The utility model discloses a steel tube head tool silty sand soil layer structure based on the pipe jacking construction, including the construction of underground pipeline is located in front of the steel tube and the tool head is installed on the bottom of the well work inside of the jacking equipment, the construction of underground pipeline is a pipeline assembly section from front to back and splicing the pipeline is located in the front section, assembling a plurality of pipe section for assembling steel sleeve head assembling front section; tool pipe installed in front of the front section assembly and includes a steel casing, mounted on the support ring and the inner side of the rear end of the steel sleeve is fixed on the support ring and the front end of the front section for assembling coaxially sheathed socket support ring steel tube and vertical layout, the rear wall of the rear wall of the steel tube and the support ring is flush, the front section of the front side wall assembly supporting the support ring. The utility model has the advantages of simple structure, reasonable design, convenient construction and good use effect, and can easily and rapidly complete the construction process of the ground pipe jacking of silt sand, and the construction process is safe and reliable.
【技术实现步骤摘要】
基于钢套头工具管的粉砂土地层顶管施工结构
本技术属于地下管道施工
,尤其是涉及一种基于钢套头工具管的粉砂土地层顶管施工结构。
技术介绍
顶管法是指隧道或地下管道穿越铁路、道路、河流或建筑物等各种障碍物时采用的一种暗挖式施工方法。在施工时,通过传力顶铁和导向轨道,用支承于基坑后座上的液压千斤顶将管压入土层中,同时挖除并运走管正面的泥土。当第一节管全部顶入土层后,接着将第二节管接在后面继续顶进,这样将一节节管子顶入,作好接口,建成涵管。工作井一般用于市政工程中的隧道或地铁的施工,也可以用于给水排水工程、油井、矿井工程的施工。市政顶管施工中工作井是顶进操作室,从工作井开始顶进,到接收井出来。接收井是接收顶管机或工具管的场所,与工作井相比,接收井布置比较简单,工作井是顶管施工的顶进工作场所。粉砂土是岩石经过风化作用后的产物,颗粒介于细砂土和粉土之间,其颗粒组成中以砂粒和粉粒为主,粘性颗粒含量相对较少。粉砂土地层是指土体为粉砂土的地层,该地层中顶管施工难度较大。如对处于沣河老河床川道的西咸国际文化教育园区内科技路污水管道工程进行施工时,所施工管道全长2026m,设计管径D1000mm,管道平均埋深12m,该工程地勘报告显示为耕土(Qpd)、第四系全新系统冲积(Q4al)黄土状土、冲积(Q4al)中砂和中粗砂、第四季上更新统冲积(Q3al)粉质粘土和粗砂、第四系中更新统冲积(Q2al)粉质粘土和粗砂。由于上述工程中顶管管位深度所在砂层为全断面粉砂土地层,含水量较大,成拱性差,因此必须考虑顶进时管顶砂层全部压在管顶上而导致正压力、侧压力引起的摩阻力加大;同时,饱和 ...
【技术保护点】
一种基于钢套头工具管的粉砂土地层顶管施工结构,其特征在于:包括位于所施工地下管道前端的钢套头工具管(2)和安装在工作井(1)内侧底部的顶进设备,所施工地下管道与钢套头工具管(2)呈同轴布设且二者组成待顶进管道;所施工地下管道为由多个管道拼装节(6)从前至后拼接而成且埋设于粉砂土地层内的拼接式管道,多个所述管道拼装节(6)中位于最前侧的管道拼装节(6)为前端拼装节,多个所述管道拼装节(6)中位于最后侧的管道拼装节(6)为后端拼装节;所施工地下管道为给排水管道或污水管道,所述管道拼装节(6)为预制混凝土管节;所述钢套头工具管(2)安装在所述前端拼装节前端;所述钢套头工具管(2)包括钢套管(2‑1)、安装在钢套管(2‑1)后端内侧的支撑环(2‑2)和固定在支撑环(2‑2)上且供所述前端拼装节前部同轴套装的插口(2‑3),所述钢套管(2‑1)、支撑环(2‑2)和插口(2‑3)呈同轴布设,所施工地下管道和钢套管(2‑1)均为圆管,所述钢套管(2‑1)的外径与所施工地下管道的外径相同,所述插口(2‑3)为圆筒状且其外径不大于所施工地下管道的内径,所述支撑环(2‑2)与钢套管(2‑1)呈垂直布设,所 ...
