本发明专利技术涉及建筑工程设备领域,具体公开一种组合式钢套管,包括多个钢套管;用于连接多个钢套管,安装在所述多个钢套管外侧的定位杆,和焊接在两个钢套管中部,依次将所述多个钢套管连接的定位组件。本发明专利技术优点是,采用本发明专利技术的组合式套管后,在进行混凝土浇筑时,套管不受混凝土的影响和其它设备振动的影响,安装固定可靠,方便使用。同时,施工时,组合式套管一次性固定到位,无需依次进行固定安装,减少施工工序,施工效率高。

A combined steel casing

The invention relates to the field of construction engineering equipment, in particular to a combined steel casing, including a plurality of steel casings; a positioning rod for connecting a plurality of steel casings, installed on the outside of the plurality of steel casings, and a positioning component welded in the middle of the two steel casings, successively connecting the plurality of steel casings. The utility model has the advantages that after adopting the combined casing, the casing is not affected by the concrete and other equipment vibration during the concrete pouring, and the installation is reliable and convenient for use. At the same time, during the construction, the combined casing is fixed in place at one time, which does not need to be fixed in order to reduce the construction process and high construction efficiency.

【技术实现步骤摘要】
一种组合式钢套管
本专利技术涉及建筑工程设备领域,特别是指一种组合式钢套管设备。
技术介绍
随着建筑业的快速发展,确保工程质量的提高,现有技术中对管道安装的方法是在管道井顶板混凝土浇筑时预留孔洞;然后进行掉线、安装管道;最后封堵管道周围缝隙尽管现有技术已经采用在浇注混凝土时,直接预埋套管,减少了施工中预留孔洞,二次安装管套及洞口的修补,减少了工序。然而,对套管进行浇注混凝土定位时,混凝土的移动会对套管发生挤压,振动泵会对套管造成冲击、使套管定位发生偏差。因此,套管定位容易出现误差,造成上下管道连接偏差出现渗水现象。
技术实现思路
本专利技术的目的就是为了克服上述现有技术存在的问题,提供一种组合式钢套管,以实现套管的准确定位,使用本专利技术的管道井组合式钢套管可以一次性预埋到位,管道安装严密,不发生漏水。为了实现上述目的,本专利技术采用了以下的技术方案:一种组合式钢套管,其特征在于:包括多个钢套管;用于连接多个钢套管,安装在所述多个钢套管外侧的定位杆;和,焊接在两个钢套管中部,依次将所述多个钢套本文档来自技高网...

【技术保护点】
1.一种组合式钢套管,其特征在于,包括多个钢套管(1);用于连接多个钢套管,安装在所述多个钢套管外侧的定位杆(2),和,焊接在两个钢套管中部,依次将所述多个钢套管连接的定位组件(3),所述定位组件(3)是多根位于同一水平线上的钢棍。/n

【技术特征摘要】
1.一种组合式钢套管,其特征在于,包括多个钢套管(1);用于连接多个钢套管,安装在所述多个钢套管外侧的定位杆(2),和,焊接在两个钢套管中部,依次将所述多个钢套管连接的定位组件(3...