The utility model relates to a semi-continuous process intermediate bridge layout method for Open-pit Coal mines, which is suitable for open-pit coal mines with large mining depth and rich inner drainage space. The crushing station is set in the groove and the middle bridge is arranged at the bottom of the pit. The middle bridge has the upper step and the lower step. The upper step is the same level as the roof of the coal seam. The crushing station is connected with the belt conveyor and is distributed in the broken line section of the inner dump. A lifting belt conveyor is installed, and the dump in the open pit is dislocated. One end of the lifting belt conveyor is connected with the bottom belt conveyor. The connecting conveyor is arranged at the broken line section near the inner dump. The other end of the lifting belt conveyor is connected with the connecting conveyor. It is connected with the ground belt conveyor. It effectively reduces the interaction between truck and semi-continuous process system, improves the stability of mine production, and has obvious economic benefits.
【技术实现步骤摘要】
一种露天煤矿半连续工艺中间桥布置方式
本专利技术涉及一种露天煤矿半连续工艺中间桥布置方式,尤其适用开采深度较大、内排容量富裕的露天煤矿,属于矿业开采工艺领域。
技术介绍
半连续工艺是介于间断工艺与连续工艺之间的一种露天煤矿开采工艺,该工艺采用卡车、破碎站与带式输送机相结合,带式输送机运输代替部分卡车运输,具有间断工艺的灵活,同时又具有连续工艺生产成本低等特点。中间桥是在露天煤矿坑底构筑的连接内排土场与剥离工作面之间的运输道路,运输卡车通过中间桥运输原煤与部分剥离物,减少运输距离,降低运输成本。内排是指露天煤矿开采过程中,将剥离物回填至前期开采的采空区内的一种排土方式,内排随着露天煤矿的不断开采而持续发生,内排土场的工作平盘不断被掩埋又不断产生,为移动式露天边帮。目前,半连续工艺布置主要考虑系统稳定性以及与其他生产要素之间的相互影响,因此多将破碎站和带式输送机安装到露天矿地表或者近地表。对于没有实现内排的露天煤矿,有时也将破碎站及带式输送机布置在非工作帮,减少与其他设备之间的相互影响。对于有内排的露天煤矿而言,如将系统布置于移动帮如内排土场或剥离台阶时,移动帮卡车走行与带式输送机存在交叉运行的弊端,同时,带式输送机的布置将影响移动帮正常推进,制约露天煤矿的剥离或内排,增加剥离物的内排运距。因此目前国内内排露天煤矿大都采用沿端帮布置提升带式输送机的方式,但即使如此提升带式输送机与端帮路之间仍存在交叉,严重影响端帮卡车运输,增加了剥离物的内排运输距离,同时,带式输送机移设时,提升带式输送机无法实现平行移动,需要将全部提升带式输送机机架拆除后移设至指定地点,重新进 ...
【技术保护点】
1.一种露天煤矿半连续工艺中间桥布置方式,包括破碎站(6)、坑底带式输送机(7)、提升带式输送机(9)、联络带式输送机(10)和地面带式输送机(11);其特征在于步骤如下:在露天煤矿最上一个采煤台阶(3)平台上的左侧端帮(201)和右侧端帮(202)连线中点处下挖形成凹槽,将破碎站(6)设置在凹槽内,破碎站(6)包括破碎站入料口(601)和破碎站出料口(602),破碎站入料口(601)与煤层顶板同一水平面;在露天煤矿的坑底布置中间桥,所述坑底中间桥由露天矿剥离的岩石在露天矿坑底堆砌形成的连通露天矿采煤台阶(3)与内排土场(1)的运输通道构成,中间桥设置为上下两层台阶,分别为中间桥上层台阶(4)与中间桥下层台阶(5),其中中间桥上层台阶(4)与煤层顶板位于同一水平,服务于剥离物内排;带式输送机(7)沿露天矿推进方向布置在坑底中间桥下层台阶(5)上,破碎站出料口(602)与带式输送机(7)连接,在内排土场折线段(8)内布置提升带式输送机(9),内排土场折线段(8)为由于同一内排台阶推进不同步而造成的露天矿内排土场错位位置,提升带式输送机(9)一端与坑底带式输送机(7)连接,联络输送机(10 ...
【技术特征摘要】
1.一种露天煤矿半连续工艺中间桥布置方式,包括破碎站(6)、坑底带式输送机(7)、提升带式输送机(9)、联络带式输送机(10)和地面带式输送机(11);其特征在于步骤如下:在露天煤矿最上一个采煤台阶(3)平台上的左侧端帮(201)和右侧端帮(202)连线中点处下挖形成凹槽,将破碎站(6)设置在凹槽内,破碎站(6)包括破碎站入料口(601)和破碎站出料口(602),破碎站入料口(601)与煤层顶板同一水平面;在露天煤矿的坑底布置中间桥,所述坑底中间桥由露天矿剥离的岩石在露天矿坑底堆砌形成的连通露天矿采煤台阶(3)与内排土场(1)的运输通道构成,中间桥设置为上下两层台阶,分别为中间桥上层台阶(4)与中间桥下层台阶(5),其中中间桥上层台阶(4)与煤层顶板位于同一水平,服务于剥离物内排;带式输送机(7)沿露天矿推进方向布置在坑底中间桥下层台阶(5)上,破碎站出料口(602)与带式输送机(7)连接,在内排土场折线段(8)内布置提升带式输送机(9),内排土场折线段(8)为由于同一内排台阶推进不同步而造成的露天矿内排土场错位位置,提升带式输送机(9)一端与坑底带式输送机(7)连接,联络输送机(10)布置在地表靠近内排土场折线段(8)处,沿露天矿推进方向,提升带式输送机(9)另一端与联络输送机(10)连接,地面带式输送机(11)布置于地表,联络输送机(10)与地面带式输送机(11)连接,地面带式输送机(11)将煤炭运输至地面其他位置。2.根据权利要求1所述的露天煤矿半连续工艺中间桥布置方式,其特征在于:中间桥上层台阶(4)的宽度为40m,便于露天矿卡车运输通行,中间桥上层台阶(4)两侧靠近台阶坡顶线处设有岩土堆砌高度为1.5m的卡车安全挡墙(401)。3.根据权利要求1所述的露天煤矿半连续工艺中间桥布置方式,其特征在于:所述中间桥下层台阶(5)与凹槽底面水平齐平,中间桥下层台阶(5)宽度设为Bx,中间桥下层台阶(5)中并排设有人工基础(701)和检修车道,人工基础(701)上设有坑底带式输送机(7),人工基础(701)为混凝土浇筑的高度为20cm的地基,中间桥下层台阶(5)靠近台阶坡顶线处利...
【专利技术属性】
技术研发人员:陈树召,才庆祥,杨猛,尚涛,韩流,陆翔,
申请(专利权)人:中国矿业大学,
类型:发明
国别省市:江苏,32
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。