The invention discloses a concrete spraying construction method, which includes the following steps: (1) being treated by spraying surface; (2) preparing concrete material; (3) initial spraying concrete, after spraying concrete, is supplied with accelerator, spraying concrete arches and walls first, spraying sequence is adopted, initial spraying thickness is 4 6cm; (4) installing reinforcing steel mesh and installing reinforcing steel mesh after initial spraying, reinforcing steel mesh according to No. The same type of surrounding rock chooses different diameters and grid spacing; (5) double shotcrete, installation of spray layer thickness nail to re spray, the thickness of the compound vault is controlled at 5 6cm, the thickness of the side wall is controlled at 7 10cm, (6) maintenance, and after spraying concrete 2h, the spray surface spray is used for curing, 2 times a day, and 15 15 20 days of continuous maintenance. The invention can effectively reduce springback of shotcrete, improve construction efficiency and construction quality.
【技术实现步骤摘要】
一种混凝土喷射施工方法
本专利技术属于隧道施工
,具体涉及一种混凝土喷射施工方法。
技术介绍
随着我国经济的高速发展,公路和铁路的建设不断增多,随之而来的隧道建设也越来越多,在隧道建设过程中,需要进行混凝土喷射支护,但是现在的混凝土在喷射过程中混凝土回弹率高,造成施工质量和施工效率较低。
技术实现思路
本专利技术所要解决的技术问题便是针对上述现有技术的不足,提供一种混凝土喷射施工方法,它能有效降低喷射混凝土的回弹,提高施工的效率及施工的质量。本专利技术所采用的技术方案是:一种混凝土喷射施工方法,包括以下步骤:(1)受喷面处理,采用高压风水枪冲洗受喷面,冲洗后在受喷面滴水部位埋设导水排管,并在受喷面埋设喷层厚度标钉;(2)配制混凝土料,所述混凝土料包括按重量份计的以下组分:硅酸盐水泥90-120份、粉煤灰30-50份、石粉料10-20份、细骨料20-40份、粗骨料10-20份和水70-80份;(3)初喷混凝土,在混凝土喷出后再供给速凝剂,喷射混凝土先拱后墙,喷射顺序采用先下后上,初喷厚度为4-6cm;(4)安装钢筋网,在初喷后进行钢筋网的安装,钢筋网根据不同的围岩类型选择不同的直径和网格间距;(5)复喷混凝土,安装喷层厚度标钉进行复喷,复喷拱顶厚度控制在5-6cm,边墙厚度控制在7-10cm;(6)养护,喷射混凝土2h后,采用对受喷面喷雾洒水进行养护,每日2次,持续养护15-20天。作为优选,所述混凝土包括按重量份计的硅酸盐水泥100份、粉煤灰40份、石粉料15份、细骨料30份、粗骨料15份和水70份,其中细骨料细度模数大于2.5、含泥量低于3%、泥块含量 ...
【技术保护点】
1.一种混凝土喷射施工方法,其特征在于:包括以下步骤:(1)受喷面处理,采用高压风水枪冲洗受喷面,冲洗后在受喷面滴水部位埋设导水排管,并在受喷面埋设喷层厚度标钉;(2)配制混凝土料,所述混凝土料包括按重量份计的以下组分:硅酸盐水泥90‑120份、粉煤灰30‑50份、石粉料10‑20份、细骨料20‑40份、粗骨料10‑20份和水70‑80份;(3)初喷混凝土,在混凝土喷出后再供给速凝剂,喷射混凝土先拱后墙,喷射顺序采用先下后上,初喷厚度为4‑6cm;(4)安装钢筋网,在初喷后进行钢筋网的安装,钢筋网根据不同的围岩类型选择不同的直径和网格间距;(5)复喷混凝土,安装喷层厚度标钉进行复喷,复喷拱顶厚度控制在5‑6cm,边墙厚度控制在7‑10cm;(6)养护,喷射混凝土2h后,采用对受喷面喷雾洒水进行养护,每日2次,持续养护15‑20天。
【技术特征摘要】
1.一种混凝土喷射施工方法,其特征在于:包括以下步骤:(1)受喷面处理,采用高压风水枪冲洗受喷面,冲洗后在受喷面滴水部位埋设导水排管,并在受喷面埋设喷层厚度标钉;(2)配制混凝土料,所述混凝土料包括按重量份计的以下组分:硅酸盐水泥90-120份、粉煤灰30-50份、石粉料10-20份、细骨料20-40份、粗骨料10-20份和水70-80份;(3)初喷混凝土,在混凝土喷出后再供给速凝剂,喷射混凝土先拱后墙,喷射顺序采用先下后上,初喷厚度为4-6cm;(4)安装钢筋网,在初喷后进行钢筋网的安装,钢筋网根据不同的围岩类型选择不同的直径和网格间距;(5)复喷混凝土,安装喷层厚度标钉进行复喷,复喷拱顶厚度控制在5-6cm,边墙厚度控制在7-10cm;(6)养护,喷射混凝土2h后,采用对受喷面喷雾洒水进行养护,每日2次,持续养护15...
【专利技术属性】
技术研发人员:王明忱,赵红专,厉见秀,闫春红,
申请(专利权)人:华东建工集团有限公司,
类型:发明
国别省市:山东,37