The invention discloses a silty sand layer existing bored pile forming method of foundation. This method is in the foundation in the silty sand, silty sand first expand aperture to the upper part of the pile hole 1.5 meters, and then placed in the drilling pipe wall of silty sand and bentonite loess site, adding in the pile hole to increase the proportion of mud and sand flow to completely stop the activities of the pile hole formed into quicksand, which not only can normal to clean the hole, and will not affect the normal operation of the construction, the construction of the bored pile after good quality. In addition, because the cost of steel pipe wall protection is low, the construction cost will not be substantially increased.
【技术实现步骤摘要】
【技术保护点】
一种地基中存在粉质沙层的钻孔桩成型方法,其特征在于:所述的地基中存在粉质沙层的钻孔桩成型方法包括按顺序进行的下列步骤: 1)在工程现场的地基上待钻孔处埋设孔口护筒(1); 2)利用钻机上的钻杆从孔口护筒(1)处向下垂直钻孔至设计标高,同时灌注泥浆护壁,然后取出钻杆; 3)第一次清孔; 4)当发现上述地基中存在粉质沙层(2)时,测定该粉质沙层(2)的部位及厚度; 5)扩大上部桩孔的孔径至粉质沙层(2)下1.5米; 6)将钢管护壁(3)放入上述上部桩孔的底部而将粉质沙层(2)遮挡住; 7)在桩孔内加入膨润性黄土来增加泥浆的比重,以彻底阻止活动的流砂进入桩孔中; 8)在整个桩孔内安放钢筋笼(4)及导管,然后第二次清孔; 9)最后按照常规的方式测桩孔底沉渣、悬挂隔水栓、灌注水下混凝土、剪断铁丝隔水栓使其下落孔底、连续灌注混凝土的同时上提导管、混凝土灌注完毕,直到混凝土固结即可完成整个钻孔桩成型过程。
【技术特征摘要】
【专利技术属性】
技术研发人员:贾建国,马祥春,李永卿,李自林,石绍立,孔祥阳,恽振波,罗彬,刘振,何震,张志伟,
申请(专利权)人:中铁六局集团有限公司,中铁六局集团天津铁路建设有限公司,天津城市建设学院,
类型:发明
国别省市:11
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。