The invention relates to a transmission tower to correct deviation method, which comprises the following steps: 1) according to the current tilt of the transmission tower, the tower leg calculation deviation; 2) according to the tower leg deviation and structure of transmission tower, determine corrective equipment used; 3) by correcting device on the transmission tower the tower leg deviation; 4) on transmission tower rectification after base reinforcement. Get the deviation to the invention accurately, and determine the appropriate tool for correcting the deviation, and can not destroy the original structure of foundation reinforcement in the case, on the basis of the reinforcement and rectification of safe and reliable.
【技术实现步骤摘要】
一种输电线路铁塔纠正偏离方法
本专利技术涉及一种输电线路铁塔纠正偏离方法。
技术介绍
当铁塔发生倾斜时,常见的处理方法主要由两大类:一类是异地改造;另一类则是对倾斜的铁塔进行纠偏处理。输电线路铁塔的纠偏:一方面考虑塔体本身及铁塔停电施工带来的经济社会影响;另一方面,铁塔属于高耸结构,考虑其受力以水平纠偏荷载为主,其中主要包括线条纠偏荷载及风纠偏荷载。
技术实现思路
本专利技术的目的就是为了克服上述现有技术存在的缺陷而提供一种输电线路铁塔纠正偏离方法。本专利技术的目的可以通过以下技术方案来实现:一种输电铁塔纠偏方法,包括以下步骤:根据输电铁塔的当前的倾斜量,计算塔腿纠偏量;根据塔腿纠偏量以及输电铁塔的结构,确定所使用的纠偏设备;采用纠偏设备对输电铁塔的塔腿进行纠偏;对纠偏后的输电铁塔的塔基进行加固。步骤1)中通过测量获取输电铁塔的倾斜量,然后根据设定的纠偏目标量,计算得到塔腿纠偏量。步骤2)中首先由塔腿纠偏量以及输电铁塔的结构得到输电铁塔的纠偏荷载,根据纠偏荷载确定纠偏时的顶升支撑方式,然后计算顶力,根据顶力确定适合的纠偏设备。步骤4)中首先在塔基的平板基础上设置“井”字形的倒梁,将四个平板基础连成一个整体,然后在每个平板基础上设置静压桩或钻孔灌注桩,加固倒梁与平板基础之间的连接强度。与现有技术相比,本专利技术根据铁塔的结构以及当前的倾斜量进行计算,准确的获取需要的纠偏量,同时确定合适的纠偏工具进行纠偏,同时可以在不破坏原有基础结构的情况下进行加固,施工过程中无冲击纠偏荷载或冲击很小,对送电铁塔无太大影响;施工占地面积小,操作灵活,对基础的加固和纠偏安全可靠,可 ...
【技术保护点】
一种输电铁塔纠偏方法,其特征在于,包括以下步骤:1) 根据输电铁塔的当前的倾斜量,计算塔腿纠偏量;2) 根据塔腿纠偏量以及输电铁塔的结构,确定所使用的纠偏设备;3) 采用纠偏设备对输电铁塔的塔腿进行纠偏;4) 对纠偏后的输电铁塔的塔基进行加固。
【技术特征摘要】
1.一种输电铁塔纠偏方法,其特征在于,包括以下步骤:1)根据输电铁塔的当前的倾斜量,计算塔腿纠偏量;2)根据塔腿纠偏量以及输电铁塔的结构,确定所使用的纠偏设备;3)采用纠偏设备对输电铁塔的塔腿进行纠偏;4)对纠偏后的输电铁塔的塔基进行加固。2.根据权利要求1所述的一种输电铁塔纠偏方法,其特征在...
【专利技术属性】
技术研发人员:侯淑娥,刘春朋,潘成龙,
申请(专利权)人:青岛海汇铁塔机械有限公司,
类型:发明
国别省市:山东,37