The invention discloses a method for excavation of prefabricated retaining wall and pile hole. The excavation method is to first use machinery to conduct hole leading construction in the excavation area of rectangular hole. After the internal opening, the side and corner soil within the scope of rectangular hole has been disturbed, the internal stress has been released, and the subsequent excavation difficulty has been greatly reduced. With the increasing gravity of prefabricated retaining wall, the settlement of prefabricated retaining wall is too high This method can effectively excavate rectangular holes, improve construction safety, reduce construction difficulty, meet the hole forming requirements of large-size rectangular holes, effectively install prefabricated retaining wall structure, avoid the risk of hole collapse, simultaneously complete the excavation and retaining wall simultaneously, shorten the construction period, save energy and environmental protection, and effectively avoid the quality of retaining wall The hidden danger is especially suitable for the construction of anti slide piles in high cold and high altitude areas such as Sichuan Tibet railway.
【技术实现步骤摘要】
一种预制护壁及桩孔开挖方法
本专利技术涉及护壁施工
,特别涉及一种预制护壁及桩孔开挖方法。
技术介绍
随着社会经济的发展,工程中大直径桩和超大直径桩频繁出现,传统施工工艺面临极大挑战。桩基截面一般分圆形桩和矩形桩,目前圆形桩多采用机械成孔配合泥浆护壁施工,实现了全机械化施工,如采用旋挖钻及冲击钻,但其直径通常只能达到2.5m,而矩形桩(如抗滑桩)截面尺寸较大,通常为3m*4m甚至更大,现有技术中多依靠人工作业成孔,并采用现浇混凝土护壁进行支护防止塌孔,人工挖孔风险极高且护壁需要立模现浇,工期较长,极大影响降低了工程效率。
技术实现思路
本专利技术的目的在于克服现有技术中矩形孔截面尺寸较大,无法通过机械成孔,而采用人工挖孔风险高、效率低、工期长、成型质量差等上述不足,提供一种预制护壁及桩孔开挖方法。为了实现上述目的,本专利技术提供了以下技术方案:一种桩孔开挖方法,包含如下步骤:a、施工放样,定桩孔位;b、采用机械进行引孔至设计标高深度处,并清运引孔土方;c、下沉预制护壁,先将第一节的预制护壁节段定位,然后将第一节的所述预制护壁节段的上口压至高出自然地面10cm-50cm处,再开挖所述预制护壁内的土方并清运;d、将下一节的所述预制护壁节段连接于前一节的所述预制护壁节段顶端后,将所述的下一节预制护壁节段的上口压至高出自然地面10cm-50cm处,再开挖所述预制护壁内的土方并清运;e、重复步骤d,直至将最后一节的所述预制护壁节段连接于倒数第二节的所述预制护壁节段顶端后,将最后一节的所述预制护壁节段的上口压至自然地面处,然后开挖所述预制护壁内的土方并清运,完成桩孔 ...
【技术保护点】
1.一种桩孔开挖方法,其特征在于,包含如下步骤:a、施工放样,定桩孔位;b、采用机械进行引孔至设计标高深度处,并清运引孔土方;c、下沉预制护壁,先将第一节的预制护壁节段(1)定位,然后将第一节的所述预制护壁节段(1)的上口压至高出自然地面10cm‑50cm处,再开挖所述预制护壁内的土方并清运;d、将下一节的所述预制护壁节段(1)连接于前一节的所述预制护壁节段(1)顶端后,将所述的下一节预制护壁节段(1)的上口压至高出自然地面10cm‑50cm处,再开挖所述预制护壁内的土方并清运;e、重复步骤d,直至将最后一节的所述预制护壁节段(1)连接于倒数第二节的所述预制护壁节段(1)顶端后,将最后一节的所述预制护壁节段(1)的上口压至自然地面处,然后开挖所述预制护壁内的土方并清运,完成桩孔的开挖;其中,所述预制护壁包含若干个所述预制护壁节段(1),所述预制护壁的截面为矩形,步骤b中引孔的截面尺寸小于所述预制护壁的截面尺寸。
【技术特征摘要】
1.一种桩孔开挖方法,其特征在于,包含如下步骤:a、施工放样,定桩孔位;b、采用机械进行引孔至设计标高深度处,并清运引孔土方;c、下沉预制护壁,先将第一节的预制护壁节段(1)定位,然后将第一节的所述预制护壁节段(1)的上口压至高出自然地面10cm-50cm处,再开挖所述预制护壁内的土方并清运;d、将下一节的所述预制护壁节段(1)连接于前一节的所述预制护壁节段(1)顶端后,将所述的下一节预制护壁节段(1)的上口压至高出自然地面10cm-50cm处,再开挖所述预制护壁内的土方并清运;e、重复步骤d,直至将最后一节的所述预制护壁节段(1)连接于倒数第二节的所述预制护壁节段(1)顶端后,将最后一节的所述预制护壁节段(1)的上口压至自然地面处,然后开挖所述预制护壁内的土方并清运,完成桩孔的开挖;其中,所述预制护壁包含若干个所述预制护壁节段(1),所述预制护壁的截面为矩形,步骤b中引孔的截面尺寸小于所述预制护壁的截面尺寸。2.根据权利要求1所述的开挖方法,其特征在于,在所述步骤b中,成孔中心位于所述预制护壁的中心,在引孔时采用泥浆护壁。3.根据权利要求1所述的开挖方法,其特征在于,在所述步骤c中,采用静压法对所述预制护壁节段(1)进行沉降。4.根据权利要求1-3任一所述的开挖方法,其特征在于,所述预制护壁节段(1)的长度为1m-2m...
【专利技术属性】
技术研发人员:杨泉,徐骏,高柏松,郭海强,王占盛,李炼,姚裕春,陶奇,庞林,
申请(专利权)人:中铁二院工程集团有限责任公司,
类型:发明
国别省市:四川,51