【技术特征摘要】
1.一种基于钢套头工具管的粉砂土地层顶管施工结构,其特征在于:包括位于所施工地下管道前端的钢套头工具管(2)和安装在工作井(1)内侧底部的顶进设备,所施工地下管道与钢套头工具管(2)呈同轴布设且二者组成待顶进管道;所施工地下管道为由多个管道拼装节(6)从前至后拼接而成且埋设于粉砂土地层内的拼接式管道,多个所述管道拼装节(6)中位于最前侧的管道拼装节(6)为前端拼装节,多个所述管道拼装节(6)中位于最后侧的管道拼装节(6)为后端拼装节;所施工地下管道为给排水管道或污水管道,所述管道拼装节(6)为预制混凝土管节;所述钢套头工具管(2)安装在所述前端拼装节前端;所述钢套头工具管(2)包括钢套管(2-1)、安装在钢套管(2-1)后端内侧的支撑环(2-2)和固定在支撑环(2-2)上且供所述前端拼装节前部同轴套装的插口(2-3),所述钢套管(2-1)、支撑环(2-2)和插口(2-3)呈同轴布设,所施工地下管道和钢套管(2-1)均为圆管,所述钢套管(2-1)的外径与所施工地下管道的外径相同,所述插口(2-3)为圆筒状且其外径不大于所施工地下管道的内径,所述支撑环(2-2)与钢套管(2-1)呈垂直布设,所述支撑环(2-2)的后侧壁与钢套管(2-1)的后侧壁相平齐,所述前端拼装节的前侧壁支顶在支撑环(2-2)上;所述钢套管(2-1)的壁厚为0.8cm~1.2cm且长度为80cm~120cm,所述管道拼装节不长度大于钢套管(2-1)的长度;所述顶进设备包括沿所施工地下管道的管道设计中心轴线对所述待顶进管道进行顶推的顶推设备(3)、供所述待顶进管道向前移动的导轨(4)、供顶推设备(3)后部支顶的后支顶机构和安装于顶推设备(3)前侧的顶铁(5),所述导轨(4)位于顶推设备(3)的正下方,所述后支顶机构固定在工作井(1)的后侧井壁(7)上,所述后支顶机构位于顶推设备(3)后侧,所述顶铁(5)位于顶推设备(3)与所述待顶进管道之间。2.按照权利要求1所述的基于钢套头工具管的粉砂土地层顶管施工结构,其特征在于:所述顶推设备(3)和导轨(4)均沿所施工地下管道的管道设计中心轴线布设。3.按照权利要求1或2所述的基于钢套头工具管的粉砂土地层顶管施工结构,其特征在于:所述插口(2-3)的长度为15cm~25cm。4.按照权利要求1或2所述的基于钢套头工具管的粉砂土地层顶管施工结构,其特征在于:所述支撑环(2-2)的外径与钢套管(2-1)的内径一致,所述支撑环(2-2)与钢套管(2-1)焊接固定为一体或加工制作为一体;所述插口(2-3)与支撑环(2-2)焊接固定为一体或加工制作为一体。5.按照权利要求1或2所述的基于钢套头工具管的粉砂土地层顶管施工结构,其特征在于:所述支撑环(2-2)为钢环或由多个圆弧形支撑钢板组成的圆形支撑环。6.按照权利要求1或2所述的基于钢套头工具管的粉砂土地层顶管施工结构,其特征在于:所述支撑环(2-2)为厚度为15cm~25cm的厚支撑环或厚度为0.8cm~1.2cm的薄支撑环,所述薄支撑环的前侧沿圆周方向设置有多道三角形加劲肋(2-4),所述...
【专利技术属性】
技术研发人员:吴光华,王晓峰,李任,马志强,
申请(专利权)人:中铁二十局集团第五工程有限公司,
类型:新型
国别省市:云南,53