The utility model discloses a top circle structure shared by the foundation pit in stages, and an anti shear structural block is provided to the late excavation side on the later excavation side of the top circle, and the height of the shear block is half of the height of the top circle, and the width of the shear block is 150. With the increase of a small amount of engineering, the utility model does not need to set up the high cost temporary components such as the reserved feeder or steel bar in the whole section, and the support scheme of the later construction foundation pit is stable. The method is safe and reliable, and the subsequent construction of the construction is not abandoned, so that the supporting scheme of the later construction foundation pit is flexible and comprehensive, and the construction period is intensive.
【技术实现步骤摘要】
分期实施基坑全周期共用的顶圈梁构造
本技术涉及基坑工程
,尤其涉及一种分期实施基坑全周期共用的顶圈梁构造。
技术介绍
近年来,随着城市建设规模的不断扩大,地下空间的开发力度不断增大,基坑逐步向超深、超大规模等方向发展。超大基坑根据建筑功能或邻近环境保护等原因经常采用分区开挖,同时也存在相邻基坑同时或时序搭接开挖的可能。则相邻基坑间的分隔墙(地下墙或排桩等)应运而生,其上端顶圈梁(第一道钢筋砼围檩)因受力方向与支撑方案等原因,往往存在预留不准或重复施工的情况,对于施工效率及工程造价造成一定影响。目前分隔墙顶圈梁常规做法有三种:1)后期施工基坑时凿除既有顶圈梁,根据支护方案重新施做顶圈梁;优点:不受后期支护方案制约,可靠性高;缺点:废弃工程量大,工期略长。2)分阶段实施的基坑顶圈梁统筹考虑,事先做好预留;优点:工程量工期集约,可靠性高;缺点:灵活性低,支护方案不能调整。3)先期不预留,后期不凿除,采用植筋连接。优点:工程量工期集约,后期支护方案灵活性高。缺点:可靠性较差。以上三种措施均不能同时满足集约工程量、后期施工基坑支护方案可灵活调整、后期施工安全可靠的要求。本
的技术人员致力于解决上述技术缺陷。
技术实现思路
有鉴于现有技术的上述缺陷,本技术的技术目的在于提供一种能同时满足集约工程量、后期施工基坑支护方案可灵活调整、后期施工安全可靠要求的顶圈梁结构。为实现上述技术目的,本技术提供了一种分期实施基坑全周期共用的顶圈梁构造,在顶圈梁的后期开挖侧设有向所述后期开挖侧突出的抗剪构造块,所述抗剪构造块的高度为所述顶圈梁高度的一半,所述抗剪构造块的宽度为150- ...
【技术保护点】
1.一种分期实施基坑全周期共用的顶圈梁构造,其特征在于,在顶圈梁的后期开挖侧设有向所述后期开挖侧突出的抗剪构造块,所述抗剪构造块的高度为所述顶圈梁高度的一半,所述抗剪构造块的宽度为150‑400mm。
【技术特征摘要】
1.一种分期实施基坑全周期共用的顶圈梁构造,其特征在于,在顶圈梁的后期开挖侧设有向所述后期开挖侧突出的抗剪构造块,所述抗剪构造块的高度为所述顶圈梁高度的一半,所述抗剪构造块的宽度为150-400mm。2.根据权利要求1所述的...
【专利技术属性】
技术研发人员:张中杰,俞震中,彭基敏,陈加核,吕培林,
申请(专利权)人:上海市城市建设设计研究总院集团有限公司,
类型:新型
国别省市:上海,31