The invention discloses a construction method of assembled lining for open-cut section of tunnel, which solves the problems of assembly difficulty of existing assembled lining structure for open-cut section of tunnel entrance, weak shear strength at joint and poor stability of overall arch lining. Including the inverted arch face (1), the left lining arc prefabricated block (4) and the right lining arc prefabricated block (5), the left lining arc prefabricated block (4) is connected with the right lining arc prefabricated block (5) to form an arch lining structure at the tunnel entrance. By setting the arc lining base, the arc lining base is embedded in the inverted arch surface, and the top surface of the arc lining base is exposed to the inverted arch surface. Above, buffer springs are arranged between the bottom ends of the two sides of the arc-shaped lining block and the base of the arc-shaped lining. In the U-shaped groove at the overlap, shear-resistant steel bars connected with the steel skeleton of the two arc-shaped lining blocks are reserved, and the two reserved shear-resistant steel bars are welded at the splicing points, thus greatly improving the stability of the integral arch lining.
【技术实现步骤摘要】
隧道明洞段拼装式衬砌施工方法
本专利技术涉及一种隧道洞口明挖段的衬砌结构,特别涉及一种通过预制成型的弧形衬砌板拼装而成的隧道洞口明挖段的装配式衬砌结构及其拼装方法。
技术介绍
在隧道的挖掘施工中,隧道洞口是以明挖方式开挖形成的,洞口进行临时支护加固后,进行隧道洞身部位(即暗洞)的开挖及支护施工,当暗洞洞身段支护结构全部施作完成后,才进行洞口的渐变段、明洞及洞门衬砌的现浇施工及混凝土养护,这种施工工序存在作业周期过长的缺陷;在现有技术中,本领域技术人员也有试图在洞口处采用预制成型的装配式弧形衬砌板拼装洞口衬砌的,即在洞口明挖段开挖完成后,通过预制成型的衬砌,进行隧道洞口的一次性支护,预制的衬砌是由若干个预制成型的弧形衬砌板拼装成拱形洞门的,隧道洞口底面为仰拱面,预制成型的弧形衬砌板的两侧底端是安装在仰拱面之上的,由于仰拱面不平整,会造成拱形衬砌两底端面与仰拱面的衔接不吻合的现象,须对衔接面进行二次找平处理;另外,弧形衬砌板在预制过程中存在误差,在装配过程中不能一次性拼装到位,需要进行调整,但弧形衬砌板与仰拱面是刚性结合的,装配过程中存在调整困难的问题;现有的装配式弧 ...
【技术保护点】
1.一种隧道明洞段拼装式衬砌施工方法,包括以下步骤:第一步、在预制厂完成左预制衬砌底座(2)和右预制衬砌底座(3)的预制,左预制衬砌底座(2)与右预制衬砌底座(3)的结构相同,左预制衬砌底座(2)为长方体形,在左预制衬砌底座(2)的顶面上设置有左装配结合台阶(18);在左装配结合台阶(18)的下台阶上,沿隧道纵向走向方向,等间隔地布设有左底座弹簧嵌入槽(15),在左底座弹簧嵌入槽(15)中嵌入有左装配缓冲弹簧(16);在右预制衬砌底座(3)上设置有右装配结合台阶(22),在右装配结合台阶(22)的下台阶上,沿隧道纵向走向方向,等间隔地布设有右底座弹簧嵌入槽(19),在右底座 ...
【技术特征摘要】
1.一种隧道明洞段拼装式衬砌施工方法,包括以下步骤:第一步、在预制厂完成左预制衬砌底座(2)和右预制衬砌底座(3)的预制,左预制衬砌底座(2)与右预制衬砌底座(3)的结构相同,左预制衬砌底座(2)为长方体形,在左预制衬砌底座(2)的顶面上设置有左装配结合台阶(18);在左装配结合台阶(18)的下台阶上,沿隧道纵向走向方向,等间隔地布设有左底座弹簧嵌入槽(15),在左底座弹簧嵌入槽(15)中嵌入有左装配缓冲弹簧(16);在右预制衬砌底座(3)上设置有右装配结合台阶(22),在右装配结合台阶(22)的下台阶上,沿隧道纵向走向方向,等间隔地布设有右底座弹簧嵌入槽(19),在右底座弹簧嵌入槽(19)中嵌入有右装配缓冲弹簧(20),在左预制衬砌底座(2)的内侧和右预制衬砌底座(3)的内侧均预制有电缆沟槽(23);第二步、在预制厂完成左衬砌弧形预制块(4)和右衬砌弧形预制块(5)的预制,左衬砌弧形预制块(4)与右衬砌弧形预制块(5)拼接后组成隧道洞口拱形衬砌结构;在左衬砌弧形预制块(4)的底端面上,沿隧道纵向走向方向,等间隔地设置有左弧形块底端面弹簧嵌入槽(17),在左衬砌弧形预制块(4)的拱顶结合面上设置有上搭接舌(6);在右衬砌弧形预制块(5)的底端面上,沿隧道纵向走向方向,等间隔地设置有右弧形块底端面弹簧嵌入槽(21),在右衬砌弧形预制块(5)的拱顶结合面上设置有下搭接舌(7);左衬砌弧形预制块(4)上的上搭接舌(6)搭接在右衬砌弧形预制块(5)上的下搭接舌(7)上,组成隧道洞口拱形衬砌;在左衬砌弧形预制块(4)的拱顶结合端面上预埋有左衬砌弧形预制块预埋连接钢筋(8),在右衬砌弧形预制块(5)的拱顶结合端面上预埋与右衬砌弧形预制块预埋连接钢筋(9);第三步、将左预制衬砌底座(2)和右预制衬砌底座(3)分别吊装到隧道洞口的明洞仰拱中...
【专利技术属性】
技术研发人员:赵立财,
申请(专利权)人:中铁十九局集团第三工程有限公司,
类型:发明
国别省市:辽宁,21