The invention discloses a power line device including: elevated snow, collar, penetrated into the power line elevated two ropes and two mini motor; wherein, the collar connecting the two ropes, the two ropes are respectively connected with the two electric motors, the two micro motor in two adjacent cable support tower or power; the need for snow de icing, the micro motor starting by traction, pulling the collar in the power overhead line and the sliding rope. With the invention of the electric power overhead line device not only solves the snow, rain and snow ice snow removing power overhead lines is not timely, not ideal, and simple structure, convenient operation, time-saving and labor-saving.
【技术实现步骤摘要】
电力高架线扫雪装置
本专利技术涉及电力线路维护设备领域,尤其涉及一种可用于野外、寒冷地带等气候恶劣地区的电力高架线扫雪装置。
技术介绍
现阶段的电力系统中,电缆在寒冷的野外地区维修十分困难,尤其是经常有雨雪的地区,易在电缆上结冰,使电缆的传输效率大大降低,且由于重量增加,使得电缆的断缆率上升。因雪灾导致电力设施损毁,使许多城市乡村因停电或拉闸限电陷入寒冷黑暗,生产生活极其不便。而不少电力塔的扭曲、倒塌就是由于输电线路上覆盖的冰的重量远超过设计值,不仅电力中断,甚至造成了抢修人员的伤亡。国内外对于输电线路的防冰和除冰研究现状是:一、防冰方式:铁磁线、电磁波、热吸收器,其中已有部分应用,但防冰效果不明显、价格高、耗电量大而使得难以推广;二、除冰技术:目前国内外主要采用热力法,如:阻性线、短路电流、过电流的方式使其发热以达到除冰的目的,因耗电量大、郊果不明显而无法推广;三、机械除冰:目前国内外采用的技术有adhoc、手工的方式,效率低下且很不安全,难以在实际工程中应用。
技术实现思路
本专利技术要解决的技术问题是提供一种电力高架线扫雪装置,以解决以往雨雪天气时高架电力线路扫雪除冰不及时、不理想的问题。本专利技术解决上述技术问题的技术方案如下:一种电力高架线扫雪装置,其特征在于,穿设于电力高架线上的套环、两条绳索以及两台微型电动机;其中,所述套环连接着所述两条绳索,所述两条绳索分别连接所述两台微型电动机,所述两台微型电动机分别置于相邻的两个电缆支架或者电力塔上;需要进行扫雪除冰时,启动所述微型电动机通过所述绳索的牵引、拉着所述套环在电力高架线上滑动。本专利技术的有益效 ...
【技术保护点】
电力高架线扫雪装置,其特征在于,包括:穿设于电力高架线上的套环(100)、两条绳索(200)以及两台微型电动机(300);其中,所述套环(100)连接着所述两条绳索(200),所述两条绳索(200)分别连接所述两台微型电动机(300),所述两台微型电动机(300)分别置于相邻的两个电缆支架或者电力塔上;需要进行扫雪除冰时,启动所述微型电动机(300)通过所述绳索(200)的牵引、拉着所述套环(100)在电力高架线上滑动。
【技术特征摘要】
1.电力高架线扫雪装置,其特征在于,包括:穿设于电力高架线上的套环(100)、两条绳索(200)以及两台微型电动机(300);其中,所述套环(100)连接着所述两条绳索(200),所述两条绳索(200)分别连接所述两台微型电动机(300),所述两台微型电动机(300)分别置于相邻的两个电缆支架或者电力塔上;需要进行扫雪除冰时,启动所述微型电动机(300)通过所述绳索(200)的牵引、拉着所述套环(100)在电力高架线上滑动。2.根据权利要求1所述的电力高架线扫雪装置,其特征在...
【专利技术属性】
技术研发人员:刁培松,隋京轩,
申请(专利权)人:国网山东海阳市供电公司,
类型:发明
国别省市:山东,37