The invention provides a support method for soft soil foundation pit without internal support, which includes the following steps: S1, setting vertical body I and vertical body II; S2, setting piers; S3, setting inclined brace components, which are composed of at least two inclined braces arranged in turn along the length direction of the foundation pit; the top of the inclined brace and the top of the vertical body II are connected on the ground, and the bottom of the inclined brace components is connected with the vertical body. The bottom of the stayed member is located below the excavation surface of the foundation pit; S4. The stayed member assembly is composed of one-to-one stayed member corresponding to the stayed member in the middle of the foundation pit; the top of the stayed member is connected with the top of the vertical body I, and the stayed member intersects with the vertical body II at the intersection point A; the intersection point A is located below the excavation surface of the foundation pit; the stayed member and the stayed member intersect with the stayed member at point B; Setting up horizontal component: While excavating the foundation pit with the depth of H from the ground, set n-layer horizontal component from top to bottom at the depth of A4 from the ground.
【技术实现步骤摘要】
无内支撑的软土基坑支护方法
本专利技术涉及土木工程领域中基坑支护方法,具体涉及一种无内支撑的软土基坑支护方法。
技术介绍
在软土中的基坑,当开挖深度大于7m以上,就需要采用内支撑抵挡作用在竖向支护体上的土压力,这是一种被动支撑作用。内支撑系统由立柱桩、立柱及水平向支撑梁系构成,这增加了工程造价,降低了基坑内的出土效率。另外,随着地下结构的施工,内支撑亦需要逐层拆除,给环境带来影响,亦干扰地下结构的施工。
技术实现思路
本专利技术要解决的技术问题是提出一种软土地基上无内支撑的基坑支护方法;为解决上述技术问题,本专利技术提出一种无内支撑的软土基坑支护方法,包括以下步骤:S1、设置竖向体Ⅰ与竖向体Ⅱ:在拟开挖侧设置竖向体Ⅰ,竖向体Ⅰ的长度为L1,在基坑外侧设置竖向体Ⅱ,竖向体Ⅱ的长度为L2;注:上述外侧指软土基坑外侧,即软土基坑位于竖向体Ⅰ与竖向体Ⅱ内侧。竖向体Ⅰ与竖向体Ⅱ相平行。所述竖向体Ⅰ与竖向体Ⅱ顶端均与地面平齐,且L2小于等于L1S2、设置支墩;所述支墩位于竖向体Ⅰ一侧(竖向体Ⅰ1另一侧为斜撑件、斜拉件、水平件),其顶部与基坑开挖面平(即与基坑坑底平);所述支墩沿基坑长度方向连续设置。S3、设置斜撑件组件:所述斜撑件组件由至少两个沿基坑长度方向依次设置的斜撑件构成;所述斜撑件的顶端与竖向体Ⅱ的顶端在地面相接,斜撑件的底端与竖向体Ⅰ相接,且斜撑件的底端位于基坑开挖面的下方;S4、设置斜拉件组件:所述斜拉件组件由与步骤S3中斜撑件一一对应的斜拉件构成;所述斜拉件的顶端与竖向体Ⅰ的顶端相接,斜拉件与竖向体Ⅱ相交,相交点为A;所述相交点A位于基坑开挖面下方;所述斜拉 ...
【技术保护点】
1.无内支撑的软土基坑支护方法,其特征是包括以下步骤:S1、设置竖向体Ⅰ(1)与竖向体Ⅱ(2):在拟开挖侧设置竖向体Ⅰ(1),竖向体Ⅰ(1)的长度为L1,在基坑外侧设置竖向体Ⅱ(2),竖向体Ⅱ(2)的长度为L2;所述竖向体Ⅰ(1)与竖向体Ⅱ(2)顶端均与地面(9)平齐,且L2小于等于L1S2、设置支墩(5);所述支墩(5)位于竖向体Ⅰ(1)一侧,其顶部与基坑开挖面(8)平;所述支墩(5)沿基坑长度方向连续设置;S3、设置斜撑件组件:所述斜撑件组件由至少两个沿基坑长度方向依次设置的斜撑件(3)构成;所述斜撑件(3)的顶端与竖向体Ⅱ(2)的顶端在地面(9)相接,斜撑件(3)的底端与竖向体Ⅰ(1)相接,且斜撑件(3)的底端位于基坑开挖面(8)的下方;S4、设置斜拉件组件:所述斜拉件组件由与步骤S3中斜撑件(3)一一对应的斜拉件(4)构成;所述斜拉件(4)的顶端与竖向体Ⅰ(1)的顶端相接,斜拉件(4)与竖向体Ⅱ(2)相交,相交点为A;所述相交点A位于基坑开挖面(8)下方;所述斜拉件(4)伸出相交点A的长度为a3;所述斜撑件(3)与斜拉件(4)相交于B点;S5、设置n层水平件组件:从地面(9)向 ...
【技术特征摘要】
1.无内支撑的软土基坑支护方法,其特征是包括以下步骤:S1、设置竖向体Ⅰ(1)与竖向体Ⅱ(2):在拟开挖侧设置竖向体Ⅰ(1),竖向体Ⅰ(1)的长度为L1,在基坑外侧设置竖向体Ⅱ(2),竖向体Ⅱ(2)的长度为L2;所述竖向体Ⅰ(1)与竖向体Ⅱ(2)顶端均与地面(9)平齐,且L2小于等于L1S2、设置支墩(5);所述支墩(5)位于竖向体Ⅰ(1)一侧,其顶部与基坑开挖面(8)平;所述支墩(5)沿基坑长度方向连续设置;S3、设置斜撑件组件:所述斜撑件组件由至少两个沿基坑长度方向依次设置的斜撑件(3)构成;所述斜撑件(3)的顶端与竖向体Ⅱ(2)的顶端在地面(9)相接,斜撑件(3)的底端与竖向体Ⅰ(1)相接,且斜撑件(3)的底端位于基坑开挖面(8)的下方;S4、设置斜拉件组件:所述斜拉件组件由与步骤S3中斜撑件(3)一一对应的斜拉件(4)构成;所述斜拉件(4)的顶端与竖向体Ⅰ(1)的顶端相接,斜拉件(4)与竖向体Ⅱ(2)相交,相交点为A;所述相交点A位于基坑开挖面(8)下方;所述斜拉件(4)伸出相交点A的长度为a3;所述斜撑件(3)与斜拉件(4)相交于B点;S5、设置n层水平件组件:从地面(9)向下开挖深度为H的基坑,在开挖的同时,从距离地面(9)a4深度处,从上至下依次设置n层水平件组件;第n层水平件组件位于基坑开挖面(8)上方,与基坑开挖面(8)的距离为a5。2.根据权利要求1所述的无内支撑的软土基坑支护方法,其特征是:所述步骤S5设置水平件组件的具体步骤如下:5.1、设置第一层水平件组件:于地面(9)向下开挖第一层土,开挖深度为a4+0.5m;在a4深度处,设置第一层水平件组件;5.2、设置第k层水平件组件,n≥k≥2:于第k-1层的开挖深度再向下开挖第k层土,开挖深度为s2;在a4+(k-1)s2深度处,设置第k层水平件组件;重复上述步骤,直至k=n;5.3、于第n层的开挖深度再向下开挖a5-0.5m深度,基坑开挖完毕。3.根据权利要求1或2所述的无内支撑的软土基坑支护方法,其特征是:每层水...