The utility model provides a steel beam column, the steel structure beam column comprises a first plate, second plates and connected with the first plate and two steel plate third, and the first steel plate, second rod and three steel plate forming cylinder cross section is I-shaped shape. Also includes at least one group is positioned on the third side of the steel cable-stayed board, the group of cable-stayed board includes two cross arranged inclined pull plate, welding connection at both ends and each cable-stayed plate with the first plate and two side plates, each plate is close to the first steel cable-stayed connecting plate and the third steel plate welding. The beneficial effect of the utility model is that the structure strength of the beam and column is enhanced by a set of cable-stayed plates.
【技术实现步骤摘要】
一种钢结构梁柱
本技术涉及到钢结构
,尤其涉及到一种钢结构梁柱。
技术介绍
钢材的轻质高强度优点使得钢结构广泛应用于建筑行业,尤其是大跨度的机场航站楼、会展中心、体育场馆以及超高层建筑中。随着我国综合国力的提高和钢产量及钢材冶炼技术的飞速发展,大量钢结构建筑在全国各地兴建。现有的钢结构支架主要是用于建筑物上的梁柱,其大多采用“工”字结构,即由两横向平板为上下主筋,中间纵向竖板为支撑腹板构成,其抗弯强度很一般。故这种“工”字形梁柱在使用过程中横板容易弯曲变形,梁柱整体容易移位,造成整个建筑物的不稳定。如果想解决此问题,可以通过加厚钢板的厚度来解决,但此种方法一则耗材,另则会加重整体建筑物的重量,给地基带来压力。
技术实现思路
本技术的目的是为了克服现有技术的不足,提供了一种钢结构梁柱。本技术是通过以下技术方案实现:本技术提供了一种钢结构梁柱,该钢结构梁柱包括:第一钢板、第二钢板以及分别与所述第一钢板及第二钢板连接的第三钢板,且所述第一钢板、第二杆体及第三钢板形成横截面为“工”字形的柱体,还包括至少一组位于所述第三钢板一侧的斜拉板,所述一组斜拉板包括两个交叉设置的斜拉板,且每个斜拉板的两端与所述第一钢板及第二钢板焊接连接,每个斜拉板靠近所述第三钢板的一侧与所述第三钢板焊接连接。优选的,每个斜拉板与所述第三钢板焊接处还焊接有角钢,且所述角钢分别与所述斜拉板及所述第三钢板焊接连接。优选的,所述第三钢板的两侧分别设置有一组所述的斜拉板。本技术的有益效果是:通过设置的一组斜拉板增强了梁柱的结构强度。附图说明图1是本技术实施例提供的钢结构梁柱的结构示意图。具体实施方式为了 ...
【技术保护点】
一种钢结构梁柱,其特征在于,包括:第一钢板、第二钢板以及分别与所述第一钢板及第二钢板连接的第三钢板,且所述第一钢板、第二杆体及第三钢板形成横截面为“工”字形的柱体,还包括至少一组位于所述第三钢板一侧的斜拉板,所述一组斜拉板包括两个交叉设置的斜拉板,且每个斜拉板的两端与所述第一钢板及第二钢板焊接连接,每个斜拉板靠近所述第三钢板的一侧与所述第三钢板焊接连接。
【技术特征摘要】
1.一种钢结构梁柱,其特征在于,包括:第一钢板、第二钢板以及分别与所述第一钢板及第二钢板连接的第三钢板,且所述第一钢板、第二杆体及第三钢板形成横截面为“工”字形的柱体,还包括至少一组位于所述第三钢板一侧的斜拉板,所述一组斜拉板包括两个交叉设置的斜拉板,且每个斜拉板的两端与所述第一钢板及第二钢板焊接...
【专利技术属性】
技术研发人员:郑明道,李桁,应宗国,
申请(专利权)人:安徽天澄钢构有限公司,
类型:新型
国别省市:安徽,34
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。