The present invention relates to the field of civil engineering in a Recyclable composite soil nailing wall pit method, the steps are as follows: in the excavation bottom construction of waterproof curtain (1), then the slope excavation and soil nailing detachable construction (2) and its strong soil nailed wall layer connection (3), complete the combination soil nailing wall pit construction, to the base (4) completed the construction and maintenance, direct the removable nail (2) recovered from the soil, which can eliminate the removable nail (2) on the surrounding area pollution, good environmental performance, saving resources, while the foundation pit slope excavation, water the curtain can be greatly saved (1) and removable nail (2) dosage, and removable nail (2) provides the space construction and demolition, shorten the construction period, the foundation pit engineering Ben greatly reduced.
【技术实现步骤摘要】
【技术保护点】
一种可回收的组合土钉墙基坑围护方法,该可回收的组合土钉墙基坑围护方法包括下述步骤: a)在基坑开挖面底部施工隔水帷幕; b)放坡开挖基坑并施工可拆卸的土钉墙基坑围护; c)将土钉从土体中回收。