The invention discloses a geothermal deposit and collaborative mining method and system, the method comprises the following steps: first, according to the process of filling mining ore block mining, cutting; two, the construction of mine ground system of geothermal exploitation on the ground; three, the first stoping, construction of mine geothermal system in underground mining for the first four, and underground; stratified filling, formation heat filling body; five, from the first part of the above layer from bottom to top of the hierarchical mining, stoping and filling, until up to the stage of transport roadway; the system including mine geothermal exploitation ground system and exploitation of underground mine geothermal system, mine geothermal exploitation the underground system includes laying the layered mining shaft riser, roadway cross tube and patio riser, and the formation of the layered filling mining hot filling Body. The invention has the advantages of novel and reasonable design, high temperature utilization, high practicability and wide application value when the resource recovery and the geothermal exploitation are taken into consideration.
【技术实现步骤摘要】
矿床与地热协同开采方法及系统
本专利技术属于深部矿产资源开采
,具体涉及一种矿床与地热协同开采方法及系统。
技术介绍
随着浅部矿产资源的逐渐减少和枯竭,开发深部矿产资源是国家保证资源安全、扩展经济社会发展空间的重大需求。同时,深部矿产资源开发利用也符合《国家中长期科学和技术发展规划纲要(2006-2020年)》提出的“深空、深海、深蓝和深地”四个领域的战略要求。超大超深矿床开采技术是“深地”探索的重要领域,是向地球深部矿产资源进军必须解决的战略科技问题,也是代表现代矿业科技发展的高端。深部矿产资源开采处于高地应力、高地温、高井深、高渗透压等特殊环境,势必给深部矿床开采带来众多科学技术难题,严重制约着矿山生产安全、效率和成本等。为此,突破超大超深矿床开采关键技术,提升深部矿产资源开发和利用能力,对于“决战深部”战略至关重要。超大超深的矿床开采将会使矿井下形成更多的采空区、引发的更多的地质灾害、环境破坏和固体废弃物排放,必将成为制约深部矿产资源可持续开发利用与矿业健康发展的重要因素。然而,要彻底缓解资源、能源、环境和安全的瓶颈制约,必须突破传统采矿技术屏障,大力发展以清洁生产、资源高效开采和废物循环利用为特征的绿色可持续资源开发模式—充填采矿技术,同时也是未来深部采矿方法发展的必然趋势。就金属矿山来说,据不完全统计,目前全世界千米矿井数目已超过150座,其中,南非深井矿山最多有76座,同时也拥有世界最大采深近4800m,平均采深已超过2000m,采深变化范围为1524m-4800m,以金矿为主;加拿大有30座超千米矿山,采深变化范围为1524m-2499 ...
【技术保护点】
一种矿床与地热协同开采方法,其特征在于,该方法包括以下步骤:步骤一、根据充填开采工艺进行矿块的采准、切割,形成天井(1)、联络巷(2)、阶段运输巷道(3)、竖井(4)和回采空间;步骤二、在地面进行矿井地热开采地面系统的施工,具体的施工过程为:在地面设置用于存储冷换热流体的集流体装置(10)和用于存储热换热流体的蓄热流体装置(11),并在住宅/办公区(16)设置用于为住宅/办公区(16)供热的冷热交换器(15);在集流体装置(10)的流体入口处连接与冷热交换器(15)的冷换热流体出口连接的冷换热流体输送管(19),在集流体装置(10)的流体出口处连接地面送流体管(12),在地面送流体管(12)上连接送流体动力泵(13),在蓄热流体装置(11)的流体入口处连接地面回流体管(14),在蓄热流体装置(11)的流体出口连接与冷热交换器(15)的热换热流体入口连接的热换热流体输送管(18),在热换热流体输送管(18)上连接热换热流体输送动力泵(17);步骤三、进行第一分层回采,并在地下进行矿井地热开采地下系统的施工,具体的施工过程为:在竖井(4)内铺设竖井立管,在阶段运输巷道(3)内铺设巷道横管, ...
