The invention relates to a grouting material plumpness detection method and device, preferably a grouting material plumpness detection method and device in a precast concrete member, using a resistance measuring device to measure the electrical resistance between the upper and lower out of the grouting joint and the grouting material in the grouting joint, and the measurement results are at the predetermined resistance value. At the next time, it is considered that the grouting material of the joint is full, if the measured result is greater than the predetermined resistance value, the grouting material and the grouting pipe in the joint are not continuous, that is, the filling of the joint is not in conformity with the quality requirement. The invention has no damage to any part of the precast concrete component, and the method is simple, practical and fast and reliable. It can solve the problem of nondestructive testing and judging of the filling material plumpness of the vertical reinforcing bar grouting connection joint in the prefabricated concrete structure and the precast wall.
【技术实现步骤摘要】
一种灌浆料饱满度检测方法和装置
本专利技术涉及一种灌浆料饱满度检测方法和装置,特别涉及一种制混凝土构件内灌浆接头的灌浆料饱满度检测方法和装置,用于装配式混凝土结构预制柱、预制墙内的竖向钢筋套筒灌浆连接接头及约束浆锚搭接接头的灌浆料饱满度的检测方法,采用本专利技术操作简单、方便、快速、高效、成本低,优于已有的灌浆接头灌浆料饱满度的无损检测方法。
技术介绍
套筒灌浆连接是装配式混凝土结构建筑竖向预制构件纵向受力钢筋的主要连接方法,灌浆连接质量是影响建筑安全的关键点。国家行业标准《钢筋连接用灌浆套筒》JG/T398规定了对灌浆套筒结构和材料的要求,《装配式混凝土结构技术规程》JGJ1、《钢筋套筒灌浆连接应用技术规程》JGJ355对钢筋灌浆套筒连接方法的应用和验收做出了明确的规定。采用预埋灌浆套筒连接的预制混凝土构件生产时,构件的纵向连接钢筋与灌浆套筒一端采用机械连接方法连接在一起,或是连接钢筋插入套筒预制端的灌浆连接腔内,套筒置于预制混凝土构件底部位置靠近并固定在构件边模板上,套筒侧壁上部位置所设用于排气和灌浆料流出的出浆孔以及下部靠近预制构件底部所设的用于向套筒内灌浆 ...
【技术保护点】
一种灌浆料饱满度检测方法,优选为一种预制混凝土构件内竖向钢筋套筒灌浆接头的灌浆料饱满度检测方法,使用电阻测量装置(1),测量预制混凝土构件(13)表面的出浆管孔(5)和灌浆管孔(6)内的灌浆料(12)之间的电阻值,如测量结果在预定电阻值以下时,则认为该套筒灌浆接头的灌浆料饱满,如测量结果大于预定电阻值时,则认为套筒灌浆接头的灌浆料饱满度不符合质量要求。优选,所述方法的具体步骤如下:(1)预制混凝土构件(13)内的套筒(4)灌浆结束后,预制混凝土构件(13)表面的出浆管孔(5)和灌浆管孔(6)均以封堵件(16)封堵,在灌浆料(12)初凝后的一段时间内,取下出浆管孔(5)和灌浆 ...
