The utility model provides a bolt assembly integral node, including the first precast concrete beams, second precast concrete beams and precast columns, precast columns, precast slab, precast laminated layer, bolt node, cast-in-place joints, precast concrete beam in cast-in-situ joint area is located at the left and right ends of the precast column in node area of the upper and lower ends of precast slab in precast concrete beam top precast beam laminated layer is located in the upper panels; upper and lower precast columns connected by bolt bolt node node, which comprises a base, a side plate, longitudinal reinforcement, curved steel, steel bar, connecting nut, side plate welded to the base around the lower end of the longitudinal steel the upper part of the inner side plate and welding in cast node area, bent bar is welded on the outer side of the lower part of side plate reinforced connection, extending from the top of the column and the base of precast, fixed by nut. The utility model has the advantages of convenient construction, controllable quality, short site assembling time and reliable force.
【技术实现步骤摘要】
一种螺栓连接装配整体式节点
本技术涉及建筑结构领域,尤其涉及一种螺栓连接装配整体式节点。
技术介绍
预制混凝土框架具有现场湿作业少、构件质量好、节省模板和支撑、环境污染小等优点,而预制混凝土框架结构的整体性能很大程度上依赖于其节点性能的优劣;目前,预制混凝土框架中柱纵筋常采用套筒灌浆连接、浆锚搭接连接及螺栓连接等方式连接,套筒灌浆连接、浆锚搭接连接施工流程要求严格、质量难以控制且不易检测,现有螺栓连接构造简单,但便捷性一般,且节点受力性能难以达到要求。
技术实现思路
为了解决上述问题,本技术提供了一种用新型螺栓系统连接装配整体式节点。本技术所提供的技术方案是:一种螺栓连接装配整体式节点,包括第一预制混凝土梁1、第二预制混凝土梁2、上预制柱3、下预制柱4、预制板5、预制梁叠合层6、螺栓节点7、现浇节点区8;所述第一预制混凝土梁1位于现浇节点区8左端,第二预制混凝土梁2位于现浇节点区8右端,上预制柱3位于现浇节点区8上端,下预制柱4位于现浇节点区8下端,预制板5位于第一预制混凝土梁1、第二预制混凝土梁2上端,预制梁叠合层6位于预制板5上端;所述上预制柱3与下预制柱4之间通过螺栓节点7连接。所述螺栓节点7包括底座9、边板10、纵向钢筋11、弯起钢筋12、连接钢筋13、螺母14,所述底座9中间开有圆孔,用于连接钢筋13通过,所述连接钢筋13顶部制有螺纹,所述边板10焊接于底座9周围,所述纵向钢筋11、弯起钢筋12与上预制柱3一体预制,纵向钢筋11下端伸出上预制柱3在现浇节点区8内与边板10内侧上部焊接,弯起钢筋12焊接于边板10外侧下部,所述连接钢筋13与下预制柱4一体预 ...
【技术保护点】
一种螺栓连接装配整体式节点,包括第一预制混凝土梁(1)、第二预制混凝土梁(2)、上预制柱(3)、下预制柱(4)、预制板(5)、预制梁叠合层(6)、现浇节点区(8),其特征在于:还包括螺栓节点(7),所述第一预制混凝土梁(1)位于现浇节点区(8)左端,第二预制混凝土梁(2)位于现浇节点区(8)右端,上预制柱(3)位于现浇节点区(8)上端,下预制柱(4)位于现浇节点区(8)下端,预制板(5)位于第一预制混凝土梁(1)、第二预制混凝土梁(2)上端,预制梁叠合层(6)位于预制板(5)上端,所述上预制柱(3)与下预制柱(4)之间通过螺栓节点(7)连接;所述螺栓节点(7)包括底座(9)、边板(10)、纵向钢筋(11)、弯起钢筋(12)、连接钢筋(13)、螺母(14),所述底座(9)中间开有圆孔,所述连接钢筋(13)顶部制有螺纹,所述边板(10)焊接于底座(9)周围,所述纵向钢筋(11)、弯起钢筋(12)与上预制柱(4)一体预制,纵向钢筋(11)下端伸出上预制柱(4)在现浇节点区(8)内与边板(10)内侧上部焊接,弯起钢筋(12)焊接于边板(10)外侧下部,所述连接钢筋(13)与下预制柱(4)一体预 ...
【技术特征摘要】
1.一种螺栓连接装配整体式节点,包括第一预制混凝土梁(1)、第二预制混凝土梁(2)、上预制柱(3)、下预制柱(4)、预制板(5)、预制梁叠合层(6)、现浇节点区(8),其特征在于:还包括螺栓节点(7),所述第一预制混凝土梁(1)位于现浇节点区(8)左端,第二预制混凝土梁(2)位于现浇节点区(8)右端,上预制柱(3)位于现浇节点区(8)上端,下预制柱(4)位于现浇节点区(8)下端,预制板(5)位于第一预制混凝土梁(1)、第二预制混凝土梁(2)上端,预制梁叠合层(6)位于预制板(5)上端,所述上预制柱(3)与下预制柱(4)之间通过螺栓节点(7)连接;所述螺栓节点(7)包括底座(9)、边板(10)、纵向钢筋(11)、弯起钢筋(12)、连接钢筋(13)、螺母(14),所述底座(9)中间开有圆孔,所述连接钢筋(13)顶部制有螺纹,所述边板(10)焊接于底座(9)周围,所述纵向钢筋(11)、弯起钢筋(12)...