The utility model relates to a prefabricated shear wall building system, composed of steel column and beam, floor and roof panels and precast prefabricated shear wall, shear wall with concealed beam is divided into the wall and no vertical wall, opposite precast shear wall is provided with a pre buried connection plate, precast shear wall and steel column the connection surface is provided with a steel plate, the connecting plate of prefabricated shear wall and steel beam column connection; at the prefabricated shear wall is arranged on the ear plate perpendicular to the plate, connecting steel column and Beam Precast shear wall where there is an ear plate perpendicular to the plate, the fixed connecting ear plate steel column. The ear plate and the prefabricated shear wall through the connection plate; in the steel beam slab and steel beam connection, wall and floor is fixedly connected through embedded prefabricated shear connection plate. The assembly shear wall system housing provided by the utility model can be applied to multi-storey, high-rise or super high-rise fabricated buildings, and has the advantages of fast construction speed and strong load bearing capacity.
【技术实现步骤摘要】
一种装配式剪力墙体系房屋
本技术涉及一种装配式房屋建筑,具体是一种装配式剪力墙体系房屋。
技术介绍
传统建筑中的剪力墙结构是用钢筋混凝土墙板来代替框架结构中的梁柱,能承担各类荷载引起的内力,并能有效控制结构的水平力,这种用钢筋混凝土墙板来承受竖向和水平力的结构称为剪力墙结构,这种结构在高层或超高层房屋中被大量运用。传统的剪力墙体系房屋,需要现场浇筑混凝土,施工周期长,进度缓慢,难以满足现代化快节奏的生活需求。而装配式剪力墙体系建筑通过预制板的结构设计,以及各连接节点的设计,不仅能满足房屋的荷载要求,还可大幅度提高施工进度。
技术实现思路
本技术的目的是提供一种装配式剪力墙体系房屋,适用于多层、高层或超高层建筑领域,具有施工周期短、承担荷载能力强的优势。为了实现上述目的,本技术所采用的技术方案为:一种装配式剪力墙体系房屋,包括钢柱、钢梁、楼板、预制剪力墙板、屋面板和预制含有暗梁的剪力墙板,预制剪力墙板的侧端面及预制含有暗梁的剪力墙板的侧端面均设有钢板,预制含有暗梁的剪力墙板上的暗梁处所在的侧端面上还设有垂直于钢板的耳板,预制剪力墙板的正反面以及预制含有暗梁的剪力墙板的正反面 ...
【技术保护点】
一种装配式剪力墙体系房屋,其特征在于:包括钢柱、钢梁、楼板、预制剪力墙板、屋面板和预制含有暗梁的剪力墙板,预制剪力墙板的侧端面及预制含有暗梁的剪力墙板的侧端面均设有钢板,预制含有暗梁的剪力墙板上的暗梁处所在的侧端面上还设有垂直于钢板的耳板,预制剪力墙板的正反面以及预制含有暗梁的剪力墙板的正反面位于暗梁处均设有预埋连接板,钢柱的侧面设有钢板,钢柱侧面与暗梁相对应的位置还设有垂直于钢板的耳板;预制剪力墙板的侧面与钢柱的侧面通过外加连接钢板将两者的钢板固定连接,楼板放置在预制剪力墙板正反面的预埋连接板上并与预制剪力墙板固定连接;钢柱与钢梁连接,放置在钢梁上的楼板与钢梁固定连接;预 ...
【技术特征摘要】
1.一种装配式剪力墙体系房屋,其特征在于:包括钢柱、钢梁、楼板、预制剪力墙板、屋面板和预制含有暗梁的剪力墙板,预制剪力墙板的侧端面及预制含有暗梁的剪力墙板的侧端面均设有钢板,预制含有暗梁的剪力墙板上的暗梁处所在的侧端面上还设有垂直于钢板的耳板,预制剪力墙板的正反面以及预制含有暗梁的剪力墙板的正反面位于暗梁处均设有预埋连接板,钢柱的侧面设有钢板,钢柱侧面与暗梁相对应的位置还设有垂直于钢板的耳板;预制剪力墙板的侧面与钢柱的侧面通过外加连接钢板将两者的钢板固定连接,楼板放置在预制剪力墙板正反面的预埋连接板上并与预制剪力墙板固定连接;钢柱与钢梁连接,放置在钢梁上的楼板与钢梁固定连接;预制含有暗梁的剪力墙板的侧面与钢柱的侧面通过外加连接钢板将两者的钢板固定连接,再用外加连接钢板将两者的耳板固定连接,楼板放置在预制含有暗梁的剪力墙板上暗梁处的预埋连接板上,并与预制含有暗梁的剪力墙板上的暗梁固定连接。2.根据权利要求1所述的一种装配式剪力墙体系房屋,其特征在于:所述钢柱的侧面位于与钢梁的连接处还设有加劲板。3.根据权利要求1所述的一种装配式剪力墙体系房屋,其特征在于:所述钢柱侧面上的钢板、预制剪力墙板侧面上的钢板以及预制含有暗梁的剪力墙板侧面上的钢板均为单列钢板或者均为双列钢板,当均为双列钢板时,在双列钢板上开设若干通孔,并在双列钢板的相对面上的通孔处焊接有螺母。4.根据权利要求1所述的一种装配式剪力墙体系房屋,其特征在于:所述楼板为预制楼板,预制楼板的侧端面设有钢筋和单列钢板,预制剪力墙板的正反面以及预制含有暗梁的剪力墙板的正反面暗梁所在处均开设有贯通的通孔,楼板侧端面的钢板与预制剪力墙板上的预埋连接板或者与预制含有暗梁的剪力墙板上的预埋连接板固定连接,连接插筋穿过贯通的通孔后与楼板侧端面的钢筋捆扎或焊接固定,最后在楼板与预制剪力墙板的连接处或者是楼板与预制含有暗梁的剪力墙板的连接处浇筑混凝土;楼板与钢梁的连接是用外加连接钢板将两块楼板上的钢板固定,钢梁顶部设有栓钉,用连接插筋将两块楼...
【专利技术属性】
技术研发人员:华玉武,
申请(专利权)人:浙江越宫钢结构有限公司,
类型:新型
国别省市:浙江,33
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。