A temporary support structure for deep foundation pit construction, including steel beam and supporting pile, the supporting pile set in the deep foundation pit is fixed with steel beam braces on the corresponding position of the main structure of the corresponding floor, one end of the steel beam is fixed on the steel beam bracket and the other end is parallel to the main structure of the floor and the main floor body. A gap is formed between the end part of the steel beam and the supporting pile, and a high strength grouting material layer is filled in the gap. The utility model can solve the technical problems that the operation space is small and the connection and conversion of the post construction phase is complex during the construction of the construction project. Moreover, the structure is easy to install, low in cost, simple in structure, reliable in performance, efficiency, green and environmental protection, so that it can be widely used.
【技术实现步骤摘要】
一种深基坑工程分仓施工临时支撑结构
本技术涉及一种深基坑工程分仓施工临时支撑结构。
技术介绍
传统分仓施工换撑做法是回填土或采用混凝土支顶围护结构,而如果二期施工时间与一期间隔时间较短,且主体结构与维护结构之间缝隙较小,回填土无法满足现场要求,而混凝土支顶容易造成以下问题:(1)操作空间较小,模板支设模板时施工难度较大,模板拆除后材料无法回收利用,造成浪费。(2)混凝土支顶结构施工工艺复杂,施工周期较长,施工效率低。(3)二期施工时混凝土结构需要剔除,产生建筑垃圾,污染环境。
技术实现思路
本技术的目的在于提供一种能有效节约工期、又满足现场换撑施工要求、同时节能环保的深基坑工程分仓施工临时支撑结构。为实现上述目的采用以下技术方案:一种深基坑工程分仓施工临时支撑结构,包括钢梁和支护桩,设置在深基坑内的所述支护桩在相应楼层所在主体结构对应位置上固定有钢梁托板,所述钢梁的一端固定在钢梁托板上,另一端平行伸入楼层主体结构内与楼层主体结构内钢筋焊接,所述钢梁的端部与支护桩之间设有间隙,所述间隙内填充有高强灌浆料层。采用上述结构,钢梁在主体楼板底层钢筋绑扎完成后即可直接安装,操作简便 ...
【技术保护点】
一种深基坑工程分仓施工临时支撑结构,包括钢梁和支护桩,其特征在于:设置在深基坑内的所述支护桩在相应楼层所在主体结构对应位置上固定有钢梁托板,所述钢梁的一端固定在钢梁托板上,另一端平行伸入楼层主体结构内与楼层主体结构内钢筋焊接,所述钢梁的端部与支护桩之间设有间隙,所述间隙内填充有高强灌浆料形成高强灌浆料层。
【技术特征摘要】
1.一种深基坑工程分仓施工临时支撑结构,包括钢梁和支护桩,其特征在于:设置在深基坑内的所述支护桩在相应楼层所在主体结构对应位置上固定有钢梁托板,所述钢梁的一端固定在钢梁托板上,另一端平行伸入楼层主体结构内与楼层主体结构内钢筋焊接,所述钢梁的端部与支护桩之间设有间隙,所述间隙内填充有高...
【专利技术属性】
技术研发人员:颜勇,冉旺盛,康伟,曾波,
申请(专利权)人:中建五局第三建设有限公司,
类型:新型
国别省市:湖南,43