【技术特征摘要】
1.一种矿床与地热协同开采方法,其特征在于,该方法包括以下步骤:步骤一、根据充填开采工艺进行矿块的采准、切割,形成天井(1)、联络巷(2)、阶段运输巷道(3)、竖井(4)和回采空间;步骤二、在地面进行矿井地热开采地面系统的施工,具体的施工过程为:在地面设置用于存储冷换热流体的集流体装置(10)和用于存储热换热流体的蓄热流体装置(11),并在住宅/办公区(16)设置用于为住宅/办公区(16)供热的冷热交换器(15);在集流体装置(10)的流体入口处连接与冷热交换器(15)的冷换热流体出口连接的冷换热流体输送管(19),在集流体装置(10)的流体出口处连接地面送流体管(12),在地面送流体管(12)上连接送流体动力泵(13),在蓄热流体装置(11)的流体入口处连接地面回流体管(14),在蓄热流体装置(11)的流体出口连接与冷热交换器(15)的热换热流体入口连接的热换热流体输送管(18),在热换热流体输送管(18)上连接热换热流体输送动力泵(17);步骤三、进行第一分层回采,并在地下进行矿井地热开采地下系统的施工,具体的施工过程为:在竖井(4)内铺设竖井立管,在阶段运输巷道(3)内铺设巷道横管,并在与天井(1)连接处设置巷道横管预留接口(22),在天井(1)中铺设天井立管,同时在每个联络巷(2)内设置天井立管预留接口(23);其中,所述竖井立管包括竖井送流体立管(6-1)和竖井回流体立管(6-2),所述巷道横管包括巷道送流体横管(7-1)和巷道回流体横管(7-2),所述天井立管包括天井送流体立管(8-1)和天井回流体立管(8-2),所述竖井送流体立管(6-1)与地面送流体管(12)连接,所述竖井回流体立管(6-2)与地面回流体管(14)连接,所述巷道送流体横管(7-1)与竖井送流体立管(6-1)和天井送流体立管(8-1)均连接,所述巷道回流体横管(7-2)与竖井回流体立管(6-2)和天井回流体立管(8-2)均连接;步骤四、进行第一分层充填,充填时相变蓄热材料(21-1)和采热管(21-2)分层交替设置,并设置溜井(21-3)和硬化顶(21-4),形成采热充填体(21),具体过程为:步骤401、在采空区安装溜井(21-3)模具,并设定充填时的相变蓄热材料(21-1)充填层数和采热管(21-2)的层数;步骤402、输入相变蓄热材料(21-1)进行充填,至需要设置采热管(21-2)的高度后,在相变蓄热材料(21-1)上铺设作业平板,铺设采热管(21-2),采热管(21-2)铺设完成后撤掉作业平板,并将采热管(21-2)与天井立管预留接口(23)连接;步骤403、重复步骤402,直至相变蓄热材料(21-1)充填层数和采热管(21-2)的层数达到了步骤401设定的值;步骤404、输入硬化材料进行充填,形成硬化顶(21-4);步骤五、从第一分层以上部分从下到上依次进行各分层的开采、回采和充填,且在各分层回采时,均按照步骤三的施工过程进行矿井地热开采地下系统的施工,在各分层充填时,均按照步骤四的方法进行充填,直至向上到阶段运输巷道(3);步骤五中在完成第N分层的开采、回采和充填后,启动送流体动力泵(13)和热换热流体输送动力泵(17),在送流体动力泵(13)的作用下,集流体装置(10)内的冷换热流体经过地面送流体管(12)进入竖井送流体立管(6-1),再进入巷道送流体横管(7-1),分送到每个天井送流体立管(8-1),然后送到与天井送流体立管(8-1)连接的采热管(21-2)中,冷换热流体在流过采热管(21-2)时吸收相变蓄热材料(21-1)积蓄的地热而成为热换热流体,然后进入天井回流体立管(8-2),经过巷道回流体横管(7-2)和竖井回...
【专利技术属性】
技术研发人员:刘浪,张小艳,张波,孙伟博,王美,邱华富,王燕,陈柳,王湃,秦学斌,方治宇,辛杰,朱超,
申请(专利权)人:西安科技大学,
类型:发明
国别省市:陕西,61