The invention discloses a temporary support device for large circulation roadway tunneling and its method, including a roof-protecting frame and a pillar. The roof-protecting frame is provided with a telescopic support beam, and the support beam of the telescopic structure can change the size according to the size requirement of roadway tunneling, so as to improve the application scope of the invention. The design method of the present invention can design temporary support device according to different roadway dimensions. The temporary support device designed according to this method can continuously use two or more sets of temporary support devices to support the empty roof area of the roadway during the roadway excavation, which not only realizes one-time long-distance excavation, but also solves the problem of low efficiency of roadway excavation caused by frequent alternation of excavation and support processes. At the same time, the temporary support device designed according to this method can not only meet the support requirements of safe operation, but also minimize the labor intensity of workers, which is conducive to the safe operation of workers.
【技术实现步骤摘要】
一种大循环巷道掘进临时支护装置及其方法
本专利技术属于煤矿安全生产
,具体涉及一种大循环巷道掘进临时支护装置。
技术介绍
煤炭是国民经济和社会发展的基础,快速增长的经济对煤炭需求量提出了更高的要求。在巨大的煤炭需求量刺激下,为保证煤炭产量大多数矿井常常会布置两个或两个以上工作面进行煤炭生产。工作面增加的同时,造成承担运输、通风等辅助煤炭生产的掘巷数量相应增加。回采工作面相比于掘巷迎头机械化程度无疑要高得多,往往出现本工作面已采完,下个工作面辅助巷道未完成施工,造成采掘接替紧张,影响煤炭正常生产。针对目前机械化掘巷工艺出现的采掘接替紧张现状,国内外许多学者研究发现影响快速掘进的主要因素在于掘进机截割和巷道支护,二者用时大约占整个施工用时的70%以上。而临时支护作为掘进与支护工序的中间工序,其工序的有效性不仅是实现一次长距离掘进作业的基础,也是掘巷后后续工序能否安全施工的重要保障,成为解决快速掘进问题的关键技术。临时支护问题的解决会大大提高掘进速度,进而解决采掘接替紧张现状。目前,井下掘进工作面所采用的临时支护方式有前探梁支护、“戴帽点柱”支护及“单体+π梁”支 ...
【技术保护点】
1.一种大循环巷道掘进临时支护装置,包括护顶框架和支柱(4),其特征在于:所述护顶框架设有伸缩的支撑横梁(2)。
【技术特征摘要】
1.一种大循环巷道掘进临时支护装置,包括护顶框架和支柱(4),其特征在于:所述护顶框架设有伸缩的支撑横梁(2)。2.根据权利要求1所述的大循环巷道掘进临时支护装置,其特征在于:所述支撑横梁(2),包括伸缩梁(201)和轨道梁(202),在轨道梁(202)的一端内设置有伸缩轨道(2020),伸缩梁(201)的一端滑动安装在伸缩轨道(2020)内并设置有防脱块,防脱块将伸缩梁(201)限位在伸缩轨道(2020)内,伸缩梁(201)的另一端与护顶框架的竖梁(1)固定,轨道梁(202)的另一端与护顶框架的另一竖梁(1)固定。3.根据权利要求2所述的大循环巷道掘进临时支护装置,其特征在于:在伸缩梁(201)和竖梁(1)之间设置有固定梁(203),固定梁(203)的一端固定在竖梁(1),固定梁(203)的另一端与伸缩梁(201)固定连接。4.根据权利要求2或3所述的大循环巷道掘进临时支护装置,其特征在于:在伸缩梁(201)上安装有补位触顶板(204)。5.根据权利要求2或3所述的大循环巷道掘进临时支护装置,其特征在于:在支撑横梁(2)上安装有限位补强控顶夹(3)。6.根据权利要求5所述的大循环巷道掘进临时支护装置,其特征在于:所述限位补强控顶夹(3),包括限位补强夹(301)和补强控顶夹(302),限位补强夹(301)安装在伸缩梁(201)和轨道梁(202)接触处的限位补强孔(205)内,在伸缩梁(201)的限位补强孔(205)内、轨道梁(202)的限位补强孔(205)内均安装有一个补强控顶夹(302)。7.根据权利要求2或3所述的大循环巷道掘进临时支护装置,其特征在于:所述支撑横梁(2)为至少两个,各支撑横梁(2)之间中心对称分布。8.如权利要求1-7中任一所述的大循环巷道掘进临时支护装置的设计方法,其特征在于:步骤如下:S1,确定单个临时支护装置的支护参数;所述支护参数包括支护框架的宽度、长度以及支护区域;S1.1,将掘进巷道锚索在护顶框架上循环排距确定护顶框架宽度;S1.2,根据掘进成巷宽度和掘进机铲板宽度,确...
【专利技术属性】
技术研发人员:张盛,李杰,张旭龙,赵文峰,卞金岭,唐开敏,唐振伟,吴自强,王腾江,
申请(专利权)人:河南理工大学,
类型:发明
国别省市:河南,41