The invention discloses an integral abutment construction method for a bridge without expansion joints, which includes construction of abutment support section at the upper end of the abutment, fixed connection of the abutment to the upper end of the pile foundation, placing a template and temporary support system of the abutment back-pouring section on the abutment support section, and temporary support system located in the template of the abutment back-pouring section, and behind the abutment. The transition section of abutment is constructed on the sand filling in the template of the back-pouring section of abutment. The upper end of the transition section of abutment and the main beam are integrally poured and consolidated. After the tension of longitudinal prestressing steel bundles in the main beam is completed, the sand filling in the template of the back-pouring section of abutment is washed out and concrete is poured into the template of the back-pouring section of abutment to form the back-pouring section of abutment. And maintenance, abutment transition section, abutment back-pouring section and abutment support section are connected from top to bottom in turn to form an integral abutment of bridge without expansion joint. An integral abutment of a bridge without expansion joints is also disclosed. The construction method of the integral abutment of the bridge without expansion joints and the integral abutment improve the prestressing penetration.
【技术实现步骤摘要】
无伸缩缝桥梁的整体式桥台施工方法及整体式桥台
本专利技术涉及桥梁
,特别是涉及一种无伸缩缝桥梁的整体式桥台施工方法及无伸缩缝桥梁的整体式桥台。
技术介绍
目前我国常用的梁桥均为有伸缩缝和支座的桥梁。然而,伸缩缝和支座等易损构件给桥梁后期养护和维修带来很大的麻烦;因此,目前对于总长较小的中、小桥,设计者逐渐热衷于采用整体式无缝梁桥,即采用桥墩、桥台与主梁固结的形式,取消了桥梁的支座和伸缩缝,通过墩、台及台后回填土来吸收主梁因温度作用下的纵向形变。对于跨度较小(一般小于20m)的梁桥,一般采用普通钢筋混凝土整体无缝梁桥,但对于跨度较大的桥梁,为了满足正常实用要求,一般都会给主梁施加一定的纵向预应力。若采用整体浇筑完再施加预应力,由于整体式无缝梁桥超静定的影响,尤其是端墙刚度较大,使得主梁纵向预应力无法有效的施加到主梁中去,预应力导入度效率极低,有的甚至在张拉过程中出现端墙开裂的可能。因此如何高效的将预应力导入到主梁中去,是一个设计者值得研究的课题。
技术实现思路
本专利技术的目的是提供一种无伸缩缝桥梁的整体式桥台施工方法及无伸缩缝桥梁的整体式桥台,以解决上述现有技术存在的问题,提高预应力的导入度,解决后张法预应力整体式无伸缩缝梁桥桥台的施工难题。为实现上述目的,本专利技术提供了如下方案:本专利技术提供一种无伸缩缝桥梁的整体式桥台施工方法,包括以下步骤:步骤一:施工桩基和承台后,在所述承台上端施工桥台支承段,所述承台固定连接于所述桩基上端;步骤二:在所述桥台支承段上放置桥台后浇段模板和临时支撑系统,且所述临时支撑系统位于所述桥台后浇段模板内,并在桥台后浇段模板 ...
【技术保护点】
1.一种无伸缩缝桥梁的整体式桥台施工方法,其特征在于:包括以下步骤:步骤一:施工桩基和承台后,在所述承台上端施工桥台支承段,所述承台固定连接于所述桩基上端;步骤二:在所述桥台支承段上放置桥台后浇段模板和临时支撑系统,且所述临时支撑系统位于所述桥台后浇段模板内,并在桥台后浇段模板内填砂;步骤三:施工桥台过渡段,所述桥台过渡段位于所述桥台后浇段模板内的填砂上,所述桥台过渡段上端与所述主梁为整体浇筑固结,所述主梁内的纵向预应力钢束张拉完成后,冲掉所述桥台后浇段模板内的填砂,向所述桥台后浇段模板内浇筑混凝土形成桥台后浇段并养护,所述桥台过渡段、所述桥台后浇段和所述桥台支承段由上至下依次连接并形成所述无伸缩缝桥梁的整体式桥台。
【技术特征摘要】
2018.04.10 CN 201810313523X1.一种无伸缩缝桥梁的整体式桥台施工方法,其特征在于:包括以下步骤:步骤一:施工桩基和承台后,在所述承台上端施工桥台支承段,所述承台固定连接于所述桩基上端;步骤二:在所述桥台支承段上放置桥台后浇段模板和临时支撑系统,且所述临时支撑系统位于所述桥台后浇段模板内,并在桥台后浇段模板内填砂;步骤三:施工桥台过渡段,所述桥台过渡段位于所述桥台后浇段模板内的填砂上,所述桥台过渡段上端与所述主梁为整体浇筑固结,所述主梁内的纵向预应力钢束张拉完成后,冲掉所述桥台后浇段模板内的填砂,向所述桥台后浇段模板内浇筑混凝土形成桥台后浇段并养护,所述桥台过渡段、所述桥台后浇段和所述桥台支承段由上至下依次连接并形成所述无伸缩缝桥梁的整体式桥台。2.根据权利要求1所述的无伸缩缝桥梁的整体式桥台施工方法,其特征在于:所述承台和所述桥台支承段同时浇筑,所述桥台支承段的高度与所述无伸缩缝桥梁的整体式桥台的高度的比例为[1/3,1/2]。3.根据权利要求1所述的无伸缩缝桥梁的整体式桥台施工方法,其特征在于:所述承台浇筑混凝土之前,在所述承台的浇筑模板内预埋桥台受力主筋,所述桥台受力主筋自所述承台内沿所述无伸缩缝桥梁的整体式桥台高度通长设置不截断,所述桥台受力主筋上端与所述主梁的浇筑模板内预埋的主梁钢筋焊接。4.根据权利要求1所述的无伸缩缝桥梁的整体式桥台施工方法,其特征在于:所述桥台支承段的顶面凿毛后放置所述桥台后浇段模板和所述临时支撑系统。5.根据权利要求1所述的无伸缩缝桥梁的整体式桥台施工方法,其特征在于:所述桥台后浇段模板内填砂后,在填砂内预埋连接键,所述连接键自所述填...
【专利技术属性】
技术研发人员:王先前,林松,董桔灿,代亮,吴庆雄,夏少华,王远洋,涂俊,薛俊青,王梦雨,翁观旺,王小花,
申请(专利权)人:深圳市市政设计研究院有限公司,
类型:发明
国别省市:广东,44