The invention relates to a tunnel reinforcement device for civil engineering bridges, which comprises a bottom plate, a glue coating device installed on the rear side of the bottom plate, a cutting and collecting device installed on the front side of the bottom plate, a glue coating support frame installed on the bottom plate, a spreading installation slot arranged on the front end of the glue coating support frame, and a glue coating support frame in the middle part. There is a leakage opening, and the glue support rack is provided with a glue placing box. The invention needs to cut carbon fiber cloth manually according to the processing size, needs to apply glue on the carbon fiber cloth manually, needs to code and place the carbon fiber cloth after gluing manually, has poor accuracy of manual cutting carbon fiber, uneven manual gluing, and affects the effect of house reinforcement, and manually code and place the carbon fiber cloth. Complex, glued carbon fiber cloth can not be stacked, the space required for yarding is large, space utilization rate is low, labor intensity is large and work efficiency is low.
【技术实现步骤摘要】
一种土木工程桥梁隧道加固设备
本专利技术涉及土木工程加固设备
,具体的说是一种土木工程桥梁隧道加固设备。
技术介绍
一般加固方式有“粘贴碳纤维、粘钢、包钢(型钢)、预应力加固、混凝土置换、植筋加固,其中碳纤维布加固修复混凝土结构技术是采用配套胶粘剂将碳纤维布粘贴于混凝土表面,起到结构补强和抗震加固的作用。广泛用于桥梁、隧道等其它土木工程的加固补强,使用碳纤维布加固墙体的过程中需要根据实际工作情况对碳纤维布进行切割加工,将调配好的胶液涂覆在碳纤维布上,然后将碳纤维布进行均匀码放,以便工人进行加固施工,但是现有人工处理炭纤维布过程中需要人工根据加工尺寸对炭纤维布进行切割处理,需要人工将胶液涂敷在炭纤维布上,需要人工对涂胶后的炭纤维布进行码放,人工切割炭纤维精确度差,人工涂胶不均匀,影响房屋加固的效果,人工码放炭纤维布操作复杂,涂胶后的炭纤维布不能叠放,码放所需空间大、空间利用率低、劳动强度大与工作效率低。
技术实现思路
为了解决上述问题,本专利技术提供了一种土木工程桥梁隧道加固设备,可以解决现有人工处理炭纤维布过程中存在的需要人工根据加工尺寸对炭纤维布进行切割处理,需要人工将胶液涂敷在炭纤维布上,需要人工对涂胶后的炭纤维布进行码放,人工切割炭纤维精确度差,人工涂胶不均匀,影响房屋加固的效果,人工码放炭纤维布操作复杂,涂胶后的炭纤维布不能叠放,码放所需空间大、空间利用率低、劳动强度大与工作效率低等难题,可以实现房屋加固炭纤维布快速涂胶切割处理的功能,无需人工操作,提高了空间的利用效率,且具有房屋加固的效果好、涂胶均匀、切割精确度高、操作简单、劳动强度小与工作效 ...
【技术保护点】
1.一种土木工程桥梁隧道加固设备,包括底板(1),其特征在于:底板(1)的后侧安装有涂胶装置(3),底板(1)的前侧安装有切割收集装置(4),底板(1)上安装有两个定位辊(5),两个定位辊(5)对称位于底板(1)前后两端的外侧;所述涂胶装置(3)包括安装在底板(1)上的涂胶支撑架(31),涂胶支撑架(31)的前端设置有摊覆安装槽,涂胶支撑架(31)的中部设置有漏料口,涂胶支撑架(31)上安装有胶液放置箱(32),胶液放置箱(32)的上端设置有进料口,胶液放置箱(32)的下端设置有出料口,漏料口与出料口相对应,胶液放置箱(32)的下端从外往内为向下倾斜结构,涂胶支撑架(31)的下端安装有涂胶执行机构(33),涂胶执行机构(33)与漏料口相互配合运动,涂胶执行机构(33)的前端安装有涂胶摊覆机构(34);所述切割收集装置(4)包括安装在底板(1)上的两个纵向切割机构(41),两个纵向切割机构(41)对称位于底板(1)的左右两侧,底板(1)上安装有切割推送机构(42),切割推送机构(42)位于两个纵向切割机构(41)的前侧,底板(1)上安装有收集放置机构(43),收集放置机构(43)位于切割 ...