【技术特征摘要】
1.一种灌浆料饱满度检测方法,优选为一种预制混凝土构件内竖向钢筋套筒灌浆接头的灌浆料饱满度检测方法,使用电阻测量装置(1),测量预制混凝土构件(13)表面的出浆管孔(5)和灌浆管孔(6)内的灌浆料(12)之间的电阻值,如测量结果在预定电阻值以下时,则认为该套筒灌浆接头的灌浆料饱满,如测量结果大于预定电阻值时,则认为套筒灌浆接头的灌浆料饱满度不符合质量要求。优选,所述方法的具体步骤如下:(1)预制混凝土构件(13)内的套筒(4)灌浆结束后,预制混凝土构件(13)表面的出浆管孔(5)和灌浆管孔(6)均以封堵件(16)封堵,在灌浆料(12)初凝后的一段时间内,取下出浆管孔(5)和灌浆管孔(6)内的封堵件(16);(2)使用电阻测量装置(1),将电阻测量装置(1)的两极测量线(2)的测头(3)分别与同一套筒灌浆接头联通到所述出浆管孔(5)和灌浆管孔(6)内的灌浆料(12)的表面接触,在两极的测量线(2)测头与所述同一套筒灌浆接头的出浆管孔(5)和灌浆管孔(6)内硬化的灌浆料(12)表面同时接触的条件下,启动电阻测量装置(1)进行电阻测量,如测量结果在预定电阻值以下时,则认为该套筒灌浆接头的灌浆料饱满,如测量结果大于预定电阻值时,则判断该套筒灌浆接头内灌浆料(12)不连续或不饱满,即该套筒灌浆接头的灌浆料饱满度不符合质量要求。优选,预制混凝土构件(13)内设置有竖向钢筋套筒灌浆接头,竖向钢筋套筒灌浆接头包括套筒(4)、连接钢筋(11)、出浆管(9)和灌浆管(10);连接钢筋(11)部分位于套筒(4)内,套筒(4)上部设置有出浆孔(7),套筒(4)下部设置有灌浆孔(8),出浆管(9)和灌浆管(10)分别具有出浆管孔(5)和灌浆管孔(6),出浆管孔(5)位于预制混凝土构件(13)表面上部,灌浆管孔(6)位于预制混凝土构件(13)表面下部,出浆管(9)伸入到预制混凝土构件(13)内并联通套筒(4)上部的出浆孔(7),灌浆管(10)伸入到预制混凝土构件(13)内并联通套筒(4)下部的灌浆孔(8),从灌浆管(10)向套筒内灌入灌浆料(12),以使灌浆料(12)分布于灌浆管(10)、套筒(4)和出浆管(9)内。2.一种灌浆料饱满度检测方法,优选为一种预制混凝土构件内竖向钢筋套筒灌浆接头的灌浆料饱满度检测方法,再次优选为一种预制混凝土构件(13)内只设有出浆孔(7)的竖向钢筋套筒灌浆接头的灌浆料饱满度检测方法,使用电阻测量装置,测量预制混凝土构件(13)表面的出浆管孔(5)内的灌浆料(12)和该套筒灌浆接头底部灌浆料(12)所联通的金属导线(23)之间的电阻值,测量结果在预定电阻值以下时,则认为该套筒灌浆接头的灌浆料饱满,如测量结果大于预定电阻值时,则认为该套筒灌浆接头的灌浆料饱满度不符合质量要求。优选,所述方法的具体步骤如下:(1)预制混凝土构件(13)内预埋的竖向钢筋套筒灌浆接头采用了只设有出浆孔(7)的套筒(4),在灌浆连接施工前,用联通腔密封材料(18)将预制混凝土构件底部水平缝周圈进行密封时,在只有出浆孔(7)的套筒(4)下方预先埋设金属导线(23),金属导线(23)一端设在联通腔内并靠近套筒(4)底部,且与连接钢筋(11)不接触,金属导线(23)的另一端设在联通腔密封材料(18)外,套筒灌浆连接施工时,预制混凝土构件表面的出浆管孔(5)以封堵件(16)封堵,在灌浆料(12)初凝后的一段时间内,取下出浆管孔(5)的封堵件(16);(2)使用电阻测量装置(1),将电阻测量装置(1)的两极测量线(2)测头分别与套筒(4)的上部联通到所述出浆管孔(5)内的灌浆料表面以及所述金属导线(23)接触,在两极的测量线测头与出浆管孔(5)内硬化的灌浆料表面和该套筒底部联通的金属导线(23)的另一端同时接触的条件下,启动电阻测量装置(1)进行电阻测量,测量结果在预定电阻值以下时,则认为该套筒灌浆接头的灌浆料饱满,如测量结果大于预定电阻值时,则判断该套筒灌浆接头内灌浆料(12)不连续或不饱满,即该套筒灌浆接头的灌浆料饱满度不符合质量要求。