The utility model discloses a pile for treatment of low embankment, railway soft soil foundation including composite foundation in embankment core stress area, the embankment core stress zone for ballastless track on both sides of the support layer 45 degrees below the regional diffusion angle range of the composite foundation are arranged on the top surface of the gravel cushion the middle of the gravel cushion, with geogrid, embankment is located in the core force in a bored pile, the bored pile top is provided with a reinforced concrete continuous beam plate. The utility model in the core stress zone in the embankment with bored piles and reinforced concrete continuous beam and thin plate in the bored pile top, solved due to some deep soft soil section affected by external factors to set the bridge, resulting in foundation treatment of conventional methods can not satisfy the settlement of ballastless track the control requirements and to ensure the stability of Subgrade under train load long-term problems. It is suitable for the treatment of deep soft soil foundation of high speed railway.
【技术实现步骤摘要】
【技术保护点】
1.一种用于处理铁路低矮路堤深厚软土地基的桩基,包括:位于路堤核心受力区外的复合地基,所述路堤核心受力区为无砟轨道支撑层两侧45°扩散角范围内下面区域,所述复合地基顶面设有碎石垫层,该碎石垫层中间还设有土工格栅,其特征在于,位于路堤核心受力区内设有钻孔灌注桩,该钻孔灌注桩桩顶上设有钢筋混凝土连续薄板梁。
【技术特征摘要】
【专利技术属性】
技术研发人员:顾湘生,蒋兴锟,赵新益,孙红林,熊林敦,陈尚勇,郭坚鸽,彭志鹏,黄三强,刘好正,李丹,沈伟升,余雷,吴成杰,朱先锋,
申请(专利权)人:中铁第四勘察设计院集团有限公司,
类型:实用新型
国别省市:83
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。