The utility model provides an inverted arch trestle bridge, which comprises a main bridge spanning a tunnel section under inverted arch construction. The main bridge is composed of at least two main beams, Bridge Slabs and multiple connecting beams. The main girder is made of H-shaped steel, and is connected and fixed between each two main beams through multiple connecting beams. The Bridge Slabs are arranged above the main beam, and the two ends of the main beam are cut into preset angles, so that the two ends of the main bridge are cut into preset angles. The bridge slab forms the preset gradient; the front approach bridge is set in the tunnel section which has completed lining construction, and the end of the front approach bridge and the main beam overlap each other according to the extension direction of the main beam; the back approach bridge is set in the tunnel section which has not yet been lining construction, and the back approach bridge and the other end of the main beam overlap each other according to the extension direction of the main beam. The inverted arch trestle provided by the utility model can significantly improve the bearing capacity of construction vehicles, ensure the safety of inverted arch construction, and the inverted arch trestle has the advantages of light volume, convenient turnover, less steel consumption and saving construction cost.
【技术实现步骤摘要】
仰拱栈桥
本技术涉及市政工程施工领域,具体地,涉及隧道施工中的一种仰拱栈桥。
技术介绍
仰拱是整个隧道结构的主要组成部分之一,是隧道结构的基础,其质量好坏决定整个隧道结构安全。仰拱需要一次成型,避免分部浇筑。由于在隧道掘进过程中施工车辆来回行驶会对仰拱浇筑施工造成干扰,因此需要在正在进行仰拱浇筑的施工段的上方架设仰拱栈桥来保证仰拱浇筑施工有序进行。仰拱栈桥能够把掘进、初期支护和衬砌施工流水线连成一体,实现掘进、初期支护与二次衬砌等多个施工工序的平行流水作业。现有技术中的仰拱栈桥由两片梁板组成,其中每片梁板由多根工字钢并排焊接而成,仰拱栈桥笨重,不便移动,且工字钢横截面两个主轴的惯性矩相差较大,施工车辆在仰拱栈桥上行走时产生移动集中荷载和偏压荷载,造成仰拱栈桥扭曲变形,影响隧道施工安全。
技术实现思路
针对现有技术中仰拱栈桥笨重,不便移动,承载能力弱,容易扭曲变形的技术问题,本技术提供了一种仰拱栈桥,该仰拱栈桥抗竖向弯曲能力强,体积轻便,可以随时移动,且能够节约钢材,取得良好的经济效益。为实现上述目的,本技术提供的仰拱栈桥包括:用于跨设于正在进行仰拱施工的隧道段的主桥,所述主桥由至少两根主梁、桥板和多根连接梁组成,所述主梁由H型钢制成,每两根主梁之间通过多根连接梁连接固定,所述桥板搭设在所述主梁上方,所述主梁的两端切割成预设角度,使得所述主桥两端的桥板形成预设坡度;设置于已完成衬砌施工的隧道段的前引桥,所述前引桥由前引桥板以及至少两根前引桥梁组成,所述前引桥梁与所述主梁的一端按照主梁的延伸方向相互搭接,所述前引桥板搭设在所述前引桥梁的上方;设置于尚未进行衬砌施工的隧 ...
【技术保护点】
1.一种仰拱栈桥,其特征在于,所述仰拱栈桥包括:用于跨设于正在进行仰拱施工的隧道段的主桥(1),所述主桥(1)由至少两根主梁(11)、桥板(12)和多根连接梁(13)组成,所述主梁(11)由H型钢制成,每两根主梁(11)之间通过多根连接梁(13)连接固定,所述桥板(12)搭设在所述主梁(11)上方,所述主梁(11)的两端切割成预设角度,使得所述主桥(1)两端的桥板(12)形成预设坡度;设置于已完成衬砌施工的隧道段的前引桥(2),所述前引桥(2)由前引桥板(22)以及至少两根前引桥梁(21)组成,所述前引桥梁(21)与所述主梁(11)的一端按照主梁(11)的延伸方向相互搭接,所述前引桥板(22)搭设在所述前引桥梁(21)的上方;设置于尚未进行衬砌施工的隧道段的后引桥(3),所述后引桥(3)由后引桥板(32)以及至少两根后引桥梁(31)组成,所述后引桥梁(31)与所述主梁(11)的另一端按照主梁(11)的延伸方向相互搭接,所述后引桥板(32)搭设在所述后引桥梁(31)的上方。
【技术特征摘要】
1.一种仰拱栈桥,其特征在于,所述仰拱栈桥包括:用于跨设于正在进行仰拱施工的隧道段的主桥(1),所述主桥(1)由至少两根主梁(11)、桥板(12)和多根连接梁(13)组成,所述主梁(11)由H型钢制成,每两根主梁(11)之间通过多根连接梁(13)连接固定,所述桥板(12)搭设在所述主梁(11)上方,所述主梁(11)的两端切割成预设角度,使得所述主桥(1)两端的桥板(12)形成预设坡度;设置于已完成衬砌施工的隧道段的前引桥(2),所述前引桥(2)由前引桥板(22)以及至少两根前引桥梁(21)组成,所述前引桥梁(21)与所述主梁(11)的一端按照主梁(11)的延伸方向相互搭接,所述前引桥板(22)搭设在所述前引桥梁(21)的上方;设置于尚未进行衬砌施工的隧道段的后引桥(3),所述后引桥(3)由后引桥板(32)以及至少两根后引桥梁(31)组...
【专利技术属性】
技术研发人员:闫志刚,张隽,赵香萍,吴佳峰,徐大成,张宁强,韩东岭,常士周,
申请(专利权)人:中铁十二局集团第二工程有限公司,
类型:新型
国别省市:山西,14