拉线塔吊装工装制造技术

技术编号:17105931 阅读:41 留言:0更新日期:2018-01-24 21:30
本实用新型专利技术公开了一种拉线塔吊装工装,包括吊装主杆、悬臂梁组件和至少两组抱箍组件,所述悬臂梁组件包括固定杆和悬臂梁支臂,所述悬臂梁组件通过所述固定杆固定于所述吊装主杆的上端,所述抱箍组件套设于所述吊装主杆上。采用上述技术方案后,将原有需要搭设脚手架去安装拉线塔的时间从2周缩短为3‑4天,大大增加了建设效率,减少了建设成本。

Hoisting assembly of wire tower

The utility model discloses a guyed tower hoisting tooling, including hoisting main pole, cantilever beam component and at least two sets of hoop components, the cantilever assembly comprises a fixing rod and a cantilever arm, the cantilever beam components through the upper end of the fixing rod is fixed on the lifting of the main rod by the hoop assembly is sheathed on the lifting of the main rod. By adopting the technical scheme, the original need scaffolding to install the guyed tower from the 2 week time shortened to 3 4 days, greatly increases the construction efficiency, reduce the cost of construction.

【技术实现步骤摘要】
拉线塔吊装工装
本技术涉及一种拉线塔吊装工装。
技术介绍
在传统的送电线路工程中,对于架空输电线路的铁塔施工,当塔的高度超出一般起吊机具的提升高度以后,整体安装存在困难,这时多采用分散构件就地组装的方式。这种方法逐层安装铁架,需要较长时间的野外作业,高空作业的工作量大且施工工期长,影响整个工程进度。对于场地和设备匮乏的地区,采用搭设脚手架来安装拉线塔的方法将十分困难。
技术实现思路
本技术要解决的问题是提供一种结构简单,安装方式便利的拉线塔吊装工装。为了解决上述技术问题,本技术采用如下技术方案:拉线塔吊装工装,包括吊装主杆、悬臂梁组件和至少两组抱箍组件,所述悬臂梁组件包括固定杆和悬臂梁支臂,所述悬臂梁组件通过所述固定杆固定于所述吊装主杆的上端,所述抱箍组件套设于所述吊装主杆上。所述吊装主杆和所述悬臂梁组件的固定杆均为空心管,吊装用钢丝绳由所述吊装主杆和所述悬臂梁组件的固定杆的管心穿过,钢丝绳的一头从所述固定杆的上端穿出并经过所述悬臂梁支臂的末端后连接吊装接头。所述钢丝绳的另一头与电机和减速器连接。所述抱箍组件包括套管、端板和U形螺栓,所述套管套设于所述吊装主杆上,所述套管通过连接件与所述端板本文档来自技高网...
拉线塔吊装工装

【技术保护点】
拉线塔吊装工装,其特征在于:包括吊装主杆、悬臂梁组件和至少两组抱箍组件,所述悬臂梁组件包括固定杆和悬臂梁支臂,所述悬臂梁组件通过所述固定杆固定于所述吊装主杆的上端,所述抱箍组件套设于所述吊装主杆上。

【技术特征摘要】
1.拉线塔吊装工装,其特征在于:包括吊装主杆、悬臂梁组件和至少两组抱箍组件,所述悬臂梁组件包括固定杆和悬臂梁支臂,所述悬臂梁组件通过所述固定杆固定于所述吊装主杆的上端,所述抱箍组件套设于所述吊装主杆上。2.根据权利要求1所述的拉线塔吊装工装,其特征在于:所述吊装主杆和所述悬臂梁组件的固定杆均为空心管,吊装用钢丝绳由所述吊装主杆和所述悬臂梁组件的固定杆的管心穿过,钢丝绳的一头从所述固定杆的上端穿出并经过所述悬臂梁支臂的末端后连接吊装接头。3.根据权利要求2所述的拉线塔吊装工装,其特征在于:所述钢丝绳的另一头与电机和减速器连接。4.根据权利要求1所述的拉线塔吊装工装,其特征在于:所述抱箍组...

【专利技术属性】
技术研发人员:王浩支绍文何龙杨昺铖
申请(专利权)人:电联工程技术股份有限公司
类型:新型
国别省市:浙江,33

网友询问留言 已有0条评论