The invention discloses a construction method of detecting installation of drainage pipe, comprising the steps of: measuring a discharge tube and the size of the riser, the pipe cutting machine or hand saw of the drainage tube and the vertical tube cutting, drainage pipe and vertical pipe connected; step B: drainage pipe, vertical pipe installed after docking the closed water test, drainage pipe is installed at the exit of the inflating airbag airbag comprises the airbag body is fixedly connected and covered in the drainage pipe thread on the outlet of the coating, coating is sheathed on the pipe thread outer wall of threaded connection, installed airbag, airbag to the body to make the inflatable airbag body blocking up the drainpipe exit from the water inlet to the riser riser tube drainage and irrigation, not decreased for the closed water test qualified riser water level in the water level decline is not qualified, through the screw thread sets will be coated inflatable balloon from the water drainage The utility model has the advantages of convenient disassembly and assembly of the inflating air bag, no damage to the pipe material of the drainpipe, and the integrity and the tightness of the drainage pipe.
【技术实现步骤摘要】
排水管道安装检测施工方法
本专利技术涉及管道安装施工
,特别涉及一种排水管道安装检测施工方法。
技术介绍
在市政工程建设中,排水工程是比较重要的一项,目前,现有的城镇雨水、污水排放,工业废水排放、小区排放工程均通过水泥、金属管材排水管道施工来实现,而现有的排水管道施工方法存在着施工速度慢、管材重量重,搬运不方便等问题。在专利申请号为“200910015699.8”的一篇中国专利文件中,记载了一种室外埋地高密度聚乙烯双壁波纹排水管安装施工方法,以解决上述问题,该施工方法包括基槽开挖、管道安装、回填;基槽开挖工艺过程包括测量放线、机械开槽、槽底平整夯实、砂砾垫层、砂基,管道安装工艺过程包括安装管道、井室砌筑抹面,回填工艺过程包括胸腔填土、闭水试验、回填土夯实,在管道和检查井施工完毕后,管道回填土前,做闭水实验,管道每三个井段抽验一段,做闭水试验时,用砖块和砂浆封堵检查井进水管口,闭水试验的水位,为试验段上游管道内顶以上2m,如上游管内顶至检查井口的高度小于2m时,闭水试验水位可至井口为止,闭水试验应在管道灌满水24小时后再进行,对渗水量的测定时间不少于30分钟,进行外观检查,没有漏水现象,且在规范允许渗水量范围内,管道闭水试验合格,当试验不合格时,应立即将管内的水抽干,仔细检查渗漏原因,并进行修补。但是,上述这种排水管道工程施工方法存在一定的缺陷,在进行闭水试验时,用砖块和砂浆封堵检查井的进水管口,在砂浆固化之后,才能向管道内灌水,进行闭水试验,在完成闭水试验后,又需要将砖块和砂浆从进水管口内拆除下来,从而使整个闭水试验从开始到结束需要占用较长的施工时间 ...
【技术保护点】
一种排水管道安装检测施工方法,其特征在于:包括步骤a:测量排出管和立管(1)的尺寸,采用切管机或手工锯对排水管(2)和立管(1)进行切割,切割后,排水管(2)和立管(1)的断口用锉刀除掉内外飞刺,外棱锉出15°~30°的坡度,坡口厚度为排水管(2)壁厚的1/3~1/2,坡口长度不小于3mm,坡口完成后,排水管(2)和立管(1)对接连通;步骤b:排水管(2)、立管(1)对接安装好之后做闭水试验,排水管(2)的出口安装充气气囊(3),充气气囊(3)包括固定连接的气囊本体(302)以及包覆在排水管(2)出口上的螺纹包覆套(301),螺纹包覆套(301)于排水管(2)的外管壁螺纹连接,安装好充气气囊(3)后,向气囊本体(302)内充气以使气囊本体(302)堵堵住排水管(2)出口,从立管(1)的进水端向立管(1)和排水管(2)内灌水,立管(1)内水位不下降为闭水试验合格,水位下降为闭水试验不合格。
【技术特征摘要】
1.一种排水管道安装检测施工方法,其特征在于:包括步骤a:测量排出管和立管(1)的尺寸,采用切管机或手工锯对排水管(2)和立管(1)进行切割,切割后,排水管(2)和立管(1)的断口用锉刀除掉内外飞刺,外棱锉出15°~30°的坡度,坡口厚度为排水管(2)壁厚的1/3~1/2,坡口长度不小于3mm,坡口完成后,排水管(2)和立管(1)对接连通;步骤b:排水管(2)、立管(1)对接安装好之后做闭水试验,排水管(2)的出口安装充气气囊(3),充气气囊(3)包括固定连接的气囊本体(302)以及包覆在排水管(2)出口上的螺纹包覆套(301),螺纹包覆套(301)于排水管(2)的外管壁螺纹连接,安装好充气气囊(3)后,向气囊本体(302)内充气以使气囊本体(302)堵堵住排水管(2)出口,从立管(1)的进水端向立管(1)和排水管(2)内灌水,立管(1)内水位不下降为闭水试验合格,水位下降为闭水试验不合格。2.根据权利要求1所述的排水管道安装检测施工方法,其特征在于:在步骤a中:排水管(2)和立管(1)采用胶粘剂粘接连通,粘接前,对排水管(2)的插口与立管(1)的承口试插一次,测量插口插入承口内的试插深度,试插后,用棉丝将承口和插口粘接部位的水分、灰尘擦拭干净,然后用毛刷蘸胶粘剂涂刷承口和插口,涂刷完毕后,将排水管(2)和立管(1)插接,插入粘接...
【专利技术属性】
技术研发人员:王晟,周羿,葛英炜,胡春燕,吴世明,刘涛,傅金文,
申请(专利权)人:苏州建设监理有限公司,
类型:发明
国别省市:江苏,32