水钻挖孔桩施工方法技术

技术编号:6053469 阅读:1188 留言:0更新日期:2012-04-11 18:40
水钻挖孔桩施工方法,采用分层施工,在每一层施工时,先利用水钻环绕桩孔内壁钻取一定高度的若干柱体岩芯,使桩基岩芯与整体岩石分离,形成一个临空面,然后用手电钻在桩基岩芯上打孔,在孔内分别插入钢楔,接着用铁锤锤击钢楔,钢楔给予桩基岩芯一个水平拉力和剪切应力,当水平拉力、剪切应力大于岩石的极限抗拉和抗剪切应力时,桩基岩芯就会发生拉裂和剪切破坏,与整体岩石分裂,将破碎的岩石清除出桩孔,修正桩孔,然后按同样的工序进行下一层施工,如此循环施工,直至桩孔成孔。

Construction method of diamond digging hole pile

Diamond construction method of digging hole pile, stratified construction, in each layer construction, first use the diamond drill hole pile wall around certain height of the plurality of columns from the pile foundation from the core and the whole rock, the formation of a free surface, and then use the drill holes in the pile foundation on the core in the hole were inserted into the steel wedge, then hammering the steel wedge, the steel wedge pile foundation of a given core level of tension and shear stress, when the tensile stress is greater than the horizontal tension and shear of rock and shear stress, pile foundation core occurs crack and shear failure, split and whole rock, will be broken the rock out of pile hole, fixed pile holes, and then press the same process for the next layer construction, so the cycle of construction, until the pile hole into the hole.

【技术实现步骤摘要】

【技术保护点】
水钻挖孔桩施工方法,其特征在于,包括以下步骤:(1)桩孔测量放样:标出桩孔准确位置,按照桩位挖除覆盖层至岩石露出,标出设计桩中心;(2)布置水钻取芯点:环绕所标出的桩孔的内壁布置水钻取芯点,取芯点布置个数=π×(桩孔直径-水钻直径)/水钻直径;(3)钻取柱体岩芯:在每个取芯点用水钻向下钻取一定高度的柱体岩芯,水钻运转过程中通过冷却水流对水钻钻头进行冷却;将钻取的岩芯完全取出,使桩孔中间形成一个与桩孔内壁完全分开的桩基岩芯;(4)桩基岩芯布点打孔:用电钻在所述桩基岩芯上钻至少三个小孔;(5)分裂桩基岩芯:在所述小孔内打入钢楔,用大锤捶击钢楔,使桩基岩芯完全破裂;(6)出渣:将水钻钻取的柱体岩芯、...

【技术特征摘要】

【专利技术属性】
技术研发人员:王林国陈卫华薛维龙张志龙万刚邓平
申请(专利权)人:中交第四公路工程局有限公司
类型:发明
国别省市:11

网友询问留言 已有0条评论
  • 还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。

1