置,其特征在于包括一横梁,所述横梁的一端设置有固定卡件,横梁的另一端设 置有定位支架,固定卡件与定位支架之间的横梁上设置有滑动卡件,固定卡件和滑动卡 件上均相对设置有水平顶丝,滑动卡件上还设置有用于在横梁上定位的定位顶丝。所述定位支架包括套装在横梁上的滑套和与滑套底部相连接的顶板,顶板通过 螺栓与顶板下方的底板相连接,底板上设置有多个用于放置螺纹套管的通孔。所述固定卡件的断面为L形。本技术与现有技术相比具有以下优点1)本技术设计合理,结构简单,安装、使用方便。2)调整灵活,对纵向、横向以及水平高度等参数均可进行调整。3)安装牢固,工作性能稳定,能够经受住道床浇注时的震动以及施工中的一般 碰撞,不会发生偏移。4)可降低工程成本,提高施工效率,确保工程质量。4)可降低工程成本, ...
【技术保护点】
一种用于轨道交通整体道床施工的螺纹套管预埋定位装置,其特征在于:包括一横梁(1),所述横梁(1)的一端设置有固定卡件(2),横梁(1)的另一端设置有定位支架(3),固定卡件(2)与定位支架(3)之间的横梁(1)上设置有滑动卡件(5),固定卡件(2)和滑动卡件(5)上均相对设置有水平顶丝(6),滑动卡件(5)上还设置有用于在横梁(1)上定位的定位顶丝(7)。
【技术特征摘要】
【专利技术属性】
技术研发人员:杜银龙,彭成宽,江新剑,杨保成,李志龙,刘月峰,肖代宁,国亚晨,尉文祥,窦铁成,
申请(专利权)人:中铁一局集团有限公司,
类型:实用新型
国别省市:87
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。