超长距离顶进用内衬式预应力钢筒混凝土管制造技术

技术编号:6071501 阅读:233 留言:0更新日期:2012-04-11 18:40
一种超长距离顶进用内衬式预应力钢筒混凝土管,包括管芯、缠绕在管芯外壁上的预应力钢丝、浇注在管芯外周围的砂浆保护层、承口和插口五部分。管芯内同轴安装有钢筒,管芯和钢筒的一端固装钢制承口圈,另一端固装带有胶圈槽的钢制插口圈,在钢制承口圈和钢制插口圈的内壁上均设有加强筋板或加强钢圈。本实用新型专利技术可阻止混凝土管在受压过程中的横向变形,从而极大地提高了混凝土管的承压能力,延长了顶进距离,达到超长顶进距离的要求。(*该技术在2021年保护过期,可自由使用*)

Long distance jacking lined type prestressed concrete cylinder pipe

A long distance jacking lined type prestressed concrete cylinder pipe, comprises a tube core, a tube core wound on the outer wall of prestressed steel wire, pouring in the tube core around the mortar layer, bell and spigot of five parts. The tube core is positioned coaxially in the steel tube, one end of tube core and steel tube fixed steel bell ring, the other end is fixedly mounted steel socket ring with rubber ring groove, reinforcing rib plates are arranged on the inner wall of steel or reinforced steel bell ring and steel ring on the socket. The utility model can prevent the transverse deformation of the concrete pipe during the compression process, thereby greatly improving the bearing capacity of the concrete pipe, prolonging the jacking distance, and achieving the requirement of long distance jacking distance.

【技术实现步骤摘要】

本技术属于一种施工用混凝土管道,特别涉及一种超长距离顶进用内衬式预应力钢筒混凝土管。技术背景钢筋混凝土管是市政排水工程中常用的一种管材,施工方法有开槽和顶进两种。 其中,顶进法施工的施工过程是a、建造顶进工作坑和接收工作坑;b、在顶进工作坑内安装顶进油缸、承顶后背、顶进导向架等顶进装置;C、吊入掘进机头,安装调试和定位;d、掘进机头工作,旋转切削土层开始掘进;e、吊入钢筋混凝土管,安放于导向架上;f、掘进机头挖掘进入土层一定距离后顶进装置工作,顶动钢筋混凝土管进入挖掘的孔穴;g、在一节管进入孔穴后吊入后一根管;h、边挖边顶进,直至达到规定长度,管子顶至接收工作坑,完成一段管道的施工。施工中向前顶管时需克服掘进机头挖掘受到的前端土层压力和向前顶管时管子与地层产生的磨擦阻力两项阻力。随着顶进距离的增大,磨擦阻力也迅速增大。油缸推进管子向前的顶力由管体混凝土承受,因此管体混凝土的承载能力决定了管道所能顶进的最大距离,在顶力超过管体混凝土所能承受的顶力时,混凝土就会发生裂缝和溃散的现象。目前有施工单位采用提高混凝土强度的方法来提增管体对混凝土的承载力,从而来延长顶进距离,但混凝土强度的本文档来自技高网...

【技术保护点】
1.一种超长距离顶进用内衬式预应力钢筒混凝土管,包括管芯、缠绕在管芯外壁上的预应力钢丝、浇注在管芯外周围的砂浆保护层、承口和插口五部分,其特征在于:管芯内同轴安装有钢筒,管芯和钢筒的一端固装钢制承口圈,另一端固装带有胶圈槽的钢制插口圈,在钢制承口圈和钢制插口圈的内壁上均设有加强筋板或加强钢圈。

【技术特征摘要】

【专利技术属性】
技术研发人员:曹生龙
申请(专利权)人:天津市泽宝水泥制品有限公司
类型:实用新型
国别省市:12

网友询问留言 已有0条评论
  • 还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。

1