The present invention relates to the field of shield construction, in particular to a high pressure soft soil layer HFE combined shield method, solve the high pressure under the condition of soft soil shield machine originating receiving technical problems, including the following steps: in accordance with the design drawings and construction requirements of grouting reinforcement; construction of freezing pipes and temperature measuring hole, laying temperature line. Freezing equipment and pipeline installation and debugging after the start of freezing freezing; shield; portal steel ring bolted external external steel ring device; shield the completion of the preparatory work and freezing after breaking envelope; shield jacking forward; shield machine surface pressure; excavation within the outline of the freezing tube removed, the rest of the tube continue to work was frozen frozen; the external steel ring device Wailimian welding arc plate, when the shield machine completely into the external steel ring device after the start of synchronous grouting, excavation was completed In. The invention is especially suitable for the soft soil stratum with high water head, large water quantity and no initial precipitation conditions, and the prospect of popularization is good.
【技术实现步骤摘要】
一种高水压软土地层HFE组合式盾构始发方法
本专利技术涉及盾构施工领域,具体为一种高水压软土地层HFE组合式盾构始发方法。
技术介绍
近年来我国轨道交通迅猛发展,各地纷纷选择这种清洁、舒适、快捷的大运量运输工具解决城市拥堵问题,截止2015年底,全国共26个城市轨道交通开通运营,44个城市轨道交通规划获批,规划线路规模庞大、建设项目繁多,盾构法以其安全、高效、适应性强的特点成为最为常用的一种区间隧道施工方法。随着盾构施工技术的成熟和施工经验的积累,其安全性能逐渐提高,但盾构始发与接收依旧是盾构施工的最大风险点,历年来盾构始发接收事故层出不穷,严重的甚至淹没盾构机及车站、区间,造成极大经济损失,危及人员安全,在临江富水软土区域,地下水位高,地下孔隙水丰富,围岩土体的自稳能力差,且软土刀盘不具备地下连续墙破除能力,需要人工破除洞门地下连续墙,始发及接收风险尤为突出。
技术实现思路
为了解决高水压情况下软土地层盾构机始发接收技术难题,本专利技术提供了一种工艺简单、方法新颖、技术先进、安全性能高的高水压软土地层组合式盾构始发方法。适用于富水地层的盾构始发,尤其是在水头高、水量大、不具备始发降水条件的软土地层中优势尤为明显,通过对传统加固方式和洞门密封防水装置进行优化组合,利用高压旋喷(Highpressurejetgroutingpile)桩加强地层自稳性、减少侧向水土压力;利用冷冻法(Freezingmethod)隔绝地下水、确保洞门破除安全;利用洞门外接钢环装置(Theexternalring)在盾构始发时密封止水,减小盾构始发及接收风险,形成多道防线,优势互补, ...
【技术保护点】
一种高水压软土地层HFE组合式盾构始发方法,其特征在于,包括如下步骤:S1、根据水文地质情况及水土压力计算对盾构机外侧3米范围内进行高压旋喷加固(1);S2、施工冻结管(7)及测温孔(8),布设测温线,冻结设备及冻结管路安装调试完毕后开始冻结;S3、对已加固的端头土体进行检查,确保地基承载力满足起吊设备施工安全后开始盾构机组装,同时完成反力支撑并开始拼装负环管片后做好盾构始发准备;S4、在泥水盾构始发时,需在车站主体洞门钢环外用螺栓连接外接钢环装置车站主体洞门(9)钢环外部用螺栓连接外接钢环装置(3);S5、盾构始发准备工作完成并冻结加固(2)达到设计效果且保持稳定后,破除洞门围护结构(4);S6、为确保密封效果及缩短建压时间,洞门破除完毕并清理完成后在外接钢环装置(3)形成的密闭腔体内涂抹润滑密封油脂;S7、外接钢环装置(3)润滑油脂涂抹完成后继续拼装负环,将盾构机(6)向前顶进,盾构机(6)进入洞门前,在刀盘外围和帘布橡胶板外侧涂润滑油,以免盾构机(6)刀盘挂破帘布橡胶板影响密封效果,同时为确保冻结管安全,将盾构机(6)向前移动至冻结体前20cm的位置停止顶进;S8、当盾构机(6) ...
【技术特征摘要】
1.一种高水压软土地层HFE组合式盾构始发方法,其特征在于,包括如下步骤:S1、根据水文地质情况及水土压力计算对盾构机外侧3米范围内进行高压旋喷加固(1);S2、施工冻结管(7)及测温孔(8),布设测温线,冻结设备及冻结管路安装调试完毕后开始冻结;S3、对已加固的端头土体进行检查,确保地基承载力满足起吊设备施工安全后开始盾构机组装,同时完成反力支撑并开始拼装负环管片后做好盾构始发准备;S4、在泥水盾构始发时,需在车站主体洞门钢环外用螺栓连接外接钢环装置车站主体洞门(9)钢环外部用螺栓连接外接钢环装置(3);S5、盾构始发准备工作完成并冻结加固(2)达到设计效果且保持稳定后,破除洞门围护结构(4);S6、为确保密封效果及缩短建压时间,洞门破除完毕并清理完成后在外接钢环装置(3)形成的密闭腔体内涂抹润滑密封油脂;S7、外接钢环装置(3)润滑油脂涂抹完成后继续拼装负环,将盾构机(6)向前顶进,盾构机(6)进入洞门前,在刀盘外围和帘布橡胶板外侧涂润滑油,以免盾构机(6)刀盘挂破帘布橡胶板影响密封效果,同时为确保冻结管安全,将盾构机(6)向前移动至冻结体前20cm的位置停止顶进;S8、当盾构机(6)推进到预定位置后对其工作面建压;S9、当盾构机(6)泥水压力建立并确保外接钢环装置(3)密封效果后,对掘进轮廓内冻结管(7)拔除,其余冻结管(7)继续工作施冻;S10、盾构机(6)始发阶段掘进应缓慢稳步前进,推进速度控制在不超过10mm/min,当掘进至盾体全部进入外接钢环装置(3),盾尾边缘比外接钢环装置(3)外立面略微靠前,外接钢环装置(3)洞圈刷(14)与止浆板(10)相交但尚未脱离前暂停掘进;S11、当盾构机(6)盾尾完全进入洞门后,橡胶止水布帘及压板和管片外壁接触时,在盾尾进入外接钢环装置(3)后在外接钢环装置(3)外立面焊接一圈弧形板(11),将外接钢环装置(3)与管片间间隙进行封堵;S12、继续将盾构机缓慢向前推进,当盾构机完全进入外接钢环装置(3)并脱离盾尾1~2环后开始同步注浆;S13、盾构机(6)盾体全部进入洞门钢环并完成洞门加强注浆后逐渐提高切口水压至理论计算值,完成始发掘进,停止冻结站运转,拔除剩余冻结管(7),进入正常掘进施工。2.根据权利要求1所述的一种高水压软土地层HFE组合式盾构始发方法,其特征在于,步骤S8中盾构机(6)工作面建压,是指外接钢环装置(3)密闭腔油脂注入后,进行盾构机的泥水建压。3.根据权利要求1或2所述的一种高水压软土地层HFE组合式盾构始发方法,其特征在于,步骤S9或步骤S13中冻结管(7)拔除包含以下内容:A、在盐水箱中安装总功率为100~150...
【专利技术属性】
技术研发人员:王海,乔国强,郭波,张利强,安向阳,赵香萍,李晓,
申请(专利权)人:中铁十二局集团有限公司,中铁十二局集团第二工程有限公司,
类型:发明
国别省市:山西,14