The invention provides a tower-beam thrust connection device and a fast construction method of self-anchored suspension bridge. A beam end blocker is fixed on the reserved steel plate at the beam end of the tower-beam thrust connection device, and a tower end blocker is fixed on the tower end bearing steel plate. The beam end blocker is connected with the tower end blocker through a thrust conductor. Steps: Step 1, synchronous construction of side-span main girder and bridge tower; Step 2, installation of tower-beam thrust connection device for temporary connection between side-span main girder and bridge tower; Step 3, main cable erection and Main Girder Installation synchronous construction; Step 4, disassembly of tower-beam thrust connection device to complete the first system conversion; Step 5, tension of suspender, removal of support, complete the second system conversion. The method of the invention adopts a tower-beam thrust connection device, which can safely and economically realize the coordinated installation of the main cable and the main beam, thereby greatly saving on-site operation time, and is characterized by adding a system conversion of the main beam compared with the traditional process.
【技术实现步骤摘要】
塔梁止推连接装置及自锚式悬索桥快速建造施工方法
本专利技术属于道路桥梁领域,涉及自锚式悬索桥,具体涉及一种塔梁止推连接装置及自锚式悬索桥快速建造施工方法。
技术介绍
自锚式悬索桥不同于一般的地锚式悬索桥,不需要巨大的锚碇,主缆锚固于边跨主梁端部,由主梁承担主缆的水平分力和竖向分力,解决了地质条件不允许修建锚碇而建造悬索桥的问题,并且保留了传统悬索桥的优美外形。自锚式悬索桥由于主缆直接锚固在主梁上,施工过程中主缆将产生巨大的水平分力,所以在施工方法上一般采用先搭设临时支撑完成主梁施工,然后架设主缆的施工方案,即“先梁后缆”施工工艺。然而这种“先梁后缆”工艺会明显导致工期延长。由于主缆的架设需要等到主梁全部安装完成后才能开始,故不同工种(即缆索架设与主梁安装)无法同步展开,明显导致现场施工工期延长,现场安全风险增加。现有技术中虽然公开了一种塔梁临时锚固装置,第一格栅架的一个端面和第二格栅架的一个端面相对设置,形成传力撑的作用面;第一格栅架和第二格栅架相对设置的两个端面之间通过传力撑支撑传力,在施工过程中将边跨主梁上承受的水平力传递给桥塔;由内筒和外筒组成的可伸缩套筒内安装有千斤顶,千斤顶的一端固结在外筒远离内筒的端部设置的钢架上,千斤顶的油管通过设置在外筒侧壁上的油管进出口进入外筒内部。但是现有的塔梁临时锚固装置存在以下问题:(A)液压传动对油温变化极其敏感,由于施工现场的环境与进度变动很大,实际应用中发现现有技术很容易出现油液泄露,且油液也难以始终保持清洁,严重影响传力过程的稳定性;(B)面对临时塔锚式自锚式悬索桥快速施工,液压传动在能量转化的过程中承受巨大 ...
【技术保护点】
1.一种塔梁止推连接装置,包括梁端预留钢板(1)和塔端承压钢板(2),其特征在于,所述的梁端预留钢板(1)和塔端承压钢板(2)相互垂直布设,所述的梁端预留钢板(1)上固定安装有梁端阻推器(3),所述的塔端承压钢板(2)上固定安装有塔端阻推器(4),所述的梁端阻推器(3)与塔端阻推器(4)之间设置有推力传导器(5);所述的推力传导器(5)包括外筒(501)和内筒(502),所述的外筒(501)的一端开放,所述的内筒(502)的两端封闭,外筒(501)的封闭端安装在塔端阻推器(4)上,内筒(502)的一端安装在梁端阻推器(3)上,内筒(502)的另一端插入外筒(501)的开放端使得外筒(501)内形成砂腔(503),砂腔(503)内填充有砂粒(504);内筒(502)的另一端与外筒(501)的内壁之间设置有橡胶密封层(505);所述的外筒(501)上设置有与砂腔(503)连通的进砂阀(506)和排砂阀(507)。
【技术特征摘要】
1.一种塔梁止推连接装置,包括梁端预留钢板(1)和塔端承压钢板(2),其特征在于,所述的梁端预留钢板(1)和塔端承压钢板(2)相互垂直布设,所述的梁端预留钢板(1)上固定安装有梁端阻推器(3),所述的塔端承压钢板(2)上固定安装有塔端阻推器(4),所述的梁端阻推器(3)与塔端阻推器(4)之间设置有推力传导器(5);所述的推力传导器(5)包括外筒(501)和内筒(502),所述的外筒(501)的一端开放,所述的内筒(502)的两端封闭,外筒(501)的封闭端安装在塔端阻推器(4)上,内筒(502)的一端安装在梁端阻推器(3)上,内筒(502)的另一端插入外筒(501)的开放端使得外筒(501)内形成砂腔(503),砂腔(503)内填充有砂粒(504);内筒(502)的另一端与外筒(501)的内壁之间设置有橡胶密封层(505);所述的外筒(501)上设置有与砂腔(503)连通的进砂阀(506)和排砂阀(507)。2.如权利要求1所述的塔梁止推连接装置,其特征在于,所述的外筒(501)的封闭端通过第一端承板(508)安装在塔端阻推器(4)上,所述的内筒(502)的一端通过第二端承板(509)顶在梁端阻推器(3)上;所述的第一端承板(508)上设置有预留连接孔(510)。3.如权利要求1所述的塔梁止推连接装置,其特征在于,所述的外筒(501)外壁上靠近开放端的位置设置有环向加强板(511)。4.一种自锚式悬索桥快速建造施工方法,其特征在于,该方法采用如权利要求1至3任一权利要求所述的塔梁止推连接装置,该方法包括以下步骤:步骤一,同步施工边跨主梁(6)与桥塔(7);步骤二,安装塔梁止推连接装置对边跨主梁(6)与桥塔(7)进行临时连接;步骤三,主缆(8)架设与中跨主梁(9)安装同步施工;步骤四,拆卸塔梁止推连接装置,完成第一次体系转换;步骤五,张拉吊杆(10),拆除支架(11),完成第二次体系转换。5.如权利要求4所述的自锚式悬索桥快速建造施工方法,其特征在于,所述的自锚式悬索桥的桥塔(7)的塔柱内侧与边跨主梁(6)腹板外侧的水平间隙小于70cm。6.如权利要求4所述的自锚式悬索桥快速建造施工方法,其特征在于,步骤一的具体过程为:步骤1.1,对桥塔(7)和桥墩(12)的基础进行地基处理,施工桥塔(7)基础、桥墩(12)基础、桥塔(7)及桥墩(12);步骤1.2,搭设锚跨预应力混凝土主梁以及边中跨主梁安装所需的支架(11),在支架(11)上现浇锚跨混凝土梁段,张拉预应力钢束,完成锚跨主梁施工;步骤1.3,在支架(11)上逐段...
【专利技术属性】
技术研发人员:王晓明,邓耀,白云腾,贺耀北,王欢,茅相源,金蝶,汤圣鹏,舒鹏,
申请(专利权)人:长安大学,
类型:发明
国别省市:陕西,61