The utility model discloses a concrete cofferdam mixed dam, concrete gravity dam, including along the flow direction and distance of dam cofferdam X setting, the connecting section of the connection between the two is arranged between the dam and the cofferdam, so that the gravity dam and the cofferdam to form a whole, connecting the top cover concrete layer. The utility model makes full use of temporary buildings to make it into a permanent building without demolition, reducing the cost, improving the stress of the dam toe and the dam heel, enhancing the seismic performance and enhancing the stability of the dam.
【技术实现步骤摘要】
一种混凝土-土石围堰混合坝
本技术属于水利水电
,具体涉及一种混凝土-土石围堰混合坝。
技术介绍
在水利水电工程中,混凝土重力坝由于体积小、筑坝技术成熟常被采用。但重力坝抗震能力差,坝趾和坝踵容易出现拉应力。在重力坝施工前一般会在其上游或下游,或者同时在上下游设置土石围堰,用于临时挡水建,以便于重力坝的施工。当重力坝建成后,需要将土石围堰拆除。拆除过程费时费力,增加造价成本。
技术实现思路
针对上述问题,本技术旨在提供一种能够增强重力坝的抗震性能,又不增加造价成本的混凝土-土石围堰混合坝。本技术解决问题的技术方案是:一种混凝土-土石围堰混合坝,包括混凝土制重力坝、沿流水方向与重力坝间隔距离X设置的土石围堰,所述重力坝和土石围堰之间设有将二者连接的连接段,从而使重力坝和土石围堰形成一个整体,连接段顶部覆盖有混凝土层。上述方案中,将重力坝和土石围堰制成一个整体进行受力,增加了重力坝的抗震性能,无需拆除土石围堰,土石围堰成为了永久建筑物。设置混凝土的目的在于防止水流冲刷。进一步的,所述重力坝与土石围堰的间隔距离X不大于土石围堰的顶部宽度。二者的间距在这个范围内是比较经济的,如果大于这个范围可能会使制造连接段的成本大于拆除土石围堰的成本,但从造价的角度出发可能不合理。优选的,所述连接段采用粉土、粉细砂、粉煤灰等低粘性料作为填料。具体的,所述土石围堰设置于重力坝的上游、或下游,或在上下游同时设置。设置于上游可以改善坝踵应力,提高稳定性。设置于下游,当坝趾出现拉应力时,可增加坝趾的盖重。本技术的显著效果是:(1)充分利用临时建筑物,使其变成永久建筑物,无需拆除,降低了造 ...
【技术保护点】
一种混凝土‑土石围堰混合坝,包括混凝土制重力坝、沿流水方向与重力坝间隔距离X设置的土石围堰,其特征在于:所述重力坝和土石围堰之间设有将二者连接的连接段,从而使重力坝和土石围堰形成一个整体,连接段顶部覆盖有混凝土层。
【技术特征摘要】
1.一种混凝土-土石围堰混合坝,包括混凝土制重力坝、沿流水方向与重力坝间隔距离X设置的土石围堰,其特征在于:所述重力坝和土石围堰之间设有将二者连接的连接段,从而使重力坝和土石围堰形成一个整体,连接段顶部覆盖有混凝土层。2.根据权利要求1所述混凝土-土石围堰混合坝,其特征在于:...
【专利技术属性】
技术研发人员:胡娟,刘昊,
申请(专利权)人:中国电建集团中南勘测设计研究院有限公司,
类型:新型
国别省市:湖南,43