The utility model discloses a protective structure for the post-pouring belt during construction, which comprises a connecting clasp, a fixed rod, a fixed bolt, a connecting pad, a supporting frame, a post-pouring belt beam plate, a formwork block, a supporting column, an early dismantling column head, a wooden formwork, a telescopic rod, a crossbeam support rod, a driving and adjusting mechanism, a power line, and a crossbeam support rod side. The end is connected with the inner side of the connecting clip, the back end of the beam support rod is welded with the front end of the telescopic rod, the back end of the fixed bolt is embedded in the support column, and the front end of the fixed rod is welded with the back end of the support column. The utility model relates to a protective structure during the construction of the post-pouring belt, and the driving force is provided by opening the driving motor in the structure to enable the rear end of the fixed bolt to be embedded in the support column. The tapered connecting rod drives the driving wheel to rotate the power from the belt to the transmission gear, and the connecting meshing strip drives the supporting top block up and down to adjust, which enhances the convenience of the adjusting structure, reduces the loss time of adjusting and improves the working efficiency.
【技术实现步骤摘要】
一种后浇带施工期间保护结构
本技术是一种后浇带施工期间保护结构,属于建筑施工保护
技术介绍
当基础后浇带两侧混凝土浇筑完毕后,后浇带需留至42天后或主体结构封顶之后才能浇筑混凝土,在这期间,后浇带一直敞露,上部结构施工期间的杂物、垃圾、锯末均有可能落入后浇带内,或是下雨、或是上部混凝土养护的水都有可能流入后浇带内。现有技术公开了申请号为:201420320392.5的一种后浇带施工期间保护结构,包括设置在基础后浇带左右两端的防水台,防水台之间放置有若干块前后分布的木模板,相邻木模板的接缝处放置有方木,方木和木模板上穿有设置在防水台内的预埋螺栓,预埋螺栓上拧有位于方木上表面的锁紧螺母,但是该现有技术对于保护装置的高度调节结构较为复杂且费时费力,导致在出现位移偏差时需要耗费大量时间,降低了工作效率。
技术实现思路
针对现有技术存在的不足,本技术目的是提供一种后浇带施工期间保护结构,以解决现有技术对于保护装置的高度调节结构较为复杂且费时费力,导致在出现位移偏差时需要耗费大量时间,降低了工作效率的问题。为了实现上述目的,本技术是通过如下的技术方案来实现:一种后浇带施工期间保护结构,其结构包括连接卡扣、固定杆、固定螺栓、连接垫板、支撑架、后浇带梁板、模板块、支撑柱、早拆柱头、木方模板、伸缩杆、横梁支杆、驱动调节机构、电力线,所述横梁支杆侧端与连接卡扣内侧相连接,所述横梁支杆后端与伸缩杆前端相焊接,所述固定螺栓后端嵌入安装于支撑柱内,所述支撑柱后端去固定杆前端相焊接,所述后浇带梁板下端嵌入安装于模板块内,所述后浇带梁板下端与木方模板上端相贴合,所述支撑柱后端与支撑架 ...
【技术保护点】
1.一种后浇带施工期间保护结构,其特征在于:其结构包括连接卡扣(1)、固定杆(2)、固定螺栓(3)、连接垫板(4)、支撑架(5)、后浇带梁板(6)、模板块(7)、支撑柱(8)、早拆柱头(9)、木方模板(10)、伸缩杆(11)、横梁支杆(12)、驱动调节机构(13)、电力线(14),所述横梁支杆(12)侧端与连接卡扣(1)内侧相连接,所述横梁支杆(12)后端与伸缩杆(11)前端相焊接,所述固定螺栓(3)后端嵌入安装于支撑柱(8)内,所述支撑柱(8)后端去固定杆(2)前端相焊接,所述后浇带梁板(6)下端嵌入安装于模板块(7)内,所述后浇带梁板(6)下端与木方模板(10)上端相贴合,所述支撑柱(8)后端与支撑架(5)前端相焊接,所述早拆柱头(9)嵌入安装于木方模板(10)内,所述早拆柱头(9)上端与后浇带梁板(6)下端相贴合,所述固定杆(2)下端与驱动调节机构(13)上端相焊接,所述驱动调节机构(13)右端与电力线(14)左端相连接,所述驱动调节机构(13)由接电端口(1301)、驱动电机(1302)、锥型连轴杆(1303)、驱动轮(1304)、限位滑轨杆(1305)、支撑顶块(1306)、 ...
【技术特征摘要】
1.一种后浇带施工期间保护结构,其特征在于:其结构包括连接卡扣(1)、固定杆(2)、固定螺栓(3)、连接垫板(4)、支撑架(5)、后浇带梁板(6)、模板块(7)、支撑柱(8)、早拆柱头(9)、木方模板(10)、伸缩杆(11)、横梁支杆(12)、驱动调节机构(13)、电力线(14),所述横梁支杆(12)侧端与连接卡扣(1)内侧相连接,所述横梁支杆(12)后端与伸缩杆(11)前端相焊接,所述固定螺栓(3)后端嵌入安装于支撑柱(8)内,所述支撑柱(8)后端去固定杆(2)前端相焊接,所述后浇带梁板(6)下端嵌入安装于模板块(7)内,所述后浇带梁板(6)下端与木方模板(10)上端相贴合,所述支撑柱(8)后端与支撑架(5)前端相焊接,所述早拆柱头(9)嵌入安装于木方模板(10)内,所述早拆柱头(9)上端与后浇带梁板(6)下端相贴合,所述固定杆(2)下端与驱动调节机构(13)上端相焊接,所述驱动调节机构(13)右端与电力线(14)左端相连接,所述驱动调节机构(13)由接电端口(1301)、驱动电机(1302)、锥型连轴杆(1303)、驱动轮(1304)、限位滑轨杆...