【技术特征摘要】
1.一种土木工程桥梁隧道加固设备,包括底板(1),其特征在于:底板(1)的后侧安装有涂胶装置(3),底板(1)的前侧安装有切割收集装置(4),底板(1)上安装有两个定位辊(5),两个定位辊(5)对称位于底板(1)前后两端的外侧;所述涂胶装置(3)包括安装在底板(1)上的涂胶支撑架(31),涂胶支撑架(31)的前端设置有摊覆安装槽,涂胶支撑架(31)的中部设置有漏料口,涂胶支撑架(31)上安装有胶液放置箱(32),胶液放置箱(32)的上端设置有进料口,胶液放置箱(32)的下端设置有出料口,漏料口与出料口相对应,胶液放置箱(32)的下端从外往内为向下倾斜结构,涂胶支撑架(31)的下端安装有涂胶执行机构(33),涂胶执行机构(33)与漏料口相互配合运动,涂胶执行机构(33)的前端安装有涂胶摊覆机构(34);所述切割收集装置(4)包括安装在底板(1)上的两个纵向切割机构(41),两个纵向切割机构(41)对称位于底板(1)的左右两侧,底板(1)上安装有切割推送机构(42),切割推送机构(42)位于两个纵向切割机构(41)的前侧,底板(1)上安装有收集放置机构(43),收集放置机构(43)位于切割推送机构(42)的左侧。2.根据权利要求1所述的一种土木工程桥梁隧道加固设备,其特征在于:所述涂胶执行机构(33)包括安装在涂胶支撑架(31)下端的涂胶升降气缸(331),涂胶升降气缸(331)的顶端通过法兰安装在涂胶升降板(332)上,涂胶升降板(332)上设置有过胶槽,涂胶升降板(332)与涂胶支撑架(31)之间通过柔性裙边(333)相连,涂胶升降板(332)板的下端设置有涂胶防护管(334),涂胶防护管(334)的上下两端均为开口结构,涂胶防护管(334)的上端后侧设置有涂胶限料槽,涂胶防护管(334)的内壁之间通过轴承安装有涂胶旋转辊(335),涂胶旋转辊(335)的左端通过联轴器与涂胶旋转电机(336)的输出轴相连,涂胶旋转电机(336)通过电机座安装在涂胶防护管(334)的外壁上,涂胶旋转辊(335)的外壁上均匀设置有毛刷,涂胶支撑架(31)的后端下侧安装有涂胶限位气缸(337),涂胶限位气缸(337)的顶端通过法兰安装涂胶限位架(338)上,涂胶限位架(338)与涂胶限料槽相互配合运动。3.根据权利要求1所述的一种土木工程桥梁隧道加固设备,其特征在于:所述涂胶摊覆机构(34)包括通过销轴安装在摊覆安装槽内的摊覆旋转架(341),摊覆旋转架(341)的下端通过轴承设置有摊覆调节辊(342),摊覆旋转架(341)的上端侧壁通过销轴与摊覆调节气缸(343)的顶端相连,摊覆调节气缸(343)的底端通过轴承安装在涂胶支撑架(31)上,涂胶支撑架(31)的前端安装有摊覆电动滑块(344),摊覆电动滑块(344)上安装有摊覆移动架(345),摊覆移动架(345)的前端下侧设置有摊覆工作槽,摊覆工作槽内通过销轴安装有摊覆执行板(346),摊覆执行板(346)的下端安装有摊覆执行块(347),摊覆执行板(346)的上端设置有摊覆辅助辊(348),摊覆执行板(346)的侧壁上安装有摊覆复位弹簧(349),摊覆复位弹簧(349)的下端安装在摊覆移动架(345)上,摊覆移动架(345)的前端通过电机座安装有摊覆执行电机(3410),摊覆执行电机(3410)的输出轴上安装有摊覆转动块(3411),摊覆转动块(3411)紧贴在摊覆辅助辊(348)的外壁上...
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。