The invention relates to a method for assembling the whole ring test segment of a deep tunnel shield machine. The steps are as follows: step 1, assembling the test segment and installing the test equipment; step 2, initial assembling of the test segment: first, the segment specimen with the water-stop rubber pasted is turned over horizontally to be erected laterally by a crane; the segment assembling is constructed according to the test requirements and the bottom ring of the whole ring is the first assembly ring; In step 3, after the initial installation of the segment, the test pieces are tightened according to the design torque requirements, the longitudinal bolts are tightened, the rings and rings are tightened according to the design torque requirements, and finally the overall tightening meets the design torque requirements. The assembly method of the whole ring test segment of the deep tunnel shield provided by the invention can improve the quality and efficiency of the installation of the combined multi-ring shield segment, especially the staggered joint segment.
【技术实现步骤摘要】
深隧盾构整环试验管片的拼装方法
本专利技术涉及一种隧道工程中盾构试验管片试验方法,尤其是一种盾构管片力学模拟试验的管片安装方法。
技术介绍
随着城市地下管网的发展,盾构隧道的直径与埋深尺度也越来越深,在施工或服役期间不同的地层地质条件下,遇到施工载荷或因结构自身承载性能等的变化,管片会发生不同的荷变现象。从维护盾构隧道的结构安全,延长其使用寿命为目的,准确模拟出盾构隧道的荷变过程,并对管片结构的综合力学性能状况进行规律性的研究。用1:1真实结构管片进行力学的试验方法,最能模拟盾构隧道的实际受力及荷变情况。盾构管片、特别是错缝设计的盾构管片的结构及试验荷载都很大,因此1:1盾构管片力学模拟整环试验,需要足够的管片安装空间及满足强度、刚度要求的试验用结构装置。试验管片目前常用的有卧式与立式两种安装方法,立式加载装置虽考虑了盾构管片自身的重力,但结构无法处于稳定的平衡状态,在加载过程中会产生冲击力作用,加大对管片的破坏程度,导致试验结果不准确。因此,管片卧式布置径向加载结合轴向铅锤加载的组合模拟试验装置更能满足隧道的实际受力及荷变情况实验要求。盾构隧道根据通径大小,每环通常由6-8块管片拼成,每块管片都设有环形密封橡胶条,以防止地下隧道出现渗漏水现象,破坏其正常运行。通常隧道管轴线是水平布局,施工时,管片为立式拼装工况,从封底块起,再从两边向上逐一拼接,最后安装封顶块构成圆环,其密封橡胶止水条在管片自重与拼装机动力作用下,按设计要求压缩入槽,形成密闭隧道。而试验装置采用管片卧式布置时,在试验多环组合式拼装管片时,特别是错缝设计的隧道管片,受环形密封橡胶条影响,管 ...
【技术保护点】
1.一种深隧盾构整环试验管片的拼装方法,其特征在于,其步骤如下:步骤一,试验管片拼装和试验设备的安装(1)在已选地坪上铺设厚钢板,增加地坪在整个试验中的承载及平整度;(2)在已铺设的厚钢板上用测量仪器标注出试验架内外圈机架安装中心线和边线,标注管片试件基座安装理论中心线,并根据管片黏贴止水橡胶后凸出管片结构尺寸,计算出放大的管片环形直径尺寸作为试验拼装用管片底座安装的中心线;(3)以标注的中心线和边线安装实验用内外圈钢结构反力架;(4)以放大的管片环形直径尺寸作中心线标记,就位管片底座,并将管片底座架与铺设的厚钢板临时固定,以防拼装时的管片与底座被碰触移动,使底座及管片试验时,使试验荷载中心偏移,影响整体拼装和试验质量;(6)待管片底座就位后,将厚钢板上原标注的直径和理论的管片边缘基准线引致管片基座上,并用不同颜色标注,以便于管片拼装时的参照观察;(7)在管片试件内外圈位置安装管片拼装时所要使用的调整千斤顶;步骤二,试件管片初拼装;(1)首先把黏贴好止水橡胶的管片试件用吊机由平放翻身至侧向竖立;(2)管片拼装按试验要求按图施工,整环的最下方一环为首装环;中间为次装环,最上面一环为末装环 ...
【技术特征摘要】
1.一种深隧盾构整环试验管片的拼装方法,其特征在于,其步骤如下:步骤一,试验管片拼装和试验设备的安装(1)在已选地坪上铺设厚钢板,增加地坪在整个试验中的承载及平整度;(2)在已铺设的厚钢板上用测量仪器标注出试验架内外圈机架安装中心线和边线,标注管片试件基座安装理论中心线,并根据管片黏贴止水橡胶后凸出管片结构尺寸,计算出放大的管片环形直径尺寸作为试验拼装用管片底座安装的中心线;(3)以标注的中心线和边线安装实验用内外圈钢结构反力架;(4)以放大的管片环形直径尺寸作中心线标记,就位管片底座,并将管片底座架与铺设的厚钢板临时固定,以防拼装时的管片与底座被碰触移动,使底座及管片试验时,使试验荷载中心偏移,影响整体拼装和试验质量;(6)待管片底座就位后,将厚钢板上原标注的直径和理论的管片边缘基准线引致管片基座上,并用不同颜色标注,以便于管片拼装时的参照观察;(7)在管片试件内外圈位置安装管片拼装时所要使用的调整千斤顶;步骤二,试件管片初拼装;(1)首先把黏贴好止水橡胶的管片试件用吊机由平放翻身至侧向竖立;(2)管片拼装按试验要求按图施工,整环的最下方一环为首装环;中间为次装环,最上面一环为末装环;(3)首装环安装按试验管片方位图要求在管片基座上标注管片的序...
【专利技术属性】
技术研发人员:顾解桢,朱德勇,陆正,李峰,
申请(专利权)人:上海市基础工程集团有限公司,
类型:发明
国别省市:上海,31