The invention discloses a water level adjustment method for eliminating the water abandoning of a hydropower station in reverse time, which is used to solve the problem of removing the abandoned water in the process of optimal dispatching of hydropower. The methods include: obtaining the storage capacity and the power generation parameters of the water power station, obtaining the initial storage capacity and the initial outflow rate, and calculating the maximum power generation flow of the hydropower station by the initial storage amount of water. The excess water balance equation is used to deduce the initial storage capacity of the period, and correct and discriminate it. Finally, the optimal initial storage capacity and corresponding storage level are obtained. The principle of the invention is simple and easy to operate. By adjusting the water level of the initial reservoir as small as possible, the water level of the hydropower station in this period can be minimized. It can be applied to the actual scheduling and production to solve the problem, and it is practical.
【技术实现步骤摘要】
一种逆时消纳水电站弃水的水位调整方法
本专利技术涉及水能规划
,特别是一种逆时消纳水电站弃水的水位调整方法。
技术介绍
弃水是影响水电站经济运行的一个很重要因素,减少弃水自然成为优化调度的重要目标之一。在以往的调度过程中,当水电站有弃水风险时,为了尽量避免弃水,水电站一般会降低水位运行,通过提高电站耗水率来增加出库流量避免弃水。这种调度方式能在一定程度上降低水电站弃水的风险,但并不是最优的调度方式;预先控制水电站水位运行在低水位,需要频繁调整水电站的发电出力,对电站和电网的安全运行不利。传统弃水方法是,当水库水位达到设定的最高限制水位且水电站入库流量大于其最大发电流量时产生弃水。一种最小弃水法,其主要思想是使计算时段弃水量最小,并在满足约束条件的基础上,水库尽可能蓄高水位,以抬高发电水头,从而增加水电站发电效益。最小弃水法的弃水决策较为冗杂,需要根据调度期入库流量,对水库进行预计算后,再给出相应的弃水决策。上述的弃水方法是一种静态的弃水策略,无论对于单一水电站还是梯级水电站而言都具有一定的不合理性。针对静态弃水策略的不足,在构建水头和发电流量最佳协调条件的基础上,建立动态弃水模型。动态弃水模型为非线性多目标优化问题,计算较为复杂,在追求最佳发电流量时产生弃水量较大,造成水资源的浪费,降低了水资源的利用率。
技术实现思路
本专利技术的目的是,提供一种逆时消纳水电站弃水的水位调整方法,可提高水资源的利用率,同时满足水电站的发电效益。本专利技术采取的技术方案为:一种逆时消纳水电站弃水的水位调整方法,包括:S1,获取水电站在有弃水的时段Δt中的库容参数和发电参数 ...
【技术保护点】
1.一种逆时消纳水电站弃水的水位调整方法,其特征是,包括:S1,获取水电站在有弃水的时段Δt中的库容参数和发电参数数据;S2,基于S1获取的参数数据,求取Δt时段末的蓄水位和出库流量Qini,并将Δt时段初蓄水量Vini作为时段初蓄水量V0的初始值,将求取的出库流量Qini作为出库流量Q的初始值;S3,基于S1获取的参数数据,求取Δt时段末的蓄水位,根据当前时段初蓄水量V0和时段末的蓄水位,求取Δt时段的最大发电流量;定义获得最大发电流量对应的时段初蓄水量为Vx,则Vx=V0;S4,将S3求得的最大发电流量,与当前出库流量进行比较,将两者中的较小值作为更新的出库流量值,即:Q(n)=min(Gmax,Q(n‑1));Q(n)代表更新的出库流量,Q(n‑1)代表更新前的当前出库流量;S5,根据S4更新后的出库流量值,利用水量平衡方程,逆推求取时段初蓄水量,然后根据水库蓄水量上下限对求取的时段初蓄水量进行校正;S6,将校正后的时段初蓄水量V0与获得最大发电量对应的时段初蓄水量Vx进行比较,判断两者之间的差值是否满足水库蓄水量变幅约束:若满足,则将校正后的时段初蓄水量V0作为最优时段初蓄水量 ...
【技术特征摘要】
1.一种逆时消纳水电站弃水的水位调整方法,其特征是,包括:S1,获取水电站在有弃水的时段Δt中的库容参数和发电参数数据;S2,基于S1获取的参数数据,求取Δt时段末的蓄水位和出库流量Qini,并将Δt时段初蓄水量Vini作为时段初蓄水量V0的初始值,将求取的出库流量Qini作为出库流量Q的初始值;S3,基于S1获取的参数数据,求取Δt时段末的蓄水位,根据当前时段初蓄水量V0和时段末的蓄水位,求取Δt时段的最大发电流量;定义获得最大发电流量对应的时段初蓄水量为Vx,则Vx=V0;S4,将S3求得的最大发电流量,与当前出库流量进行比较,将两者中的较小值作为更新的出库流量值,即:Q(n)=min(Gmax,Q(n-1));Q(n)代表更新的出库流量,Q(n-1)代表更新前的当前出库流量;S5,根据S4更新后的出库流量值,利用水量平衡方程,逆推求取时段初蓄水量,然后根据水库蓄水量上下限对求取的时段初蓄水量进行校正;S6,将校正后的时段初蓄水量V0与获得最大发电量对应的时段初蓄水量Vx进行比较,判断两者之间的差值是否满足水库蓄水量变幅约束:若满足,则将校正后的时段初蓄水量V0作为最优时段初蓄水量,进行输出;若不满足,则将校正后的时段初蓄水量作为当前时段初蓄水量,转至步骤S3,重复S3至S6,直至校正后的时段初蓄水量V0满足水库蓄水量变幅约束。2.根据权利要求1所述的方法,其特征是,...
【专利技术属性】
技术研发人员:张高峰,郑浩,李妍,蒲桂林,文沛,
申请(专利权)人:南京南瑞继保电气有限公司,南京南瑞继保工程技术有限公司,