A high pressure and large flow of karst tunnel water plugging method, which comprises the following steps: using water detection operation combined with geophysical exploration and drilling, determine the water pressure and water; the construction of diversion Water Leakage; for a Water Leakage large channel plugging grouting; random carrying tunnel surrounding rock reinforcement; and from near to far in the end, from the top level of the final closure; a Water Leakage point closed plugging construction. The invention solves the problem of blocking and drainage of the karst tunnel with high water pressure and large flow rate, and reduces the risk of construction and later operation.
【技术实现步骤摘要】
高水压大流量岩溶隧道地下水封堵方法
:本专利技术属于隧道施工领域,特别涉及一种高水压大流量岩溶隧道地下水封堵方法。
技术介绍
:随着西部地区铁路网的拓展,特别是高速铁路的大量修建,在岩溶地区修建隧道不可避免。在岩溶区高水压的作用下,防排水设计及施工成为一项重要课题。
技术实现思路
:本专利技术的目的就在于提供一种高水压大流量岩溶隧道地下水封堵方法,该方法解决了高水压大流量岩溶隧道的封堵和排水问题,降低了施工及后期运营的风险。如上构思,本专利技术的技术方案是:一种高水压大流量岩溶隧道地下水封堵方法,其特征在于:包括如下步骤:①采用物探和钻探相配合的探水作业,确定水压和水量;②进行出漏水的分流施工;③进行出漏水大通道的封堵;④进行隧道围岩的随机注浆加固;⑤由近到远、由顶到底的分层次封堵;⑥最后的出漏水点的封闭封堵施工。所述步骤②的具体施工过程是:根据物探和钻探的结果,在隧道集中涌水范围内以水源位置为起点,设置不同深度和不同角度的分流减压孔,并安装上带高压阀的分流减压管,同时在出水周边布置灌浆堵水孔;所述步骤②中增加沉箱引排施工:在底板高压固结和周边分流孔施工完毕后,首先清 ...
【技术保护点】
一种高水压大流量岩溶隧道地下水封堵方法,其特征在于:包括如下步骤:①采用物探和钻探相配合的探水作业,确定水压和水量;②进行出漏水的分流施工;③进行出漏水大通道的封堵;④进行隧道围岩的随机注浆加固;⑤由近到远、由顶到底的分层次封堵;⑥最后的出漏水点的封闭封堵施工。
【技术特征摘要】
1.一种高水压大流量岩溶隧道地下水封堵方法,其特征在于:包括如下步骤:①采用物探和钻探相配合的探水作业,确定水压和水量;②进行出漏水的分流施工;③进行出漏水大通道的封堵;④进行隧道围岩的随机注浆加固;⑤由近到远、由顶到底的分层次封堵;⑥最后的出漏水点的封闭封堵施工。2.根据权利要求1所述的高水压大流量岩溶隧道地下水封堵方法,其特征在于:所述步骤②的具体施工过程是:根据物探和钻探的结果,在隧道集中涌水范围内以水源位置为起点,设置不同深度和不同角度的分流减压孔,并安装上带高压阀的分流减压管,同时在出...
【专利技术属性】
技术研发人员:张行道,段丁丁,赵国祝,韩伟辉,朴占华,李晓林,王海峰,董仲飞,王刚,谢波,高国梁,赵磊,乔玉海,兰杰,胡马俊,泊纯光,桑伟浪,衣志勇,唐少强,