Large-span skew frame culvert jacking construction method of shallow buried a line, which comprises the following steps: 1, the Li Heng jacking beam lifting load, transverse load carrying beam layout, function using flat car welding or bolt connection and I-beam; 2, calculation of precipitation, and then drop wells and observation wells according to the precipitation layout; 3, through strengthening the stability of subgrade reinforcement, frame structure on both sides of the subgrade, using partial excavation control of frame culvert jacking deviation; 4, the calculation of jacking force and according to the regression equation for the conversion of the hydraulic jack; 5, to determine the opening sequence and the top group Jack the relative coordinates of the poor design process. The invention can control the deviation value of the frame culvert jacking into the allowable range, realize the scientific rationalization of the jacking of the frame culvert, and improve the efficiency and the quality of the jacking.
【技术实现步骤摘要】
本专利技术涉及一种既有线浅埋大跨度斜交框构涵顶进施工方法。
技术介绍
近年来,随着交通运输的发展,顶进工程在公路、铁路等立体交叉工程被广泛应用。但是该施工方法对其周围环境有着不同的影响,特别是顶进涵埋深度较浅时,虽然减少了顶进阻力,但对线路的影响更为严重,极易发生线路偏移。目前,对于既有线浅埋框构涵顶进偏差的控制主要依赖于操作人员的施工经验,根据经验左右偏差,不能合理利用周围环境,无法对框构涵顶进偏差控制达到一个数据化、系统化分析和推广,因此常常因为纠偏荷载施加不到位,而使混凝土开裂,更甚者等到框构就位后,需要原地纠偏,从而导致铁路路基连续扰动失稳,影响行车安全。因框构涵顶进偏差控制要求严格,机械设备投入量大,对于目前调查、统计结果显示,框构涵顶进偏差控超出允许范围频率较高,纠偏带来的质量问题和延误工期情况严重。
技术实现思路
本专利技术的目的就在于克服上述现有技术中存在的不足,而提供一种既有线浅埋大跨度斜交框构涵顶进施工方法,该方法可使框构涵顶进偏差值控制在允许范围内,实现框构涵顶进的科学合理化,并且提高顶进的效率和质量。如上构思,本专利技术的技术方案是:一种既有线浅埋大跨度斜交框构涵顶进施工方法,其特征在于:包括如下步骤:一、选择最利顶进的横抬梁荷载作用点,布设横抬梁荷载作用点,作用点使用平板车焊接或者螺栓连接与工字钢上;二、通过计算确定合理的降水位;Ⅰ、降水计算:(1)无压完整井深井点涌水量计算:式中:Q—渗水井系统假定涌水量;K-土的渗透系数(m/d);H-含水层厚度(m);xo-基坑假设半径;R-抽水影响半径;s-基坑水位下降深度;S=(D-dw) ...
【技术保护点】
一种既有线浅埋大跨度斜交框构涵顶进施工方法,其特征在于:包括如下步骤:一、选择最利顶进的横抬梁荷载作用点,布设横抬梁荷载作用点,作用点使用平板车焊接或者螺栓连接与工字钢上;二、通过计算确定合理的降水位;Ⅰ、降水计算:(1)无压完整井深井点涌水量计算:Q=1.366K(2H-s)slgR-lgxo---(2-1)]]>式中:Q—渗水井系统假定涌水量;K‑土的渗透系数(m/d);H‑含水层厚度(m);xo‑基坑假设半径;R‑抽水影响半径;s‑基坑水位下降深度;S=(D‑dw)+sw (2‑2)式中:D—框构顶进开挖深度;dw—地下静水位的埋深(m);sw—基坑中心处水位与基坑开挖面的距离(m)。(2)降水管井的数量计算:深井单位长度水量:式中r‑探井井点半径(m);单个管井的流量:降水井的个数:式中:q—单个管井的流量;r—过滤半径;l—进水长度;k—渗透系数。水位降低值校核:h=H2-Q1.366K[lgR-12lgx1x2]]]>式中:x1、x2‑坑底任一点至各井点的水平距离;Ⅱ、挖土放坡最大高度计算:(1)滑动土体的重力:(2)挖 ...
【技术特征摘要】
1.一种既有线浅埋大跨度斜交框构涵顶进施工方法,其特征在于:包括如下步骤:一、选择最利顶进的横抬梁荷载作用点,布设横抬梁荷载作用点,作用点使用平板车焊接或者螺栓连接与工字钢上;二、通过计算确定合理的降水位;Ⅰ、降水计算:(1)无压完整井深井点涌水量计算:Q=1.366K(2H-s)slgR-lgxo---(2-1)]]>式中:Q—渗水井系统假定涌水量;K-土的渗透系数(m/d);H-含水层厚度(m);xo-基坑假设半径;R-抽水影响半径;s-基坑水位下降深度;S=(D-dw)+sw(2-2)式中:D—框构顶进开挖深度;dw—地下静水位的埋深(m);sw—基坑中心处水位与基坑开挖面的距离(m)。(2)降水管井的数量计算:深井单位长度水量:式中r-探井井点半径(m);单个管井的流量:降水井的个数:式中:q—单个管井的流量;r—过滤半径;l—进水长度;k—渗透系数。水位降低值校核:h=H2-Q1.366K[lgR-12lgx1x2]]]>式中:x1、x2-坑底任一点至各井点的水平距离;Ⅱ、挖土放坡最大高度计算:(1)滑动土体的重力:(2)挖方边坡允许最大高度:式中:h—挖方边坡的允许最大高度(m);G-滑动土体ABC的重力(kN/m);γ-土的重力(kN/m3);θ-边坡的坡度角(°);c-土的黏聚力(kN/m2);-土的内摩擦角(°);Ⅲ、地基沉降计算:(1)压缩模量:(2)基底附加压力:(3)基础底面处土的自重应力:Pc=γd(4)基底附加应力:Po=P-Pc(5)确定沉降计算深度:Zo=b(2.5+0.4lnb)(6)复核沉降计算深度:三、通过路基加固,加强框构两侧路基的稳定性,利用偏挖土来控制对框构涵顶进偏差;四、计算顶进力并根据千斤顶回归方程换算为...
【专利技术属性】
技术研发人员:徐大平,张鹏忠,刘子田,刘超,陈涛涛,袁向彪,
申请(专利权)人:中铁十八局集团第四工程有限公司,中铁十八局集团有限公司,
类型:发明
国别省市:天津;12