优选,预制混凝土构件(13)内预埋只设有出浆孔(7)的套筒(4);套筒(4)位于预制混凝土构件(13)的左、右两侧,或者套筒(4)沿着预制混凝土构件(13)周圈分布周圈;在预制混凝土构件(13)的上部并且套筒(4)之间设置有集中灌浆孔道(22),或者在预制混凝土构件(13)下部的联通腔处设置有集中灌浆孔道(22),所述集中灌浆孔道(22)联通所述联通腔,联通腔位于套筒(4)的底部,联通腔采用联通腔密封材料(18)密封。优选,竖向钢筋套筒灌浆接头设置在预制混凝土构件(13)左、右两侧,或者竖向钢筋套筒灌浆接头沿着预制混凝土构件(13)周圈分布。优选,集中灌浆孔道(22)位于预制混凝土构件(13)的上部,并且位于竖向钢筋套筒灌浆接头之间。优选,每个竖向钢筋套筒灌浆接头包括套筒(4)、连接钢筋(11)和出浆管(9);连接钢筋(11)部分位于套筒(4)内,套筒(4)上部设置有出浆孔(7),套筒(4)底部联通联通腔,出浆管(9)具有出浆管孔(5),出浆管孔(5)位于预制混凝土构件(13)表面上部,出浆管(9)伸入到预制混凝土构件(13)内并联通套筒(4)上部的出浆孔(7),从灌浆孔道(22)内灌入灌浆料(12),灌浆料(12)沿着集中灌浆孔道(22)进入联通腔,并从套筒(4)底部的开口进入到套筒内,并使灌浆料(12)分布于联通腔、套筒(4)和出浆管(9)内。3.一种灌浆料饱满度检测方法,优选为一种预制混凝土构件内竖向钢筋约束浆锚搭接接头的灌浆料饱满度检测方法,使用电阻测量装置,测量所述竖向钢筋约束浆锚搭接接头的出浆管孔(5)和灌浆管孔(6)内的灌浆料(12)之间的电阻值,测量结果在预定电阻值以下时,则认为该约束浆锚搭接接头的灌浆料饱满,如测量结果大于预定电阻值时,则认为该约束浆锚搭接接头的灌浆料饱满度不符合质量要求。优选,所述方法的具体步骤如下:(1)预制混凝土构件内的竖向钢筋约束浆锚搭接接头灌浆结束,所述约束浆锚搭接接头上部出浆管孔(5)和下部灌浆管孔(10)均以封堵件(16)封堵,在灌浆料初凝后的一段时间内,取下上部出浆管孔(5)和下部灌浆管孔(10)的封堵件(16);(2)使用电阻测量装置(1),将电阻测量装置(1)的两极测量线测头分别与同一钢筋约束浆锚搭接接头的上部出浆管孔(5)和下部灌浆管孔(10)的灌浆料(12)表面接触,在两极的测量线测头与约束浆锚搭接接头的上部出浆管孔(5)和下部灌浆管孔(10)内硬化的灌浆料(12)表面同时接触的条件下,启动电阻测量装置(1)进行电阻测量,测量结果在预定电阻值以下时,则认为该约束浆锚搭接接头的灌浆料饱满,如测量结果大于预定电阻值时,则判断该约束浆锚搭接接头内灌浆料(12)不连续,即该浆锚搭接接头的灌浆料饱满度不符合质量要求。优选,预制混凝土构件(13)内设置有竖向钢筋约束浆锚搭接接头,竖向钢筋约束浆锚搭接接头包括约束钢筋(24)、预留孔道(25)、上部搭接连接钢筋(26)、下部搭接连接钢筋(26);下部搭接连接钢筋(26)部分位于预留孔道(25)内,并与上部搭接连接钢筋(26)部分重叠;约束钢筋(24)分别位于搭接连接钢筋(26)重叠部分的外围,预留孔道(25)上部接头出浆孔(7)和下部接头灌浆孔(8)分别连接出浆管(9)和灌浆管(10),出浆管(9)和灌浆管(10)分别具有出浆管孔(5)和灌浆管孔(6),出浆管(9)伸入到预制混凝土构件(13)内并联通预留孔道(25),灌浆管(10)伸入到预制混凝土构件(13)内并联通预留孔道(25),从灌浆管(10)向预留孔道(25)内灌入灌浆料(12),以使灌浆料(12)分布于灌浆管(10)、预留孔道(25)和出浆管(9)内。4.一种灌浆料饱满度检测装置,优选为一种预制混凝土构件内竖向钢筋套筒灌浆接头的灌浆料饱满度检测装置,其包括电阻测量装置(1),电阻测量装置(1)具有测量线(2),电阻测量装置(1)的两极测量线(2)测头分别与预制混凝土构件(13)表面的出浆管孔(5)和灌浆管孔(6)内的灌浆料(12)表面连接,测量预制混凝土构件(13)表面的出浆管孔(5)和灌浆管孔(6)内的灌浆料(12)之间的电阻值,如测量结果在预定电阻值以下时,则认为该套筒灌浆接头的灌浆料饱满,如测量结果大于预定电阻值...
【专利技术属性】
技术研发人员:钱冠龙,朱清华,王爱军,郝志强,郝敏,谢松,郭耀斌,程亮,赵思远,郭学友,
申请(专利权)人:中冶建筑研究总院有限公司,北京思达建茂科技发展有限公司,北京思达建茂科技发展有限公司天津分公司,
类型:发明
国别省市:北京,11