The docking structure of a layer of preform, aims to overcome the upper and lower shear wall, the existing technology of frame column joint in filling grouting, unable to discharge the air in the cavity, resulting in lower surface within the cavity, affect the structure safety defects, provide docking structure of a layer of preform. Including two prefabricated layer docking, combined with upper and lower precast grouting filling surface between the at least one preform is provided with an exhaust channel, to extend the exhaust channel end with preform surface, the other end of the exhaust passage extends to other surface outside the preform. The utility model not only ensures the safety of the structure, but also ensures the quality of the construction.
【技术实现步骤摘要】
本技术涉及建筑工业化领域,尤其涉及一种上下层预制件的对接结构。
技术介绍
在装配式剪力墙及框架柱的安装过程中,上下层剪力墙、框架柱结合面在填充灌浆时,由于空腔内空气无法排出,在不断灌浆的过程中,内部气压也会随之越来越大,最终导致上下层结合面内出现空腔,影响结构安全。
技术实现思路
本技术克服了现有技术中的上下层剪力墙、框架柱结合面在填充灌浆时,由于空腔内空气无法排出,最终导致上下层结合面内出现空腔,影响结构安全的缺点,提供了一种上下层预制件的对接结构。本技术实现专利技术目的采用的技术方案是:一种上下层预制件的对接结构,包括上下层对接的两个预制件,上下层预制件的结合面之间填充有灌浆,至少一个预制件内设有排气通道,排气通道一端延伸到预制件的结合面外,排气通道另一端延伸到预制件的其他表面外。进一步的,所述的排气通道为内置的排气管或排气槽。进一步的,所述的预制件为预制剪力墙,匀布设置有一组排气管,一组排气管一端延伸到预制剪力墙的结合面外。进一步的,所述的预制件为预制框架柱,排气管一端延伸到预制框架柱的结合面中心外。本技术的有益效果是:通过设置排气通道,在灌浆过程中将结合面内的气体排出,可有效消除空腔,保证了结构的安全。下面结合附图与具体实施方式对本技术作进一步的描述。附图说明图1为本技术的结构示意图。图2为图1的A向视图。附图中,1为上层预制件、2为灌浆、3为下层预制件、4为排气管。具体实施方式如附图1、2所示,本实施例的一种上下层预制件的对接结构,包括上下层对接的两个预制件,即上层预制件1和下层预制件3,上下层预制件的结合面之间填充有灌浆。至少一个预制件即上层预制件1 ...
【技术保护点】
一种上下层预制件的对接结构,包括上下层对接的两个预制件,上下层预制件的结合面之间填充有灌浆,其特征在于,至少一个预制件内设有排气通道,排气通道一端延伸到预制件的结合面外,排气通道另一端延伸到预制件的其他表面外。
【技术特征摘要】
1.一种上下层预制件的对接结构,包括上下层对接的两个预制件,上下层预制件的结合面之间填充有灌浆,其特征在于,至少一个预制件内设有排气通道,排气通道一端延伸到预制件的结合面外,排气通道另一端延伸到预制件的其他表面外。2.根据权利要求1所述的一种上下层预制件的对接结构,其特征在于,所述的排气通道为内置的...
【专利技术属性】
技术研发人员:费权,李宏伟,
申请(专利权)人:深圳市鹏城建筑集团有限公司,深圳市鹏建混凝土预制构件有限公司,
类型:新型
国别省市:广东;44