The invention discloses a coordinated extraction and pressure relief method for high confined water and high gas coal seam groups. By opening a vertical borehole and opening coal seam boreholes connected to each coal seam in the vertical borehole, high pressure water is injected into the vertical boreholes and coal seam boreholes to realize coal seam fracturing. After coal seam fracturing, high pressure water is pumped out, and then a vertical borehole connected with hydrophobic boreholes is set up. Drainage main pipe is arranged in vertical boreholes, gas extraction branch pipe is arranged in coal seam boreholes, drainage branch pipe is arranged in drainage boreholes, and corresponding valves are installed to drain gas and water stored in aquifers in order, so as to realize \one hole, one tube and multi-purpose\ gas and high confined water extraction in coal seams, which has the advantages of simple construction procedure, low cost, high extraction and drainage efficiency.
【技术实现步骤摘要】
一种高承压水高瓦斯煤层群协调抽采卸压方法
本专利技术涉及煤矿开采
,尤其涉及一种高承压水高瓦斯煤层群协调抽采卸压方法。
技术介绍
我国东部矿区煤系地层多为煤层群条件,煤层瓦斯压力高且常伴有含水层,开采难度极大,为防止瓦斯、水害等事故,安全开采,在煤层开采前一方面需要先煤层实施钻孔,排放瓦斯;另一方面还要向含水层实施钻孔放水,目前的抽采卸压及排水疏放措施施工程序复杂,成本较高,且抽采、疏放效率低下。
技术实现思路
本专利技术提供了一种高承压水高瓦斯煤层群协调抽采卸压方法,可使施工程序简单,降低成本,且提高抽采和疏放的效率。本专利技术提供了一种高承压水高瓦斯煤层群协调抽采卸压方法,其包括:探测煤层的分布情况以及各个煤层与含水层的赋存情况;从地面实施垂直钻孔贯穿各个煤层直至最底层煤层内,并在贯穿每个煤层位置的所述垂直钻孔的孔壁上朝每个煤层内开设对应的煤层钻孔;在所述垂直钻孔内布置抽放总管,在各个所述煤层钻孔内布置与所述抽放总管相连的瓦斯抽采支管,通过所述抽放总管及所述瓦斯抽采支管向所述煤层钻孔内注入高压水,对各个煤层进行压裂处理,待各个煤层被压裂后将所述高压水抽离;待所述高压水被抽离后,自所述垂直钻孔内开设连通至所述含水层的排水钻孔;在所述排水钻孔内布置与所述抽放总管相连的疏水支管,所述抽放总管上设有总阀门,所述瓦斯抽采支管上设有瓦斯抽采阀门,所述疏水支管上设有疏水阀门;在所述垂直钻孔外设置与所述抽放总管相连的抽采设备,并启动所述抽采设备、打开所述总阀门及所述瓦斯抽采阀门,对各个煤层进行瓦斯抽离;待煤层内瓦斯浓度降至至安全范围时,关闭所述瓦斯抽采阀门,打开所述 ...
【技术保护点】
1.一种高承压水高瓦斯煤层群协调抽采卸压方法,其特征在于,包括:探测煤层的分布情况以及各个煤层与含水层的赋存情况;从地面实施垂直钻孔贯穿各个煤层直至最底层煤层内,并在贯穿每个煤层位置的所述垂直钻孔的孔壁上朝每个煤层内开设对应的煤层钻孔;在所述垂直钻孔内布置抽放总管,在各个所述煤层钻孔内布置与所述抽放总管相连的瓦斯抽采支管,通过所述抽放总管及所述瓦斯抽采支管向所述煤层钻孔内注入高压水,对各个煤层进行压裂处理,待各个煤层被压裂后将所述高压水抽离;待所述高压水被抽离后,自所述垂直钻孔内开设连通至所述含水层的排水钻孔,在所述排水钻孔内布置与所述抽放总管相连的疏水支管,所述抽放总管上设有总阀门,所述瓦斯抽采支管上设有瓦斯抽采阀门,所述疏水支管上设有疏水阀门;在所述垂直钻孔外设置与所述抽放总管相连的抽采设备,并启动所述抽采设备、打开所述总阀门及所述瓦斯抽采阀门,对各个煤层进行瓦斯抽离;待煤层内瓦斯浓度降至至安全范围时,关闭所述瓦斯抽采阀门,打开所述疏水阀门抽放含水层内的存储水。
【技术特征摘要】
1.一种高承压水高瓦斯煤层群协调抽采卸压方法,其特征在于,包括:探测煤层的分布情况以及各个煤层与含水层的赋存情况;从地面实施垂直钻孔贯穿各个煤层直至最底层煤层内,并在贯穿每个煤层位置的所述垂直钻孔的孔壁上朝每个煤层内开设对应的煤层钻孔;在所述垂直钻孔内布置抽放总管,在各个所述煤层钻孔内布置与所述抽放总管相连的瓦斯抽采支管,通过所述抽放总管及所述瓦斯抽采支管向所述煤层钻孔内注入高压水,对各个煤层进行压裂处理,待各个煤层被压裂后将所述高压水抽离;待所述高压水被抽离后,自所述垂直钻孔内开设连通至所述含水层的排水钻孔,在所述排水钻孔内布置与所述抽放总管相连的疏水支管,所述抽放总管上设有总阀门,所述瓦斯抽采支管上设有瓦斯抽采阀门,所述疏水支管上设...
【专利技术属性】
技术研发人员:王磊,袁秋鹏,焦振华,
申请(专利权)人:安徽理工大学,
类型:发明
国别省市:安徽,34