The utility model provides a large-flow groundwater drainage structure, which comprises a permanent drainage channel and a drainage steel pipe; the drainage steel pipe connects the centralized water inflow point of the underground cavern and the permanent drainage channel; the centralized water inflow point has a water bin, and the drainage steel pipe connects to the centralized water outflow point sump; the drainage steel pipe is provided with a valve and a pressure gauge. The utility model can effectively and safely control the high-pressure and large-flow inrush point, ensure the permanent safety of the structure, and reduce the overall treatment difficulty, treatment time limit and project investment.
【技术实现步骤摘要】
一种大流量地下水引排结构
本技术涉及岩溶地区或地下水发育的地下工程,尤其涉及一种大流量地下水引排结构。
技术介绍
岩溶地区的地下工程,岩溶水文地质条件较为复杂,岩溶裂隙水丰富,目前国内外对地下工程开挖施工前方含水情况都十分重视,已有许多探测岩溶和裂隙水的方法,如水文地质法、探地雷达、红外线技术(岩体温度法)、瞬变电磁法等。但是实践表明,现有的超前地质预报方法仍无法准确预报与定位地下水,在开挖施工过程中往往导致地下突涌水灾害的发生,甚至造成重大灾难事故,因此必须要对地下水进行有效的治理。对于岩溶地区地下工程来说,施工中应尽量对可能产生突涌水的地段预先采取措施进行处理,尽量避免揭穿岩溶水后再处理,对于不同类型、不同流量、不同压力、不同部位的地下水,需要制定针对性的治理措施,遵循“重视疏导、堵排结合、因地制宜、综合治理”的原则。因此需要从地下水治理的总体规划设计和综合治理技术入手,将不同类型的地下水问题彻底解决,改善工程的施工条件,规避施工风险,才能确保工程的顺利贯通,但大流量地下水的治理难度非常大,需要针对不同地下水发育条件和工程环境,对地下水治理技术进一步细化,保证地下工程的永久安全。对于部分高压大流量突涌水点治理,若采用全部封堵,难度大、工期长,且封堵后的高压大流量地下水将在附近洞段聚集抬升,威胁地下工程本身及邻近洞段围岩稳定和隧洞运行安全。
技术实现思路
本技术所要解决的技术问题是提供一种大流量地下水引排结构,能够对高压大流量突涌水点安全有效地治理。为此,本技术采用以下技术方案:一种大流量地下水引排结构,其特征在于所述引排结构包括永久排水通道和排水钢管;所述排水 ...
【技术保护点】
1.一种大流量地下水引排结构,其特征在于所述引排结构包括永久排水通道和排水钢管;所述排水钢管连接地下洞室集中涌水点和所述永久排水通道;所述集中涌水点处具有水仓,排水钢管接入到集中出水点水仓;所述排水钢管上设有阀门和压力表;对突涌水带及上下游影响带进行12~15m的深层高压无盖重防渗固结灌浆,形成无盖重防渗固结灌浆凝结结构。
【技术特征摘要】
1.一种大流量地下水引排结构,其特征在于所述引排结构包括永久排水通道和排水钢管;所述排水钢管连接地下洞室集中涌水点和所述永久排水通道;所述集中涌水点处具有水仓,排水钢管接入到集中出水点水仓;所述排水钢管上设有阀门和压力表;对突涌水带及上下游影响带进行12~15m的深层高压无盖重防渗固结灌浆,形成无盖重防渗固结灌浆凝结结构。2.如权利要求1所述的一种大流量地下水引排结构,其特征在于所述排水钢管包括第一钢管和第...
【专利技术属性】
技术研发人员:刘宁,张春生,吴关叶,潘益斌,张洋,
申请(专利权)人:中国电建集团华东勘测设计研究院有限公司,
类型:新型
国别省市:浙江,33